NP Nithin Palal

Natural Resource Management and Environment

Chapter 7 · pages 249 to 322 of the Survey · 7 figures · 54 tables

This chapter does not number its paragraphs. Its figures, tables, appendix tables and boxes have their own addresses, as #chart-…, #table-…, #table-A… and #box-…, and so does each heading.

Karnataka’s approach to natural resource governance reflects a progressive and structured commitment to ecological security, sustainable utilisation, economic development, livelihood sustainability, and environmental resilience. Forests, water resources, biodiversity, minerals and coastal ecosystems together constitute the State’s natural capital, requiring careful conservation and scientific management. Trends in forest area and cover, district-wise distribution, biodiversity status and inter-state comparisons reflect measurable progress, while also highlighting emerging environmental pressures such as climate variability, human–wildlife conflict, habitat fragmentation and resource degradation. The Government has adopted a structured and progressive approach encompassing expansion of the protected area network, wildlife conservation, mitigation of human–animal conflict, watershed and afforestation programmes, eco-restoration, and promotion of responsible eco-tourism. Supported by State initiatives and Centrally Sponsored Schemes such as Project Tiger, Project Elephant, and the Green India Mission, alongside institutional strengthening and resource mobilisation, Karnataka advances a balanced strategy that integrates conservation, tourism development, community participation and sustainable resource use to ensure longterm ecological resilience and inclusive growth.

Natural Resource Management and Environmental Governance

Natural resource management and environmental governance form a cornerstone of Karnataka’s sustainable development strategy. The State has consistently sought to reconcile economic expansion with ecological stewardship, recognising that long-term growth depends on the preservation of natural capital. With substantial forest and tree cover, globally significant biodiversity zones and scientifically designed watershed systems, Karnataka’s environmental assets play a critical role in sustaining livelihoods, regulating climate and maintaining ecosystem balance. However, rapid urbanisation, climate variability, rising waste generation, and competing land-use pressures have intensified environmental stress. In response, the State has strengthened institutional frameworks for climate governance, disaster monitoring, biodiversity management and technology-driven resource administration. These efforts reflect a commitment to resilient, inclusive and environmentally sustainable growth that safeguards both ecological integrity and economic opportunity.

§ 7.1Forests

Forests constitute a vital component of Karnataka’s natural capital, supporting biodiversity, economic activity, and ecological stability. The State encompasses nearly 60 per cent of the Western Ghats, one of the world’s recognised biodiversity hotspots. This region forms part of one of the 35 global biodiversity hotspots and one of the four in India, underscoring its ecological significance. To strengthen local biodiversity governance, 6,554 Biodiversity Management Committees (BMCs) have been constituted at the Gram Panchayat level. Conservation of unique genetic resources is further promoted through notification of Biodiversity Heritage Sites, such as the 400-year-old tamarind groves at Nallur in Devanahalli taluk of Bengaluru Rural district. These initiatives reflect an effort to embed conservation within local governance structures. Despite measurable progress in forest protection, ecological pressures persist, particularly in the Western Ghats. While the rate of deforestation has declined and forest cover has improved quantitatively, concerns remain regarding forest quality and ecological integrity. Degradation affects ecosystem services such as water regulation, soil conservation, carbon sequestration and habitat stability, thereby posing risks to environmental sustainability and the livelihoods of forest-dependent communities. Forest resources contribute significantly to the State’s economy through timber, medicinal plants, non-timber forest products (NTFPs), grazing, eco-tourism, watershed services, and carbon storage. At the same time, population growth, infrastructure expansion, mining, encroachment, habitat fragmentation, illegal timber extraction, poaching, excessive fuelwood collection and unregulated grazing exert sustained pressure on forest ecosystems. Balancing developmental imperatives with ecological conservation remains a continuing policy challenge. The Karnataka Forest Department has taken steps to arrest quantitative forest loss through afforestation programmes, strengthened protection measures and participatory forest management. Community involvement in the regeneration of degraded forests, along with the promotion of eco-tourism and biodiversity conservation, has become central to forest governance. Yet, ensuring long-term sustainability requires sustained efforts to improve forest quality, restore degraded landscapes and enhance ecosystem resilience.

§ 7.1.1Area under Forests

Karnataka is the seventh largest State in India, covering 1,91,791 sq. km and accounting for 5.83 per cent of the country’s total land area. Its varied climate, topography, and soil conditions have produced diverse ecological zones that support rich biological diversity. The total forest area in Karnataka stands at 40,678.23 sq. km. This includes Reserved Forests, Protected Forests, Village Forests, Private Forests, Section 4–notified forests, Unclassed Forests and other forests notified under statutory provisions. According to the Champion and Seth (1968) classification, the State’s forests are grouped into eight major forest groups, further subdivided into 21 distinct forest types. The evergreen forests of the Western Ghats dominate the landscape, while scrub and thorn forests are found in drier regions. Major tree species include teak (Tectona grandis), sandalwood (Santalum album), rosewood (Dalbergia latifolia) and species of Terminalia and Pterocarpus, alongside dryland species such as Balanitesroxburghii, Cordiamyxa, Capparis, Acacia and Prosopis. Through biodiversity conservation, participatory forest management and sustainable utilisation of forest resources, Karnataka continues to integrate environmental protection with livelihood security and long-term ecological resilience. The details of Classification of the total forest area in Karnataka are given in Table 7.1 and Figure 7.1.

Table 7.1Classification of forest areas in Karnataka
Legal StatusArea (Sq. Km.)% of Geographical area
Reserved Forests30,849.4516.08
Protected Forests2,001.031.04
Village Forests87.950.05
Private Forests52.470.03
Notified u/s 4 of KFA 19632,318.501.21
Unclassed forests*5,368.832.80
Total40,678.2321.21
Source: APCCF (Working plan) as per 2024-25 Annual Report. * Includes Forest areas which are not notified, but categorized as Forest as per statutory provisions and Deemed forests. · Survey, p. 250

In the previous forest classification, Deemed Forest, Statutory Forest, Reserved Forest as per Section 4 of the Karnataka Forest Act-1963 and all forest areas identified in government documents were considered as Unclassified Forest.

Figure 7.1Classification of Total Forest Area (% to geographical area) in Karnataka
  • Reserved Forests16.08%
  • Protected Forests1.04%
  • Village Forests0.05%
  • Private Forests0.03%
  • Notified u/s 4 of KFA 19631.21%
  • Unclassed forests*2.80%

Each slice is a per cent of the State's geographical area, not of forest area, so the slices add up to 21.21 rather than 100. The Survey notes that the total forest area is still being reconciled under the Geo-Spatial Forest Information System project.

The numbers
SharePer cent
Reserved Forests16.08
Protected Forests1.04
Village Forests0.05
Private Forests0.03
Notified u/s 4 of KFA 19631.21
Unclassed forests*2.80

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Note: The total extent of forest land/area in the State is under the reconciliation process under Geo-Spatial Forest Information System project. · Survey, p. 251

1) As per ISFR-Forest Cover means “All lands, more than one hectare in area, with a tree canopy density of more than 10 percent irrespective of ownership and legal status. Such lands may not necessarily be a recorded forest area. It also includes orchards, bamboo and palm”. 2) Tree Cover means “It comprises of trees patches of size less than 1ha occurring outside the recorded forest area. Tree cover includes trees in all formation including scattered trees”. The Forest Cover inside and outside Recorded Forest Area (RFA) has been analysed in different categories and presented in Table 7.2 and Figure 7.2.

Table 7.2Forest cover inside and outside recorded Forest Area as per Forest Survey of India -2023
Forest Cover Inside the Recorded Forest Area (or Green Wash) (Sq.Km)Forest Cover Outside the Recorded Forest Area (or Green Wash) (Sq.Km)Tree Cover (Sq.Km)
VDFMDFOFTOTALVDFMDFOFTOTALTotal
3,737.9012,876.976,399.0323,013.90799.898,274.787,165.7016,240.377,779.15
16.24%55.95%27.81%4.93%50.95%44.12%
Area under forest coverArea in Sq. km
Forest cover within Recorded Forest Area23,013.90
Forest cover outside Recorded Forest Area16,240.37
Tree cover7,779.15
Total47,033.42
Of State’s Geographical Areas24.52%
Source: Forest Survey of India 2023. · Survey, p. 251
Figure 7.2Forest Cover Inside and Outside of RFA in Karnataka (Sq.km)
  • Inside RFA
  • Outside RFA
  • Tree Cover
Sq. km
02,0004,0006,0008,00010,00012,00014,000
VDFMDFOFTree Cover

VDF is very dense forest, MDF moderately dense forest, OF open forest and RFA recorded forest area. Tree cover is shown as one figure, not split by RFA.

The numbers
Inside RFAOutside RFATree Cover
VDF3,737.90799.89–
MDF12,876.978,274.78–
OF6,399.037,165.70–
Tree Cover––7,779.15

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 252
Table 7.3District wise Forest Cover along with Geographical Area in 2023 (Area in sq.km)
DistrictGeographical AreaVery Dense ForestMod. Dense ForestOpen ForestTotal Forest Area% of Geog. areaChangeScrub
Bagalkot6,5520.0019.23244.24263.564.022.23390.29
Bengaluru Urban2,1960.0025.65258.63284.2812.95-0.5624.09
Bengaluru Rural2,2980.0022.92121.00143.926.26-5.5112.25
Belagavi13,43335.30724.61394.381154.298.594.75666.12
Ballari8,4610.00109.10618.52727.628.60-2.81477.91
Bidar5,4480.0021.8179.81101.621.871.5847.41
Chamarajanagar5,64893.001,517.811,121.002,731.8148.3717.28125.27
Chikmagaluru7,202900.782,609.11548.074,057.9656.3422.2776.72
Chikkaballapura4,2440.0019.58258.61278.196.551.57181.51
Chitradurga8,4360.0047.29570.90618.197.3310.50578.94
Dakshina Kannada4,861546.311605.511149.573301.3967.923.032.69
Davangere5,92410.63163.52533.89708.0411.953.42303.34
Dharwad4,2600.00223.91158.64382.558.983.883.84
Gadag4,6570.000.58140.59141.173.030.23119.04
Kalaburagi10,9540.0091.93104.04195.871.792.6739.39
Hassan6,814147.24785.19572.741,505.1720.094.1671.75
Haveri4,8230.00145.88212.70358.587.439.5194.84
Kodagu4,102788.511871.04574.563,234.1178.846.980.87
Kolar3,9790.0057.63339.55397.189.987.3666.88
Koppal5,5700.000.4736.4136.880.661.19167.24
Mandya4,9620.01109.64432.04541.6910.921.19105.46
Mysuru6,307121.21573.10348.751,043.0616.5412.5134.34
Raichur8,4420.001.0847.3048.380.571.05189.06
Ramanagara3,5160.00196.15494.50690.6519.6412.93170.11
Shivamogga8,478495.442870.65925.344,291.4350.6210.6521.27
Tumkuru10,5970.0073.431,347.471,420.9013.4113.08399.50
Udupi3,582232.841,385.61661.202,279.6563.64-4.040.00
Utat ra Kannada10,2771,166.525,861.391,115.628,143.5379.247.003.26
Vijayapura10,4980.000.6825.4526.130.25-0.437.81
Yadgiri52700.0017.26129.21146.472.780.03131.95
Total1,91,7914,537.7921,151.7513,564.7339,254.2720.47147.704,513.15
Source: IFSR 2023. · Survey, p. 252
Table 7.4Forest cover according to Forest Survey of India (Area in Sq.km)
Forest ClassYear wise Forest cover (area in Sq.km)
2017201920212023
Dense Forest24,94625,54925,51825,689.54
Open Forest12,60413,02613,21213,564.73
Total37,55038,57538,73039,254.27
India7,01,4957,12,2497,13,7897,15,342.61
% forest cover of state vis-a vis India5.195.415.425.48
Source: Forest Survey of India 2023. · Survey, p. 253
Table 7.5Forest Cover Change Matrix of Karnataka according to Forest Survey of India (Area in Sq. Km)
Forest Cover2023 AssessmentTotal
VDFMDFOFScrubNF
Very Dense Forest (VDF)4,533.660.000.140.001.204535
Moderately Dense Forest (MDF)3.6121,133.997.982.0132.9021,180.49
Open Forest (OF)0.114.1213,227.3522.24137.2613,391.08
Scrub0.000.0566.044,316.3276.204,458.61
Non-Forest (NF)0.4113.59263.22172.581,47,776.021,48,225.82
Total ISFR 20234,537.7921,151.7513,564.734,513.151,48,023.581,91,791
Net Change4.79166.75352.73-97.85-426.42
Source: Forest Survey of India 2023. · Survey, p. 253
Figure 7.3Forest Cover Change Matrix (Sq km) as per Forest Survey of India 2023
  • Very Dense Forest (VDF): 4,538 sq km2%
  • Moderately Dense Forest (MDF): 21,152 sq km11%
  • Open Forest (OF): 13,565 sq km7%
  • Scrub: 4,513 sq km2%
  • Non-Forest (NF): 1,48,024 sq km77%

The Survey calls this a change matrix, but it shows the 2023 extent of each class, not changes between assessments. The printed whole number shares add up to 99 because of rounding. The areas add up to 1,91,792 sq km.

The numbers
SharePer cent
Very Dense Forest (VDF): 4,538 sq km2
Moderately Dense Forest (MDF): 21,152 sq km11
Open Forest (OF): 13,565 sq km7
Scrub: 4,513 sq km2
Non-Forest (NF): 1,48,024 sq km77

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 254

A. Comparison with Southern States

Forest cover in Karnataka is 20.47% to total geographical area of the state as per Forest Survey of India, whereas, in southern states Kerala has highest proportion of forest cover to its total area. The comparison with neighboring states is given in Table 7.6 and Figure 7.4.

Table 7.6Comparison with southern states (Area in Sq.Km)
StateGeographical areaTotal Forest coverPercentage of Geographical area %
Maharashtra3,07,71350,85916.53
Andhra Pradesh1,62,96830,08518.46
Telangana1,12,07721,17918.90
Karnataka1,91,79139,25420.47
Tamilnadu1,30,06026,45020.34
Kerala38,85222,05956.78
Southern states (India)9,43,4611,89,88620.13
India32,87,4697,15,34321.76
Source: ISFR -2023. · Survey, p. 254
Figure 7.4Forest cover to Geographical area
  • Forest cover (% of geographical area)
India21.76
Southern states (India)20.13
Kerala56.78
Tamilnadu20.34
Karnataka20.47
Telangana18.90
Andhra Pradesh18.46
Maharashtra16.53

Maharashtra is not a southern state but is included in the Survey's comparison.

The numbers
Forest cover (% of geographical area)
India21.76
Southern states (India)20.13
Kerala56.78
Tamilnadu20.34
Karnataka20.47
Telangana18.90
Andhra Pradesh18.46
Maharashtra16.53

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 255

B. Forest cover in Different Forest Types

Table 7.7Area Statistics of the Forest Types found in Karnataka
Forest TypeArea (in sq.km)% of the Total Mapped Area
1A/C4 West Coast tropical evergreen forest5,239.1011.95
2A/C2 West Coast semi-evergreen forest4,381.5510.00
2A/2S1 West Coast secondary evergreen Forest (Dipterocarp)338.860.77
2/E3 Moist bamboo brakes1.860.00
2/E4 Lateritic semi-evergreen forest159.620.36
3B/C1a Very moist teak forest89.870.21
3B/C1b Moist teak forest1,796.294.10
3B/C1c Slightly moist teak forest992.402.26
3B/C2 Southern moist mixed deciduous forest4,921.8111.23
3B/C2/2S1 Southern secondary moist mixed deciduous forest695.591.59
4B/TS1 Mangrove scrub9.000.02
5A/C1a Very dry teak forest22.540.05
5A/C1b Dry teak forest2,515.075.74
5A/C3 Southern dry mixed deciduous forest3,156.617.20
5/DS1 Dry deciduous scrub2,930.396.69
5/E4 Hardwickia forest414.930.95
5/E7 Laterite thorn forest126.710.29
5/2S1 Secondary dry deciduous forest38.910.09
6A/C1 Southern thorn forest 1,882.80 4.301,882.804.30
6A/DS1 Southern thorn scrub3,364.017.68
8A/C1 Nilgiri subtropical hill forest371.190.85
Sub Total:33,449.1176.33
TOF/ Plantation10,318.3123.54
Total (Forest Cover & Scrub)43,767.4299.87
5/DS4 Dry grassland54.330.12
8A/C1/DS1 South Indian sub-tropical hillsavannah(woodland)2.650.01
Sub Total56.980.13
Grand Total43,824.40100.00
Source: ISFR -2023. · Survey, p. 255

C. Tree Cover and Forest Cover

The estimated forest cover is 20.47% and the tree cover is 4.05% of the geographical area, totaling 24.52%. The details are given in Table 7.8.

Table 7.8Forest and Tree Cover
CategoryArea (in sq. km.)% of Geographical Area
Tree Cover7,779.154.05
Forest Cover39,254.2720.47
Total Forest & Tree Cover47,033.4224.52
Source: Forest Survey of India 2023 · Survey, p. 256

§ 7.1.2National parks and Wildlife Sanctuaries

The forests of Karnataka support a wide range of flora and fauna (biodiversity) through a network of wellconnected and protected wildlife sanctuaries and national parks. The state has 5 national parks and 37 sanctuaries (including 5 Tiger Reserves) covering an area of 11,070.40 Sq. km. Apart from the National Parks and Sanctuaries, the state has 19 Conservation Reserves and 1 Community Reserve, comprising 329.09 Sq.km. as presented in Table 7.9, 7.10, and 7.11.

Table 7.9Wildlife preservation: National Parks/Bird Sanctuaries/Wildlife Sanctuaries: Details of Circle/Division-wise
Sl. No.CircleDivisionNational Park / Wildlife SanctuaryArea (Sq.Kms)
1CF BengaluruDCF, Bannerghatat National Park1. Bannerghatat National Park260.51
2CCF, MangaloreDCF, Kudremukh WL Dvn, Karkala2. Kudremukh National Park600.57
3CF KanaraDCF & Director, Kali Tiger Reserve Dandeli3. Anshi National Park / Tiger Reserve417.34
4APCCF Field Director Project Tiger, MysuruCF & Director Bandipur Tiger Reserve4. Bandipur National Park/ Tiger Reserve872.24
DCF & Director Hunsur, Nagarahole National Park5. Nagarahole National Park/Tiger Reserve643.39
Total Area(A)2794.05
Survey, p. 256
Table 7.10Details of Circle/Division-wise sanctuaries with extent in Karnataka (B)
Sl. No.CircleDivisionNational Park / Wildlife SanctuaryArea (Sq.Kms)
1CF BengaluruDCF, Ramanagara Dvn.1. RamadevaraBetat Vulture Sanctuary3.46
DCF, Kolar Dvn.2. Kamsandra Wildlife Sanctuary78.62
2CCF, MysuruDCF, WLD, Mysuru3. Adichunchanagiri Peacock Wildlife Sanctuary0.80
4. Ranganathittu Bird Sanctuary0.67
5. Arabithittu Wildlife Sanctuary13.50
6. Melkote Wildlife Sanctuary49.82
3CCF, ChamarajanagarDCF & Director, BRT Tiger Reserve Chamarajanagar7. BRT Wild life Sanctuary / Tiger Reserve539.52
DCF, Cauvery WLD, Kollegal8. Cauvery Wildlife Sanctuary Cauvery Extension Wildlife Sanctuary,1080.92
DCF M.M.Hills WLD, Kollegal9. Malai Mahadeshwara Wildlife Sanctuary906.19
4CCF, KodaguDCF, WLD, Madikeri10. Pushpagiri Wildlife Sanctuary102.92
11. Talacauvery Wildlife Sanctuary105.59
12. Bramhagiri Wildlife Sanctuary181.29
5CCF, MangaloreDCF, Kudremukh WL Dvn, Karkala13. Someshwara Wildlife Sanctuary314.25
14. Mookambika WildlifeSanctuary370.37
6CF Kanara, SirsiDCF & Director, Kali Tiger Reserve Dandeli15. Dandeli Wild life Sanctuary/ Tiger Reserve886.41
DCF, Yellapura (T)16. Attiveri Bird Sanctuary2.23
DCF, Honnava (T)17. Apsarakonda-Mugali Marine Wildlife Sanctuary59.59
7CCF, ShivamoggaDCF, WL Dvn., Shivamogga18. Shettihalli Wildlife Sanctuary395.60
19. Sharavathi Valley LTM Sanctuary,930.16
20. Gudavi Bird Sanctuary0.74
8CCF ChikmgalurCF & Director, Bhadra T.R.21. Bhadra Wildlife Sanctuary/ TigerReserve500.16
9CCF, DharwadDCF, Haveri Dn.22. Ranebennur Blackbuck Sanctuary119.00
DCF, Gadag Dn.23. Kappathagudda WildlifeSanctuary244.15
10.CCF, BallariDCF, Vijayanagara, (T)24. Daroji Bear Sanctuary82.72
25. Gudekote Sloth Bear Sanctuary Gudekote Extension Sloth Bear Sanctuary167.66
DCF, Davanagere (T) Dvn, Davanagere26.Rangayyadurga Four Horned Antelope Wildlife Sanctuary77.24
DCF, Chitradurga27. Jogimatti Wildlife Sanctuary100.48
28. Utat regudda WL Sanctuary189.26
DCF, Koppal29. Bankapur Wolf Sanctuary3.327
11APCCF Field Director Project Tiger, MysuruCF & Director Bandipur Tiger Reserve30.Nugu Wildlife Sanctuary30.32
12CCF, BelagaviDCF, Belagavi (T) Dvn, Belagavi31. Bhimgad Wildlife Sanctuary190.42
DCF, Gokak (T) Dvn, Gokak32. Ghataprabha Bird Sanctuary29.785
DCF, Bagalkote (T)33. YadahalliChinkara Wildlife Sanctuary96.36
13CCF, KalburgiDCF, Kalburgi (T) Dvn. Kalburgi34. Chincholi Wildlife Sanctuary134.88
14CCF, HassanDCF, Tumkur (T) Dvn., Tumkur35. Thimlapura Wildlife Sanctuary50.86
36. Bukkapatat Chinkara Wildlife Sanctuary136.11
DCF, Hassan (T) Dvn, Hassan37. Arasikere Sloth Bear Sanctuary100.88
Total Area(A)8276.35
Survey, p. 257
Table 7.11Conservation & Community Reserves (C) and (D)
Sl. No.CircleDivisionConservation / Community ReservesArea (in Sq. Kms)
1DharwadHaveriBankapura Peacock Conservation Reserve0.56
2GadagMagadiKere Conservation Reserve0.54
3HassanTumkurMydhanahalli (Jayamangali) Black Buck Conservation Reserve.3.23
4Thimlapura Conservation Reserve17.38
5ChikkamagaluruChikkamagaluruBasur Amruth Mahal Kaval Conservation Reserve7.36
6CanaraHaliyalaHornbill Conservation Reserve52.50
7SirsiBedthi Conservation Reserve57.30
8Shalmala Riparian Eco-System Conservation Reserve4.89
9Mundige Lake and Bird Conservation Reserve0.16
10BallariVijayanagarThungabhdra Otet r Conservation Reserve (Approximate)20.00
11Ankasamudra Birds Conservation Reservation Reserve0.99
12KoppalHiresulikere Bear Conservation Reservation Reserve11.809
13BengaluruBengaluru (Urban)Putet nahalli Lake Birds Conservation Reserve0.15
14Greater Hesaraghatat Grassland Conservation Reserve22.982
15KolarKolara leaf Nosed Bat Conservation Reserve, Kolar Division0.90
16MysuruMysuru WLMelapura Bee Eater Bird Conservation Reserve0.03
17KalaburgiYadagiriBonal Bird Conservation Reserve, Yadgiri Division2.73
18ChamarajanagarBRTUmmathur Conservation Reserve (Chamarajnagar Dist.), BRT Tiger Reserve6.08
19BelagaviBagalkotChikkasangam Bird Conservation Reserve116.38
CONSERVATION RESERVE (C) TOTAL325.97
COMMUNITY RESERVE (D)
1MysuruMysuru Wild lifeKokkarebellur Community Reserve, Mysuru WL Division3.12
TOTAL (C+D)329.09
GRAND TOTAL(A+B+C+D)11,399.50
Survey, p. 258

Karnataka accounts for nearly 25% of the country’s elephant population. As per the 2023 elephant population estimation, the State has an estimated 6,395 elephants, highlighting its critical role in elephant conservation at the national level. The State also has five Tiger Reserves and, according to the All India Tiger Estimation 2022, Karnataka is ranked as the second-largest Tiger State in the country, with an estimated population of 563 tigers. In a significant conservation initiative, the State has, for the first time, notified a marine wildlife sanctuary. An area of 5,959.32 hectares, comprising a 6 km stretch of coastal area and adjoining forest land in Honnavar taluk of Uttara Kannada district, was declared as the “Apsarakonda–Mugali Marine Wildlife Sanctuary” on 24 June 2025. The sanctuary aims to protect marine biodiversity and conserve breeding and nesting habitats. To address human–wildlife conflict and strengthen forest protection mechanisms, the Karnataka Forest Department has established an Integrated Command and Control Centre (ICCC) at the State Headquarters in Bengaluru, along with Divisional/District Command and Control Centres (DCCCs) in 11 high Human–Elephant conflict divisions. These centres are envisaged to function as centralised platforms for real-time monitoring, coordination with field personnel, and informed decision-making through the integration of field-level data, surveillance systems, and technological interventions. As directed by the NTCA, the 6th cycle of the All India Tiger Estimation Exercise is being undertaken in all 52 divisions of the State.

§ 7.1.3Eco-Tourism Activities

(A) Information of visitors to National Parks/Wildlife Sanctuaries

1. Among the visitors to the sanctuaries, 99.15% are Indians and 0.85% is foreigners. 2. The maximum number of foreigners visited Mysuru Wildlife Area during 2024-25 & 2025-26.

Table 7.12Information on visitors to National parks/Wildlife sanctuaries
YearNo. of Visitors
IndiansForeigners
2024-2518,11,05521,453
2025-26 (up to December-2025)12,96,1206,818
Survey, p. 260

3. This analysis reveals an imbalance in eco-tourism pressure across protected areas. While Bandipur, Nagarahole, and Kudremukh face high visitor pressure, several protected areas such as BRT, Bhadra, and Dandeli remain underutilised. To reduce stress on heavily visited sites, it is necessary to strengthen eco-tourism facilities in less visited protected areas, thereby ensuring balanced visitor distribution and supporting conservation objectives.

(B) Death of wild animals

Table 7.13 provides the details of death of wild animals (due to natural and unnatural causes) during 2024-25 and 2025-26 is given in Table 7.13.

Table 7.13Death of wild animals during 2024-25 and 2025-26 (up to December 2025)
Name of the animalNo. of deaths
2024-252025-26 (Up to Dec. 25)
Elephants10837
Tiger1013
Cheetha7512
Other animals17671
Total369133
Source: Office of the PCCF (Wildlife), Bengaluru. · Survey, p. 260

(C) The scale of ex-gratia payments for the damages caused by wild animals

  • As per Government order dated 29.04.2025, ex-gratia of Rs 20,00,000.00/-is paid to the legal heir of the deceased person in case of death caused due to wild animal attack and vide Govt. order dated 15.12.2022, in the case of permanent disability caused by wild animals, ex-gratia of Rs. 10,00,000/-is paid to the disabled person and in the case of partial disability, ex-gratia of Rs. 5,00,000/-is paid to the disabled person. “A monthly pension of Rs.4,000 for a period of 5 years is also given along with the exgratia to the family of a person killed by wild animals and for permanent disability caused by wild animals as per G.O. dated 15.12.2022.
  • Further a medical expenditure as per the Central Government Health Scheme (CGHS) rates vide G.O dated 15-09-2015.
  • The Government has doubled the amount of compensation being paid under the existing Govt order dated 19.09.2016 for crop damage by wild animal attack and compensation for new crops such as Mango, Sapota, Seebe, Jackfruit, Pomegranate, Custard apple and Mulberry are added in the order dated 18.01.2023.
  • In the case of the loss of domestic animals such as cows, ox and buffalo due to wild animal attack, an ex-gratia payment to the owners of such animals is enhanced from Rs. 10,000/-to Rs. 30,000/-as per the rates of the State Disaster Response Fund (SDRF) vide Govt. order Dated 20.04.2021.
  • Including this in the case of the loss of domestic animals such as Chicken, Horses, Donkeys etc. due to wild animal attack, an ex-gratia payment to the owners of such animals is paid as per the rates of the State Disaster Response Fund (SDRF) vide Govt. order Dated 16.02.2023.
  • During 2025-26 upto end of December 2025, due to attack by wildlife, 33 people were killed and total amount of Rs. 470.00 lakhs is paid. Details of Man-Animal conflict-Loss of Human Life and Compensation paid are given in the Table 7.14.
Table 7.14Man-Animal Conflict - Loss of Human Life & Compensation paid
Loss of Human Life & Ex-gratia paid2024-252025-26 (Up to Dec 25)
Number of persons killed in wild animal atat cks4433
Total Compensation paid (Rs. in lakhs)597.00470.00
Survey, p. 261

(D) Expenditure on wildlife development activities in National parks and Wild Life Sanctuaries

Among the schemes of the Forest Department concerning wildlife and national parks, Mitigation Measures to mitigate Man-Animal Conflict incurred an expenditure of 50%, under CSS “Project Tiger and Elephant” and 22% under CSS “Integrated Development of Wildlife Habitats for the year 2025-26, for the purpose of Rehabilitation of families from national parks and wildlife protected sanctuaries. For 2025–26, an allocation of Rs. 1,000.00 lakh has been provided for rehabilitation activities, of which Rs. 250.00 lakh has been earmarked for Kudremukha National Park and Rs. 750.00 lakh for B.R.T. Tiger Reserve. An amount of Rs.250.00 lakh has been released, and expenditure has been incurred accordingly.

(E) Railway Barricade to Prevent Man-Animal Conflict

Loss of human lives and crop damages are increasing. So far 428 km of Railway Barricade is constructed to prevent human-elephant conflict. Further 88.22 km. of Railway Barricade has been approved in the cabinet meeting held at Malai Mahadeshwara Hills of Chamarajanagara District. An allocation of Rs.6,000.00 lakhs has been allocated for implementation of the on-going works pertaining to the year 2025-26.

(F) Revenue Realized from Forestry

The State has realized revenue to the tune of Rs. 24,702.18 lakhs during 2025-26 (upto December 2025) from the marketing of forest products such as timber, firewood, sandalwood, bamboos, canes and other nontimber forest products. Details are given in the Table 7.15.

Table 7.15Revenue Realized from Forest Produce during 2025-26 (up to Dec. 2025)
Forest ProduceRevenue Realized (Rs. in lakh)
Timber10,555.65
Firewood and Charcoal3,318.61
Bamboos21.86
Receipts from Sandalwood338.40
Minor Forest Produce69.38
Other Sources of Revenue10,398.28
Total Revenue of the Department24,702.18
Forest Development Tax (FDT) Collections410.25
Source: APCCF(FRM) · Survey, p. 262

§ 7.1.4State Sector Schemes

Special Component Plan

Under welfare-oriented forestry interventions, LPG gas connections, solar lamps, and bee-hive boxes are provided to Scheduled Caste beneficiaries to improve living conditions and support income generation. In addition, avenue plantations along roads leading to Scheduled Caste colonies are undertaken. For the year 2025–26, a grant of Rs. 300.00 lakh has been allocated. By the end of December 2025, an expenditure of Rs. 184.92 lakh had been incurred, under which two free LPG cylinder refills were provided to 13,688 Scheduled Caste beneficiaries.

Tribal Sub-Plan

To reduce pressure on forest resources, LPG gas connections, LPG cylinder refills, solar water heaters, and solar lamps are provided to Scheduled Tribe beneficiaries. In addition, bee-hive boxes are distributed to support livelihood enhancement. The program also includes the maintenance of raised avenue plantations along roads leading to Scheduled Tribe habitations. For the year 2025-26, a grant of Rs.700.00 lakh has been allocated. By the end of December 2025, an expenditure of Rs. 416.40 lakh had been incurred, under which two free LPG cylinder refills were provided to 32,081 Scheduled Tribe beneficiaries.

Siri Chandana Vana

The area under sandalwood plantations and naturally occurring sandalwood trees is protected and maintained through measures such as chain-link fencing, watch and ward, soil working, cultural operations, and other protective interventions. For the year 2025-26, an allocation of Rs. 361.76 lakh has been provided. By the end of December 2025, an expenditure of Rs. 172.29 lakh had been incurred for the maintenance of 613 hectares of naturally growing sandalwood areas, recruitment and maintenance of 60 watchmen, maintenance of 12 dogs, upkeep of 1,484.04 hectares of old plantations, 83.80 km of inspection routes, and 165 km of fire lines.

Development of degraded forests

Under this scheme, degraded forest areas are rejuvenated through afforestation and soil and water conservation measures. Where adequate rootstock exists, such areas are protected from biotic pressure to facilitate natural regeneration. In other areas, plantations are raised based on local requirements for small timber, fuelwood, and fodder. For the year 2025-26, an allocation of Rs. 15,068.74 lakh has been provided. By the end of December 2025, an expenditure of Rs. 7,899.35 lakh had been incurred for raising plantations over 15,172 hectares, advance works in 5,989 hectares, and maintenance of plantations over 21,694 hectares.

Raising of Seedlings for Public Distribution

(a) Raising of Seedlings for Public Distribution Under this scheme, seedlings are being raised for distribution to the public, farmers, and organizations at subsidized rates to plant on their lands. For this purpose, seedlings of suitable local species as per demand are raised in 6” x 9” and 8” x 12” sized bags every year by the department. During the year 2025-26, a grant of Rs.1,196.43 lakh has been allocated for the implementation of the scheme for raising saplings for public distribution, in which Rs.433.80 lakh was spent on the maintenance of 44.605 lakh saplings and 34.72 lakh on raising of seedlings upto the end of December -2025. (b) “Krishi Aranya Protsaha Yojane (KAPY)” programme In the year 2025-26, a total of Rs.1000.00 lakh has been allocated for the disbursement of incentive funds to farmers under the Agricultural Forestry Incentive Scheme Program. The said grant will be allocated to the pending cases of payment of incentive funds to farmers in the years 2019-20 and 2020-21 and for payment of service amounts as per rules.out of this Rs.338.482 lakh has been spent upto end of December 2025.

Roadside Plantation Scheme

Karnataka has approximately 4,000 km of National Highways, 21,000 km of State Highways, and 38,000 km of District Roads covered under various avenue afforestation programmes. During 2025–26, a grant of Rs. 4,110.076 lakh has been allocated. By the end of December 2025, an expenditure of Rs. 1,931.924 lakh had been incurred for maintenance of plantations along 2,608.26 km of roads, maintenance of 47,500 seedlings, raising of plantations along 159 km, and advance works along 128 km.

Greening of Urban Areas

The scheme aims to mitigate urban pollution arising from high population density, vehicular traffic, and industrial activity through the planting of ornamental, shade-giving, and fruit-bearing trees. In addition, tree parks, woodlots, and avenue plantations are developed in urban areas to enhance environmental quality and urban aesthetics.During 2025–26, a grant of Rs. 1,136.57 lakh has been allocated. By the end of December 2025, an expenditure of Rs. 578.56 lakh had been incurred for the maintenance of plantations along 1,021.36 km and the raising of plantations along 80 km.

Hasiru Karnataka

With increased emphasis on social forestry, indigenous tree species are planted extensively on Government lands around hillocks, mangroves, and lakes. In this context, the “Green Karnataka” programme, announced in the Budget 2018–19, aims to promote tree planting at multiple levels—a tree for every household, a forest for every village, a mini forest for each taluk, and a forest for each district—with active participation of school and college students and environmental organisations. During 2025–26, an allocation of Rs. 245.39 lakh has been allocated under the Green Karnataka scheme. By the end of December 2025, an expenditure of Rs. 111.23 lakh had been incurred towards the maintenance of 1.82 lakh seedlings and the raising of 1.82 lakh seedlings.

Afforestation in Other Areas

During road widening works on State and National Highways, trees are felled, necessitating compensatory afforestation. For this purpose, the prescribed amounts are deposited by user agencies such as K-SHIP, KPTCL, KRDCL, and other utility agencies. Based on these deposits, funds are released by the Government for carrying out compensatory afforestation works. For the year 2025–26, a grant of Rs. 1,500.00 lakh has been allocated, of which Rs. 1,125.00 lakh has been released. By the end of December 2025, an expenditure of Rs. 702.81 lakh had been incurred towards advance works, raising of plantations, and maintenance activities, in accordance with prescribed norms and within the limits of funds deposited by the user agencies.

Tree Park Scheme

The scheme aims to improve the urban environment by establishing tree parks in district and taluk headquarters, on forest, non-forest, or other community lands in areas with higher population density, to enhance public access to green spaces. For the year 2025–26, an allocation of Rs. 2,000.00 lakh has been allocated, of which Rs. 1,000.00 lakh has been released. By the end of December 2025, an expenditure of Rs. 711.23 lakh had been incurred. Out of a total of 186 tree parks, 140 tree parks were maintained, and 18 tree parks were taken up for development works during the last three years. Further, 32 tree parks have been approved under the KFDF Flexi Fund for 2024–25 and 2025–26, comprising 24 new and 8 existing tree parks. Of these, creation of 8 new tree parks and development works in 5 existing tree parks are currently in progress.

Development and Preservation of Devarakadu (Daivivana)

Devarakadu forests are ecologically and culturally significant and are conserved as sacred groves to preserve their ecosystems in a pristine condition, allowing natural evolutionary processes to continue without anthropogenic disturbance. Under this scheme, Daivivanas (sacred groves) are proposed to be developed in each district. For the year 2025–26, an allocation of Rs.385.00 lakh has been provided, of which Rs.257.528 lakh has been released. By the end of December 2025, an expenditure of Rs.142.798 lakh had been incurred. Out of a total of 128 Devarakadus, 46 Devarakadus were maintained, and 8 new Devarakadus were taken up for development. Further, 8 Devarakadus have been approved under the KFDF Flexi Fund for 2024–25 and 2025–26, comprising 6 new and 2 existing Devarakadus. Of these, creation of 5 new Devarakadus and development works in 1 existing Devarakadu are currently in progress.

Medicinal Plants Conservation Areas & Medicinal Plants Development Areas (MPCA & MPDA)

Under this project, Medicinal Plant Protected Areas and Medicinal Plant Development Areas within forest regions have been identified, and maintenance and development works are undertaken to revitalise these areas. For the year 2025–26, an allocation of Rs. 130.00 lakh has been provided, of which Rs. 110.73 lakh has been released. By the end of December 2025, an expenditure of Rs. 61.59 lakh had been incurred. Against the physical targets of 100.60 hectares of plantation creation, 319.67 hectares of maintenance of existing plantations, and 94 hectares of advance works, progress includes 100.60 hectares of plantation creation, 319.67 hectares of plantation maintenance, and 50 hectares of advance works.

Forest Protection, Natural Re-generation and Cultural Operation

An allocation of Rs. 1,000.00 lakhs has been provided for forest fire prevention and protection measures, including engagement of fire watchers, creation of new fire lines, maintenance of existing fire lines, procurement of fire-fighting equipment, awareness programmes, and Soil and Moisture Conservation (SMC) works.Accordingly, Rs. 500.00 lakh has been released to unit offices. By the end of December 2025, an expenditure of Rs. 197.51 lakh had been incurred.

Land & Building

For the year 2025–26, a budget provision of Rs. 1,800.00 lakh has been made under Capital Expenditure on Forests and Wildlife for the construction of new office buildings and residential quarters. By the end of December 2025, an amount of Rs. 1,350.00 lakh had been released to various divisions, of which Rs.855.83 lakh had been utilised towards execution of works.

Building Maintenance

In the year 2025-26 a budget provision of Rs.1650.00 lakh has been provided. By the end of December 2025, an amount of Rs. 1,237.50 lakhs had been released to various divisions, of which Rs. 903.90 lakhs had been spent towards execution of maintenance works.

§ 7.1.5Centrally Sponsored Schemes

Project Tiger and Project Elephant

Project Tiger, launched in 1973, is implemented as a Centrally Sponsored Scheme (CSS) with funding shared between the Centre and the State in the ratio of 60:40 for non-recurring works and 50:50 for recurring works. In Karnataka, the scheme is implemented in Bandipur, Rajiv Gandhi (Nagarahole), Bhadra, BRT and Kali Tiger Reserves. Funds under the scheme are utilised for the protection, development, and conservation of tiger habitats, including fire line maintenance, habitat improvement works, infrastructure development, and other conservation measures. Provision is also made for payment of wages and special allowances to outsourced staff engaged in anti-poaching camps and to permanent staff working in tiger reserves. Karnataka has five Tiger Reserves. As per the All India Tiger Estimation 2022, the State has an estimated 563 tigers, ranking second in the country in terms of tiger population. In accordance with the directions of the National Tiger Conservation Authority (NTCA), the sixth cycle of the All India Tiger Estimation is currently being conducted across all 52 forest divisions in the State. Under the Project Elephant scheme, priority is accorded to the protection and conservation of elephant habitats, particularly in the Mysuru and Dandeli–Bhadra Elephant Reserves, along with implementation of measures to mitigate human–elephant conflict. The Central Government has merged Project Elephant with Project Tiger from 2023–24, with funding support in the ratio of 60:40 (Centre:State). The merged scheme supports elephant habitat conservation in National Parks and Wildlife Sanctuaries across regions including Kolar, Bannerghatta National Park, Ramanagara, Mysuru, Hunsur, Madikeri, Mangaluru, Belagavi, Chamarajanagar, Virajpet, Shivamogga, Chikkamagaluru, and Uttara Kannada. Major activities include construction and maintenance of elephant-proof trenches and solar fencing, establishment of Rapid Response Teams, anti-poaching camps, elephant driving squads, capture and relocation of problematic elephants, procurement of tranquilising equipment and medicines, staff and veterinary training, and awareness programmes. As per the 2023 Elephant Estimation (direct count method), Karnataka has an estimated 6,395 elephants, accounting for the highest elephant population in the country. The budget of Rs.7483.34 lakhs earmarked during 2025-26 of which central share 4175.17 lakhs and state share 3308.17 lakhs. The expenditure up to December 2025 was 3581.62 lakhs against the release 4129.42 lakhs.

Integrated Development of Wildlife Habitats (IDWH)

Under this project, funding is shared between the Government of India (60 per cent) and the State Government (40 per cent).Protection and conservation measures are being implemented across 5 National Parks, 37 Wildlife Sanctuaries, 19 Special Protected Areas, and 1 Community Reserve under the Wildlife Unit. The project focuses on the conservation of priority species and habitats, including the Great Indian Bustard landscape, Arabian Sea Humpback Whale, Olive Ridley Turtle, Vulture Breeding Centres, and Hornbill species. The scheme supports the establishment and operation of anti-poaching camps for protection of wildlife and protected areas, including payment of wages to outsourced personnel. It also covers habitat development activities such as construction and maintenance of water bodies, removal of invasive weeds, restoration of grasslands, and forest fire prevention and protection measures. The budget of Rs. 2776.00 lakhs earmarked during 2025-26 of which central share 1558.00 lakhs and state share 1218.00 lakhs. The expenditure up to December 2025 was 163.20 lakhs against the release 728.51 lakhs.

National Bamboo Mission

The National Bamboo Mission (NBM) is a Centrally Sponsored Scheme launched by the Ministry of Agriculture and Farmers Welfare, Government of India, with a 60:40 Centre–State funding pattern, effective from 2018– 19. The scheme aims to promote bamboo development in forest areas through Forest Development Agencies (FDAs) with the support of Joint Forest Management Committees (JFMCs), and in non-forest areas through Bamboo Development Agencies (BDAs). For the year 2025–26, a provision of Rs. 1,158.11 lakh has been made in the State Budget for implementation of the scheme. The Government of India has approved an Annual Action Plan of Rs. 2,316.20 lakh for the year under the 60:40 sharing pattern and has sanctioned Rs. 694.86 lakh as the first instalment. Accordingly, the State Government has released Rs. 1,158.11 lakh, including its share of Rs. 463.25 lakh, to the Department. The funds have been further released to the implementing officers through the SNA–SPARSH module for execution of works.

Conservation and Management of Mangroves

The scheme aims to prevent and mitigate coastal erosion through mangrove conservation and management. Activities include raising and maintenance of mangrove plantations and awareness and training programmes among coastal communities. The programme is implemented in the Honnavara, Mangaluru, Karwar, and Kundapur Divisions. For the year 2025–26, a budget provision of Rs. 50.00 lakh has been made.

Green India Mission

The Green India Mission (GIM) is a Centrally Sponsored Scheme implemented by the Ministry of Environment, Forest and Climate Change, Government of India, recognising the role of forest and tree cover in environmental improvement, climate change mitigation, food and water security, biodiversity conservation, and livelihood security of forest-dependent communities. The key objectives of the Mission are to increase and improve forest and tree cover over 10 million hectares, enhance ecosystem services including biodiversity, water conservation and carbon sequestration, and augment forest-based livelihoods of approximately three million people living in and around forest areas. The programme has been under implementation in Kalaburagi, Hassan, and Sirsi forest divisions since 2015– 16. For the year 2025–26, an allocation of Rs. 836.78 lakh has been provided in the State Budget, comprising a Central share of Rs. 502.07 lakh and a State share of Rs. 334.71 lakh. During the year, the Government of India sanctioned and released a first instalment of Rs. 95.00 lakh towards pending liabilities of 2024–25. Correspondingly, the State Government released Rs. 158.34 lakh, including its share of Rs. 63.34 lakh, to the Department. The funds have been further released to implementing officers through the SNA–SPARSH module for execution of works.

Forest Fire Prevention and Management (FPM) Scheme

Forest Fire Prevention and Management is a Centrally Sponsored Scheme with a 60:40 cost-sharing pattern between the Government of India and the State Government, aimed at the overall protection of forests from fire. The scheme supports activities such as creation and maintenance of fire lines, construction of water storage structures, procurement of modern fire-fighting equipment, forest fire prevention measures, and awareness campaigns. Up to the end of December 2025, an amount ofRs. 75.00 lakh has been released under the scheme, comprising a Central share of Rs. 45.00 lakh and a State share of Rs. 30.00 lakh. Of this, Rs. 72.956 lakh has been utilised.

Nagaravana Scheme

With increasing urbanisation, pollution levels in towns and cities have risen sharply, leading to health hazards and adverse impacts on daily life. To promote an eco-friendly environment, enhance green cover, and improve biodiversity, the Ministry of Environment, Forest and Climate Change, Government of India, has proposed the implementation of the Nagaravana Scheme in urban areas. During 2025–26, 10 new proposals have been submitted to the Government of India for approval, and approval is awaited.

§ 7.1.6Developmental Programs Afforestation

Afforestation works are undertaken periodically. By the end of December 2025, 287.09 lakh saplings were planted over an area of 62,526 hectares. Under agroforestry, 57.31 lakh saplings were distributed to farmers and the public for planting on private lands.

§ 7.1.7District sector schemes

Social Forestry Scheme

Under the Social Forestry Scheme during 2025-26, physical targets were set for raising plantations over 2,436.65 hectares and 439.31 km, maintenance of 10,389.39 hectares and 892.75 km of older plantations, 969.05 hectares and 54 km of advance works, raising 8.94 lakh saplings, maintenance of 9.55 lakh saplings, and 54 other activities. A financial outlay of Rs. 10,981.48 lakh was provided. By the end of December 2025, Rs. 8,256.11 lakh was released, of which Rs. 6,696.04 lakh was spent. Progress achieved includes raising plantations over 2,416.15 hectares and 435.81 km, maintenance of 10,389.39 hectares and 892.75 km of older plantations, completion of 215.00 hectares of advance works, raising 8.79 lakh saplings, maintenance of 9.5516 lakh saplings, and progress in 45 other activities.

Buildings

A financial target of Rs.1537.50 lakhs has been provided under the Buildings Scheme for the year 2025-26. The construction/repair work of buildings is being entrusted to PRED/KRIDL/Nirmithi Kendra by Zilla Panchayats towards the physical target of construction of 58 staff/officer quarters / office buildings and maintenance of 196 old buildings. By the end of December 2025, construction of 10 new buildings and maintenance of 47 old buildings are in progress, and out of the Rs. 637.13 lakhs released, Rs.107.17 lakhs have been spent.

Agroforestry under the Umbrella Scheme of RKVY

During 2023-24, new scheme under the Department of Agriculture, Agroforestry Component Rashtriya Krishi Vikas Yojane (RKVY Umbrella Scheme) was being implemented. An annual action plan of Rs. 22.67 (125%) crores will be sanctioned for the year 2025-26. Provision has been made for establishment/development of 15 new nurseries, maintenance of 18.23 lakh saplings in nurseries and raising of 37.22 lakh Quality Planting Material (QPM) saplings in nurseries and provision of 699 number of skill development and capacity building training programmes. By the end of December-2025, 15 new nurseries are established/developed, 17.754 lakh saplings are maintained in the nurseries and 20.18 lakh Quality Planting Material (QPM) saplings are raised and 68 number of skill development and capacity building training programs are undertaken. 1st instalment funds, Central Share of Rs.540.00 and State Share of Rs.360.00 Lakhs, totalling Rs.900.00 lakhs have been released, an expenditure of Rs.867.70 Lakhs was incurred by the end of the December-2025.

§ 7.1.8Revenue and Expenditure

The Forest Resource Management (FRM) wing of Karnataka is primarily responsible for the management of forests, covering both production activities and overall forest protection. Revenue is generated through the sale of forest produce such as timber, firewood, bamboo, sandalwood, and non-timber forest products, in addition to receipts from wildlife sanctuaries and other miscellaneous sources.Expenditure under the FRM wing comprises establishment costs, along with expenses incurred on afforestation, forest protection, and other departmental programmes. The detail of Revenue and Expenditure over the years is as shown in Table 7.16.

Table 7.16Revenue and Expenditure from Forest Department (Rs. in crores)
YearRevenueExpenditure
2017-18310.621,425.31
2018-19280.121,536.22
2019-20245.351,759.78
2020-21255.351,774.63
2021-22260.352,101.26
2022-23319.662,280.58
2023-24417.842,325.58
2024-25460.662,513.78
2025-26 (31.12.2025)252.561,396.77
2025-26(A)350.001521.30
* (A)Estimated / Expected income and expenses up to the end of the year. · Survey, p. 268

§ 7.1.9Externally Aided Project

Karnataka Stregthening Coastal Resilience and the Economy Project (KSHORE)

The objective of this project is to prevent plastic waste from entering the oceans/seas through rivers and to reduce plastic waste in the water bodies of the coastal districts of the state and reduce public health risks, restore coastal and marine ecosystems, and create sustainable livelihoods through a circular economy. A grant of Rs. 5000.00 lakh has been allocated for the implementation of the plan for the year 2025-26 and the first instalment of grant of Rs. 1250.00 lakh has been released.

§ 7.1.10Achievements and Challenges

  • To focus on eviction of forest land encroachments, mutation of forest lands in revenue records, implementation of the Forest Rights Act (FRA), boundary consolidation, biodiversity conservation, and mitigation of human–wildlife conflict.
  • During April-December 2025, 2,520 acres of forest land were reclaimed from encroachment in 463 cases. However, eviction remains pending in 1,22,201 cases, involving 2,15,393 acres, indicating the scale and complexity of the challenge. To strengthen monitoring, the Department has operationalized a Satellite Surveillance System (Forest Cover Change Alert System), which generates real-time alerts based on satellite imagery, enabling prompt field action and initiation of proceedings under Section 64(A) of the Karnataka Forest Act, 1963.
  • The State has a total forest area of 40,67,823 hectares, of which 30,27,799 hectares have been mutated in revenue records, achieving 74 percent progress. Mutation of the remaining 10,40,024 hectares is under various stages of completion.
  • According to the progress report provided by the social welfare department, implementation of the Forest Rights Act continues alongside conservation objectives. As of December 2025, 2.95 lakh applications were received, of which 16,700 title deeds were distributed. 16,043 applications remain under consideration, while 2.62 lakh applications were rejected due to various reasons.
  • To strengthen protection of forest boundaries, an allocation of Rs.1,800.00 lakh was made during 2025- 26 under Capital Outlay on Forestry and Wildlife. Against Rs.500.00 lakh released, an expenditure of Rs.423.21 lakh (as on 19.01.2026) was incurred for survey, demarcation and boundary consolidation, resulting in the construction of 6.24 km of compound wall, 13.08 km of barbed wire fencing, and 2.27 km of chain-link fencing.
  • The Department manages an extensive protected area network comprising 5 National Parks, 37 Wildlife Sanctuaries (including 5 Tiger Reserves), 19 Conservation Reserves and 1 Community Reserve, covering 11,399.49 sq. km, which constitutes 26.08% of the State’s forest area. Sustained conservation measures have yielded positive outcomes, with Karnataka ranking second in the country for tiger population (563 tigers, 2022 estimation) and first in elephant population (6,395 elephants, 2023 estimation).
  • To mitigate human-wildlife conflict, the State has created 428 km of railway barricades, 1,360.87 km of solar fencing, and 1,775.41 km of elephant-proof trenches. Institutional measures include the declaration of Hesarghatta Grassland as a Conservation Reserve and the launch of a Bandipur Elephant Task Force in 2024-25.
  • Afforestation and greening initiatives continued during 2025-26, with 2.87 crore saplings planted over 62,526 hectares, and 0.57 crore saplings distributed for planting on agricultural and private lands under agroforestry programmes. Urban environmental quality was enhanced through the State Sector Tree Park Scheme, providing green recreational spaces in towns and cities.
  • In the area of forest research and utilization, a revenue target of Rs.5.00 lakh was set for 2025-26, against which Rs.9.91 lakh was realized up to December 2025. Additionally, 87.91 tonnes of quality seeds were collected and distributed to research circles and field units. Research proposals were vetted through the Research Advisory Committee (RAC), while the ICT Center continued to expand digital platforms to improve transparency, accountability and process automation in forest governance.

Major IT systems including the below mentioned applications are developed and deployed: 1. e-Parihara: Online system for processing of ex-gratia sanctions to the aggrieved in case of man-wild animal conflict cases 2. e-Timber: Management of timber depot stocks in Government Timber depots across the State and e-auctioning of timber and other forest produce through online platform. 3. Sawmill Management System: Online system for renewal of Sawmill licenses across the State and management of wood consumption. 4. Forest Produce Tracking System: Monitoring of transit of mineral ore from forest leases, from source to sink. Issuance of online transit permits for transportation of ore. 5. e-Sasyakshetra: Online portal for management of seedling stock across forest nurseries. Provision for query on seedling availability and its subsequent disposal to public and departmental plantations. 6. e-Felling and Transit Permission System: Online system for according permission for obtaining permission to fell trees grown on private lands and subsequent approvals for removal of such felled material. 7. Compendium of HR Database: Exhaustive database of Forest frontline staff. Transfer and Counselling Management System for frontline staff. Application for “Aranya Keerti” system for processing applications for Chief Minister’s medal for meritorious service. 8. e-Evaluation: Online system for evaluating various departmental works implemented under various schemes. Valuating the success of implementation of schemes and models and their effectiveness. 9. Forest Geospatial Information System: Compendium of all forest notifications and cadastral level geospatial databaseof all forest lands. 10. Forest Fire Management and Analysis Portal: GIS, Remote sensing and MIS based system for dissemination of forest fire alerts and end to end system for capturing mitigation measures and with a forest fire forecasting model. 11. Forest Cover Change Alert System: AI, GIS, Remote Sensing and Machine learning based system to identify changes in forest cover over a period of approximately 3 weeks cycle. Repository on action taken and feedback on the same. 12. Aranya vihaara: Online application for booking of ecotourism activities in a user friendly, transparent online mechanism, was developed and deployed for booking of treks. 13. Garudakshi: Development and pilot deployment of Garudakshi for booking of forest offence cases through online mechanism.

§ 7.1.11Karnataka Biodiversity Board

The Karnataka Biodiversity Board was constituted on 01.08.2003 under Section 22 of the Biological Diversity Act, 2002, with the mandate of sustainable management of biological resources and equitable sharing of benefits arising from their use.To operationalise the Act, Biodiversity Management Committees (BMCs) have been constituted in all Gram, Taluk and Zilla Panchayats, as well as Urban Local Bodies across the State following the amendment to the Act in 2023, conservation of biodiversity at the local level is undertaken through these committees. The Board regularly conducts training programmes, workshops and awareness campaigns for communities, line department officials and frontline forest staff on biodiversity conservation, sustainable use of biological resources and implementation of the Act.

Objectives of the Board

1. The conservation of biological diversity. 2. The sustainable use of the components of biological diversity. 3. The fair and equitable sharing of the benefits arising out of the utilization of biological resources.

Table 7.17Achievements of the Board (Up to Dec 2025)
ProgrammesNumbers
1. E-PBR updation in BIOMIS Portal ( 1st phase)6,250
2. Awareness Training Programmes Karnataka Biodiversity Board conducted Awareness programme & workshop on Biodiversity conservation & Biological Diversity Act-2002 to BMC Members, line Department Officers, Local Communities, students etc.,21
Survey, p. 271
Table 7.18Ongoing Research Projects and Special Studies (Rs. In lakhs)
Title of the ProjectTotal BudgetPrincipal Investigators
Phenotypic and molecular characterization of superior tamarind (Tamarindus indica L) accession of Karnataka.17.00Dr. Suneetha C., Assistant Professor, Dept. of Horticulture, University of Agricultural Sciences, GKVK, Bengaluru.
Documentation of wild fruit species of Eastern Dry zone of Karnataka14.30Dr. S.R.Anand, Jr. Agrono mist, AICRNPC, UAS, GKVK, Bengaluru-65.
Survey, documentation and establishment of community linked germplasm for wild edible fruits of Kodagu District.8.3Dr. Satish B.N. Asst. Prof. College of Forestry, Ponnampet, Kodagu.
Monitoring stream fish population in relation to newly constructed weirs in central Western Ghats, India.15.00Dr. Vidyadhar Atkore, Scientist (Assistant Professor), Landscape Ecology Division, Salim Ali Centre for Ornithology and Natural History (SACON).
Survey, p. 271

Survey of Bio industries and utilization of bio resources

Table 7.19Amount collected from the companies
ApplicationsNo. of ApplicationsAmount Received (In Rs.)
Received Form-1 Applications and collected amount from the Companies6969,000/-
Amount collected towards Access Benefit Sharing(ABS)-33,98,289/-
Survey, p. 272

Special Programmes

a. Celebration of International Day for Biological Diversity - 2025

Karnataka Biodiversity Board has celebrated International Day for Biological Diversity 2025 at Mangalore University, Dakshina Kannada District on the theme “Harmony with Nature and Sustainable Development” in collaboration with Mangalore University. Students across the Karnataka state were attended. Many biodiversity related activities were conducted for the students.

b. Celebration of International Yoga Day

Karnataka Biodiversity Board has celebrated International Yoga Day on 21.06.2025 at BBMP high school, Malleshwaram, Bengaluru. Member Secretary & other staff of Karnataka Biodiversity Board, Teachers & students of BBMP school were participated in the Yoga day celebration.

Table 7.20Expenditure and Budget
Total Budget for the year 2025-26 (Rs. In lakhs)339.58
Budget released from the Government till December-2025 (Rs. In lakhs)226.24
Budget expenditure till December-2025 (Rs. In lakhs)156.72
Survey, p. 272

Challenges

1. Effectively implement the Biodiversity Act in collaboration with the Forest Department officials. 2. Identify more heritage sites. 3. Take legal action and collect ABS (Access and Benefit-Sharing) fee if any person/company is using biological resources for commercial purposes.

Vision

1. To effectively implement the Biological Diversity Act, 2002 at the local level by reconstituting and strengthening Biodiversity Management Committees in all local bodies, thereby ensuring the conservation of biodiversity. 2. To formulate the Karnataka Biological Diversity Rules in accordance with the Amendment made to the Biological Diversity Act, 2002 in the year 2023. 3. As per the guidelines of the National Biodiversity Authority, to carry out the digitization (e-PBR) of 6,554 People’s Biodiversity Registers at various levels across the State.

§ 7.1.12Coastal Regulation Zone Management

As per the Ministry of Environment, Forest and Climate Change (MoEF&CC) Notification S.O. 19(E) dated 06.01.2011, the coastal stretches up to 500 metres from the High Tide Line (HTL) on the landward side, areas up to 12 nautical miles seaward, and tidally influenced water bodies and their banks (up to 100 metres) are notified as Coastal Regulation Zone (CRZ). These areas are classified into four categories—CRZ-I to CRZ- IV—based on ecological sensitivity and land-use patterns, with specific regulatory norms and enforcement mechanisms. The Karnataka State Coastal Zone Management Authority (KSCZMA) has been constituted under the chairmanship of the Additional Chief Secretary, Department of Forest, Ecology and Environment, to ensure compliance with CRZ provisions. The revised Coastal Zone Management Plan (CZMP), prepared by the National Centre for Sustainable Coastal Management (NCSCM), Chennai, under the CRZ Notification, 2011, was approved by MoEF & CC on 07.08.2018, with further approval for revised CZMP maps accorded on 02.09.2022 under CRZ Notification, 2019. In compliance with the Hon’ble NGT directions (OA No. 04/2013 dated 11.04.2022), the Government of Karnataka engaged NCSCM to prepare a Shoreline Management Plan (SMP). Accordingly, the SMP for the 320 km Karnataka coastline was submitted by NCSCM on 07.11.2024.

§ 7.2Water Resources

The Water Resources Department (Major and Medium Irrigation) is one of the major Department in the Government of Karnataka. Irrigation is an important source of raising productivity in agricultural sector. Annual rainfall of the State is 1,355 mm. More than 73% of this rainfall is received from the South – West monsoon. Expansion of both the groundwater and surface water resources has helped to increase the cultivated area under irrigation in the state over time. Around 80% of fresh water is used for irrigation purpose and remaining for domestic, industry purposes.

§ 7.2.1River Basins of Karnataka and Allocation of Water

There are 7 River Basin Systems in Karnataka. The details are given in the Table 7.21.

Table 7.21Seven River Basin Systems in Karnataka Drainage Area
Survey, p. 273

§ 7.2.2Objective of Water Resources Department (WRD)

The objective of WRD is to harness Surface Water for Irrigation and providing water for Drinking/Industrial use and the ultimate goal of Department is to achieve targeted Ultimate Irrigation Potential of 42.08 Lakh Hectare through implementation of Major & Medium Irrigation Projects. Major category of implementation of Projects / activities in WRD include

  • Implantation of Irrigation Projects (Conventional Flow Irrigation, Lift Irrigation & Drip Irrigation) for providing irrigation facilities to the farmers of Command Areas.
  • Land Acquisition for Projects and providing Rehabilitation & Resettlement for Project Displaced families (PDF’s)
  • Modernization of Old Canal Networks including SCADA Based Automation for ensuring improvement of Water Use Efficiency.
  • Dam Rehabilitation & Improvement Projects (DRIP) under World Bank Assistance.
  • Command Area Development Works (CADA) involving construction of FIC’s, Land Leveling activities, stabilization of water logged areas etc.
  • Tank filling Schemes to provide Drinking water and for augmentation of Ground water recharge.
  • Operation and Maintenance of the Projects, etc.

§ 7.2.3Irrigation Potential Created through Major & Medium Irrigation Projects

The cultivable command area of the State is 1,40,598 Sq. Km. The Ultimate Irrigation Potential under Major and Medium Irrigation Projects has been estimated as 42.08 Lakh Hectares. As on December 2025, Irrigation Potential of 30.92 Lakh Hectare is achieved and balance of 11.16 Lakh Hectare is yet to be achieved. Irrigation Potential Created Cumulative Area details are given in the Table 7.22.

Table 7.22Irrigation Potential Created – Cumulative Area (In Lakh Ha.)
Source2020-212021-222022-232023-242024-252025-26 (Anticipated)
Major & Medium Irrigation29.8130.1530.4530.6630.6831.18
Minor irrigation0.330.230.180.180.140.096
Survey, p. 274

§ 7.2.4Year wise allocation/expenditure on Major & Medium Irrigation Projects

The State Government provides Budget to Water Resources Department under Capital Grant for Project Works apart from Budgetary support for Debt Servicing towards re-payment of Loans / borrowed funds by Nigam. There is also external funding for the Schemes in WRD by NABARD, under PMKSY-AIBP of GoI and World Bank. Expenditure on Major & Medium Irrigation Projects during 2024-25 was Rs.18,123.56 Crore. The Budgeted Expenditure for Financial Year 2025-26 is Rs.18826.93 Crore and the expenditure incurred to end of December 2025 is Rs.8980.00 Crore. The Table 7.23 highlights investment in irrigation projects.

Table 7.23Year wise Allocation and Expenditure of Irrigation Sector (Rs. In Crore)
YearAllocationExpenditure (*)Expenditure to Allocation ratio
2019-2016984.2517277.69100
2020-2118936.1319212.46100
2021-2219960.9819820.1999.29
2022-2323393.6523351.9199.82
2023-2416735.4918198.84100
2024-2516834.6618123.56100
2025-2618826.938980.00 (December 2025)47.70
(*) Expenditure Including Opening Balance. · Survey, p. 274

§ 7.2.5Establishments of Nigam in Water Resources Department

The Water Resources Department has established following four Nigam as under the Companies Act of 1956, for speedy implementation of irrigation projects and to enable the Government to borrow funds from external sources. a) Krishna Bhagya Jala Nigam Limited (KBJNL-1994) b) Karnataka Neeravari Nigam Limited (KNNL-1998) c) Cauvery Neeravari Nigam Limited (CNNL-2003) and d) Visvesvarayya Jala Nigam Limited (VJNL-2016)

§ 7.2.6Krishna Bhagya Jala Nigam (KBJNL)

The Krishna Bhagya Jala Nigam was established by the Govt. of Karnataka vide G.O. Dtd:06.05.1994 under Companies Act 1956 to accelerate the implementation of Upper Krishna Project and to enable the Govt. to borrow funds from external sources. This Nigam started functioning from 19.08.1994.

(A) Implementation of Upper Krishna Project

(a) Upper Krishna Project Stage – I &II

The Upper Krishna Project Stage I & II (UKP Stage-I&II) was envisaged for utilization of 173 TMC allocated under Krishna Water Dispute Tribunal Award–I (KWDT-I) to provide irrigation for 6.22 Lakh Hectare in Yadgir, Kalaburgi, Vijayapura, Bagalkot & Raichur Districts of Northern Karnataka. UKP Stage-I&II are completed in 2012-13 and Irrigation Potential of 6.20 Lakh Hectare has been created and completion report of the projects submitted to Central Water Commission (CWC).

(b) Upper Krishna Project Stage – III

The Krishna Water Disputes Tribunal-II (KWDT-II) has passed an award in December, 2010 and Further Report in 2013 allocating 173 TMC of water to the Karnataka State. Out of this, 130 TMC is the share of Upper Krishna Project Stage-III (UKP Stage-III). The KWDT-II Award is yet to be Gazetted by Govt. of India The utilization of allocated 130 TMC under UKP Stage-III involves raising the storage at Almatti Reservoir from RL:519.60 Mt to RL:524.256 Mt. (additional storage of 100 TMC) and it is contemplated to provide irrigation for 5.94 lakh Hectares of command area in Vijayapura, Bagalkot, Kalaburgi, Yadgir, Raichur, Koppal and Gadag districts of Northern Karnataka. The Govt. of Karnataka had accorded administrative approval to the Revised Estimated cost of UKP Stage-III for Rs.51,148.94 Crore (2014-15 price level), vide GO Dtd:09.10.2017. The cost of LAQ and R&R of UKP Stage- III is Rs.30,143.17 Crore. Under UKP Stage-III, the works under 9 Project Sub components, viz; Mulwad, Chimmalgi, Mallabad, Herkal, Koppal LIS, Indi & Rampur LIS Extension, Narayanpur Right Bank Canal Extension and Bhima Flank are in various stage of progress. The implementation of UKP Stage-III also involves Acquisition of 1,33,867 Acres of Land and Rehabilitation and Resettlement (R&R) of 20 Villages to be submerged under backwaters of Almatti Reservoir including R&R of part of Bagalkot Town. Land Acquisition and R&R is being implemented as per “Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013”. Details of progress of Land Acquisition and Rehabilitation and Resettlement (R&R) of 20 Villages (Rural), including R&R of part of Bagalkot Town in the backwaters of Almatti Reservoir of UKP Stage-III is given in the Table 7.24.

Table 7.24Details of Land Acquisition and R&R under UKP Stage-III
Sl. No.ParticularsTotal Area / No. (Target)Present Status
(1)Extent of Land Required for :YY Land Acquisition is to be done as per “Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013”. YY Awards Passed for : ) )Submergence – 2,732 Acres ) ) RC Formation & – 3,392 Acres BTDA ) )Canal Network – 23,671 Acres Total 29,795 Acres YY For Extent of 46,484 Acres proposals are under various stages of LAQ. YY Out of 25,660 Structures to be acquired, 2,907 Structures acquired.
(a)Submergence at Almatti FRL 519.60 Mt to 524.256 Mt75,563 Acres (188 Villages)
(b)Formation of RC Centres including in Bagalkot Town.6,467 Acres
(c)For Canal Network of 9 Project Sub-components.51,837 Acres
Total (1)1,33,867 Acres
(2)Structural Acquisition
(a)Rural – 20 No. of Villages23,330 Structures
(b)Urban – BTDA2,330 Structures
(3)No. of Project Displaced FamiliesRural : 1,17,669 & Urban : 3,584
(4)Financial ProgressTotal Cumulative Expenditure up to December 2025 : Rs.9185.00 Crore
Survey, p. 276

For the expeditious process of land acquisition under the Upper Krishna Project Stage-III a special cabinet meeting was held on 16.09.2025 and approval has been accorded vide G.O. Dtd:09.10.2025 for a) Acquisition of 75,563 acres of submerged land in the backwaters of the Almatti reservoir in a single phase from RL:519.60 m to RL:524.256 m. b) Consent Award rates for acquisition of submerged lands and canal lands required for the project as noted below: i. For Submergence Land Acquisition For dry land - Rs.30.00 Lakhs per Acre. For paddy land - Rs.40.00 Lakhs per Acre. ii. For Canals Land Acquisition For dry land - Rs.25.00 Lakhs per Acre. For wet land - Rs.30.00 Lakhs per Acre. c) To explore alternative Policy for Rehabilitation & Resettlement to offer compensation package instead of Rehabilitation & Resettlement by the Government. d) To constitute “Land Acquisition, Rehabilitation and Resettlement Authority” as per Section 51 of RFCTLARR Act, 2013. Cumulative expenditure incurred under UKP Stage-III up to end of December 2025 is Rs.21680.00 Crore.

(B) Other Projects under implementation under KBJNL

In addition to the Upper Krishna Project (UKP Stage-I, II & III), KBJNL is implementing other (1) Irrigation Projects, (2) Canal Modernisation, (3) Tank Filling Schemes, (4) Bridge-cum-Barrages & (5) Dam Rehabilitation & Improvement Projects (DRIP-II) of Almatti & Narayanpur Dams, in accordance with the Administrative approvals accorded by Government from time to time. The Financial & Physical progress details are given in the Table 7.25.

Table 7.25Financial & Physical progress details of Other Projects (Excluding UKP Stage-I, II & III)
Project DetailsNo. of ProjectsEstimated Cost (Rs. In Crore)Cumulative Expenditure upto December 2025 (Rs. In Crore)Contemplated irrigation Potential (In Hectare)Cumulative Potential created upto December 2025 (In Hectare)No. of completed Projects
Other Irrigation Projects (Excluding UKP Stage-I, II & III)1513,826.007,344.002,39,02999,3223
Canal Modernisation47,708.006,637.00002
Tank Filling Schemes131,832.901,667.80009
Bridge-Cum-Barrages5410.70398.30004
Dam Rehabilitation & Improvement projects (DRIP-II)9251.7015.20001
Total4624,029.3016,062.302,39,02999,32219
Survey, p. 277

(C) New Proposals approved under KBJNL during 2025-26

New Project proposals under KBJNL for which Administrative approvals accorded during 2025-26 (Till Dec. 2025) are given in the Table 7.26.

Table 7.26New project Proposals Approved During 2025-26 (till Dec. 2025)
New ProjectsNo of Projects approvedTotal Administrative Approved Amount (Rs. In Crore)
Irrigation oriented Projects21040.75
Tank Filling Scheme (19 Tanks)1272.00
TOTAL31312.75
Survey, p. 277

(D) Financial and Physical Progress under KBJNL during 2025-26

During 2025-26 FY Budget allocated to KBJNL is Rs.5,384.06 Crore. Expenditure incurred upto end of December 2025 is Rs.2,776.40 Crore.During current year it is planned for creation of 25,000 Hectare irrigation Potential. To end of December 2025 Irrigation Potential of 17,078 Hectare is achieved.

§ 7.2.7Karnataka Neeravari Nigam Limited (KNNL)

The Karnataka Neeravari Nigam Limited (KNNL) was established by Govt. of Karnataka on 26.11.1998 under Companies Act 1956 to accelerate the implementation of Krishna Basin Projects except Upper Krishna Project.

(A) Implementation of Projects under KNNL

KNNL has taken up numerous Irrigation, Tank filling, Modernization & Other Projects for implementation. Under KNNL 88 Tank Filling Schemes were taken for filling up of 2,909 Tanks with an estimated cost of Rs.14,423.38 Crore. So far 54 Schemes have been completed and 1,811 Tanks have been filled up. 24 Tank Filling Schemes are in progress. Cumulative expenditure incurred upto December 2025 is Rs.9,869.50 Crore. To mitigate suffering atchkut of about 1.10 Lakh Hectares in certain irrigation projects, 10 No. of stabilisation of Atchkut project works were taken up in KNNL with an estimated cost of Rs.1,369.50 Crore. So far 5 Atchkut stabilisation project works are completed. Cumulative expenditure incurred under these projects upto December 2025 is Rs.641.48 Crore. To increase the irrigation efficiency KNNL has taken up 10 Modernization Projects with an estimated cost of Rs.8,572.82 Crore. So far 6 Modernisation projects are physically completed. Cumulative expenditure incurred upto December 2025 is Rs.8,446.25 Crore. Apart from Tank filling, Modernization, & Atchkut stabilisation projects KNNL is implementing 87 No. of Irrigation oriented Projects with a plan to create irrigation potential of 17,85,953 Hectare. So far 52 irrigation projects have been completed. Since inception, upto December 2025 the cumulated potential created is 15,05,067 Hectare.

(B) New Proposals approved under KNNL during 2025-26

New Project proposals under KNNL for which Administrative approvals accorded during 2025-26 (till Dec. 2025) are given in the Table 7.27.

Table 7.27New project Proposals Approved During 2025-26 (till Dec. 2025)
New ProjectsNo of Projects ApprovedTotal Administrative Approved Amount (Rs. In Crore)
Irrigation oriented Project18.20
Tank Filling Schemes (378 Tanks)9966.70
Modernisation Projects6970.78
Bridge Cum Barrages2104.70
Stabilisation of Atchkut Projects5725.00
Other Projects4113.05
TOTAL272888.43
Survey, p. 278

(C) Financial and Physical Progress under KNNL during 2025-26

During 2025-26 FY Budget allocated to KNNL is Rs.4945.65 Crore. Expenditure incurred upto end of December 2025 is Rs.2,279.63 Crore. During current year it is planned for creation of 20,000 Hectare irrigation Potential. To end of December 2025 Irrigation Potential of 6,882 Hectare is achieved.

§ 7.2.8Visvesvaraya Jala Nigam Limited (VJNL)

Government of Karnataka vide its Order Dtd:20.08.2016 has accorded approval for creation of new corporation namely M/s Visvesvaraya Jala Nigam Limited, Bengaluru, formed under Companies Act 1956 as a wholly owned Govt. of Karnataka undertaking under Water Resources Department. Accordingly, VJNL has been registered under Companies Act on 20.10.2016. The Government has also transferred the projects namely Upper Bhadra Project, YettinaholeProject, Gayathri and Vani Vilasa Sagar Projects andits related offices along with officers/staff to VJNL.

(A) Implementation of Projects under VJNL

(a) Upper Bhadra Project

Upper Bhadra Project envisage providing irrigation for 2,25,515 Hectares (5,57,022 Acres) of land in droughtprone areas of Chitradurga, Chikkamagaluru, Davangere, and Tumkur districts of Central Karnataka through a Micro-Irrigation system and to fill 367 tanks in these districts to their 50% capacity. Govt. of Karnataka has accorded the administrative approval to the Re-revised DPR of the Bhadra Upper Project amounting to Rs. 21,473.67 Crore vide G.O. Dtd:16.12.2020. The Project in the first stage involve lifting of water from the Tunga River to the Bhadra Reservoir (Package 1) and is in progress and it is planned to complete the work by March 2026. Further, the works of lifting 29.90 TMC of water from Bhadra Reservoir to Ajjampura Tunnel (Package-2) and conveying water to Chitradurga Branch Canal (CBC) & Tumkur Branch Canal (TBC) through Ajjampura Tunnel (Package-3) are completed. Also water has been released to Vani Vilasa Sagar Reservoir since 2019–20. Under Stage-2 of the Project works of Tarikere Lift Scheme, Chitradurga Branch Canal, Tumkur Branch Canal works are in various stage of progress. Further, the Micro-irrigation works taken up under Chitradurga, Tumkur and Jagalur Branch and Tank filling works in Hosadurga, Holalkere, Jagaluru, Challakere, Molakalmuru and Pavagada taluks under Chitradurga Branch Canal, as well as in Sira, Hiriyuru & Chikkanayakanahalli taluks under Tumkur Branch Canal are also at different stages of progress. The Central Government in the Budget Speech of 2023-24, announced amount of Rs.5,300.00 Crore as Central Assistance to the Upper Bhadra Project. The Government of Karnataka has requested Govt. of India for early release of grants to UBP under the PMKSY-AIBP Scheme. Cumulative expenditure incurred up to end of December 2025 is Rs.11329.84 Crore.

(b) Yettinahole Drinking Water Project

To mitigate the problem of acute drinking water in drought prone areas especially in Chikkaballapur, Kolar Districts and other needy areas of Hassan, Chitradurga, Tumakuru, Bengaluru South, and Bengaluru Rural Districts, the Govt. of Karnataka has accorded administrative approval to re-revised DPR of Yettinahole Drinking Water Project amounting to Rs.23,251.66 Crore vide G.O. Dtd:10.01.2023 for diverting 24.01 TMC of water to cater the drinking water needs and filling up of 527 MI Tanks to its 50% capacity for ground water recharge. The project has been taken up in two stages. Under Stage-I of the project lift component and electrical works were completed and successfully commissioned and was inaugurated by the Hon’ble Chief Minister and Hon’ble Deputy Minister, Govt. of Karnataka on 06.09.2024. 79.50 Cumecs of water has been lifted to DC-4 and conveyed upto Km.32.50 of Gravity Canal. Further, 1.15 TMC of water had been temporarily let out to Vani Vilasa Sagara through Veda valley from Canal Escape at Km.32.50, during 2024-25 & 2.13 TMC during current water year 2025-26. Under Stage II of the project construction of 208.19 Km of Gravity Canal is completed & 28.25 Km length of Gravity Canal construction is in progress out of total 252.61 Km length. Construction of Madhugiri, T.G.Halli - Bengaluru South and Gouribidanur Feeder pipeline works which off-takes before balancing reservoir were taken up and so far 248.61 Km length of pipeline work is completed out of 254.97 Km and the remaining works are in various stages of progress. Construction of Kolar lift work, 36.96 km gravity pipe line(from Dc-5 to Y junction), Kolar and Srinivasapura Feeder pipeline works beyond balancing reservoir were taken up & out of 260.71 Km length 13.20 Km Pipeline work is completed and 9.10 Km is under progress. Balance length of 238.415 Km is yet to be taken up. As per the re-revised DPR action is being taken for the construction of Balancing Reservoir nearby Lakkenahalli village of Doddaballapura taluk in lieu of Bhairagondlu village of Koratagere Taluk duly obtaining the requisite approvals of competent authorities. Cumulative expenditure incurred up to end of December 2025 is Rs.18,114.85 Crore.

(c) Kadur Tank Filling Scheme

In the Kadur tank Filling Scheme it is proposed to utilize the allocated water of 1.45 TMC (Hebbehalla diversion) by diverting the water from Bhadra River and fill the existing 197 MI/ZP tanks upto 50% & of their capacity in Tarikere, Kadur & Chikkamagaluru taluks of Chikkamagaluru district, Arasikere taluk of Hassan district. This will help in increasing the water table thereby providing water facility to draught affected areas and livestock. The Government has accorded Administrative approval to the DPR of Kadur Tank Filling Scheme at an estimated cost of Rs.1281.80 crore vide G.O. Dtd:24.11.2020 for its implementation in 4 Stages. The Stage-I work is nearing completion. Stage-II works are in various stages of progress. Stage-III & IV of the project are yet to be taken up. Cumulative expenditure incurred up to end of December 2025 is Rs.294.26 Crore.

(d) Gayathri & Vani-Vilasa Sagar Projects

The Gayathri and Vani Vilasa Sagara Projects under VJNL were already completed.

(B) New Proposals approved under VJNL during 2025-26

New Project proposals under VJNL for which Administrative approvals accorded during 2025-26 (Till Dec. 2025) are given in the Table 7.28.

Table 7.28New project Proposals Approved During 2025-26 (till Dec. 2025)
New ProjectsNo. of Projects ApprovedTotal Administrative Approved Amount (Rs. In Crore)
Earthen Dam & Bridge Cum Barrages4283.82
Tank Filling Scheme1148.80
TOTAL5432.62
Survey, p. 280

(C) Financial and Physical Progress under VJNL during 2025-26

During 2025-26 FY Budget allocated to VJNL is Rs.3838.43 Crore. Expenditure incurred upto end of December 2025 is Rs.2,151.90 Crore. During current year it is planned for creation of 10,000 Hectare irrigation Potential.

§ 7.2.9Cauvery Neeravari Nigam Limited (CNNL)

The Cauvery Neeravari Nigam Limited (CNNL) was established by the Government of Karnataka on 03.06.2003 under Companies Act 1956 to accelerate the implementation of Cauvery Basin Projects in Karnataka. The Cauvery basin in Karnataka is 34,273 Sq.Kms which constitutes about 17.99% of the geographical area of 1,91,791 Sq.Km in Karnataka. Major Rivers flowing in this basin are Harangi (50 KM), Hemavathy (245 KM), Lakshmanatheertha (131 KM), Kabini (230 KM), Shimsha (221 KM), Suvarnvathi (88 KM), Arkavathy (161 KM) and the main river Cauvery (381 KM). The Cauvery Basin is spread across 11 districts.

(A) Implementation of Projects under CNNL

There are totally 29 potential oriented schemes taken up under the jurisdiction of CNNL, out of which 4 are Major Projects, 18 are Medium irrigation Projects and 7 allied LIS which are completed. Presently, the works under Yagachi Project and Kachenahalli Lift Irrigation Schemes are in progress.

(a) Yagachi Project

The project envisages the construction of a composite Dam across Yagachi River a tributary of Hemavathy near Chikkabyadagere village in Belur taluk of Hassan district. The planned utilisation under the project is 5.74 TMC to create an ultimate irrigation potential of 15,575 Hectare including Kyathanahalli LIS. The taluk benefitted by this project are Hassan, Belur and Alur of Hassan District. Kyathanahalli LIS is a part of Yagachi Project and is completed. Kamasamudra Branch Canal under Yagachi Project is under progress. The irrigation potential created under Yagachi project (including Kyathanahalli LIS) since inception to the end of December 2025 is 10,148 Ha.

(b) Kachenahally LIS

The project envisages to lift 0.73 TMC of water in 3 Stages from Hemavathy River near Kachenahally Village in Channarayapatna taluk of Hassan District. The ultimate potential to be created is 5,100 Hectare. 1st Stage works are completed. In The 2nd Stage Main Canal is completed and Distributary Network are under progress. Irrigation potential created under Kachenahally since inception to the end of December 2025 is 2,428 Ha.

(c) Modernisation of Anicut Canals

Under the jurisdiction of CNNL, 26 Anicut Canals/ Branch Canal modernization project works are taken up in phases with the total estimated cost of Rs.1,831.00 Crore. Among these, 23 works are completed and three works are under progress. The cumulative expenditure incurred up to end of November-2024 is Rs.1,790.47 Crore.

(d) Improvements of Canal System

Total 61 modernization works at a cost of Rs.4,924.34 Crore have been taken up in CNNL out of which 32 works are completed, 17 works are under progress and Tender in under process for 12 works. Cumulative expenditure incurred up to end of December 2025 is Rs.3077.02 Crore.

(e) Drinking Water Supply schemes (Tank Filling Schemes)

To alleviate the severe drinking water problems in the drought prone areas, 81 drinking water schemes at an estimated cost of Rs.4,730.00 Crore has been taken up under the jurisdiction of CNNL. It is proposed to fill 1,821 Tanks (81 Schemes) coming under Mysore, Mandya, Kodagu, Tumkur, Hassan & Bengaluru South, Chamarajanagara district. 47 Tank Filling Schemes are completed & commissioned and 615 No. of Tanks have been filled. 30 Tank Filling Schemes are under progress. Tender is under process for 4 Tank filling Schemes. Cumulative expenditure incurred up to end of December 2025 is Rs.3,983.00 Crore.

(B) New Proposals approved under CNNL during 2025-26

New Project proposals under CNNL for which Administrative approvals accorded during 2025-26 (Till Dec. 2025) are given in the Table 7.29.

Table 7.29New project Proposals Approved During 2025-26 (Till Dec. 2025)
New ProjectsNo. of Projects approvedTotal Project Cost (Rs. In Crore)
Bridge-Cum-Barrages251.50
Tank Filling Schemes6850.00
Modernisation Projects262163.75
Stabilisation of Atchkut Project149.50
Other Projects7423.80
TOTAL423538.55
Sonthi Lift Irrigation Scheme804.66
ERM of Indi Branch Canal Km 64 to 172 Network of UKP2666.70
ERM of Balance length under Malaprabha Canal System (Phase-III)3000.00
ERM of Ghataprabha Right Bank Canal & Chikkodi Branch Canal1596.98
ERMof Balance works of Tungabhadra Left Bank Canal System1444.42
Flood Control and Flood Management of Bennihalla River1610.00
TOTAL11,122.76
Survey, p. 282

(C) Financial and Physical Progress under CNNL during 2025-26

During 2025-26 FY Budget allocated to CNNL is Rs.3,201.00 Crore. Expenditure incurred upto end of December 2025 is Rs.1,709.80 Crore.

§ 7.2.10Inter-Linking of River Projects

The National Water Development Agency (NWDA) under the Ministry of Jal Shakti (MoJS) has proposed the implementation of diversion of 147.93 TMC surplus waters in Godavari basin to Cauvery through Godavari -Krishna - Pennar - Palar – Cauvery link (Godavari-Cauvery Link) project. The National Water Development Agency (NWDA) has proposed a total allocation of 34.40 TMC of water for Karnataka, including 15.90 TMC of water under the Godavari-Cauvery Link Project and 18.50 TMC of water under the Bedthi-Varada (Hirevaddati) Link Project. The state has given its consent to the NWDA for the preparation of the DPR for the Bedthi-Varada (Hirevaddati) Link Project. The State of Karnataka has urged before the NWDA and Ministry of Jal Shakti for considering the equitable allocation under Godavari-Cauvery Link Project on par with other beneficiary States viz., Telangana, Andhra Pradesh and Tamil Nadu.

Krishna (Almatti) – Pennar Link Project envisages transfer of surplus waters of 1558 MCM (55 TMC) from Almatti Reservoir that would be available due to the transfer of surplus water from Mahanadi & Godavari Rivers to Krishna, by way of successive substitution. Under Krishna (Almatti) Pennar Link water allocation of 25.40 TMC is indicated for the State of Karnataka for Irrigation & Domestic & Industrial uses.

§ 7.2.11Externally Aided Projects (EAP)

(A) Dam Rehabilitation & Improvement Project (DRIP)

(i) DRIP Phase-I

Karnataka State ranks 5th Place in the Country with 231 number of Dams. Karnataka State was included in DRIP-I as 5th State during 2014 at Total Cost of Rs.483.32 Crore for Rehabilitation & Improvement of 178 Dams with World Bank Loan Aid of Rs.386.66 Crore. Rehabilitation works of 22 Dams of the State were taken up with an allocation of Rs.541.00 Crore under World Bank Loan assisted Dam Rehabilitation & Improvement Project (DRIP). Out of 44 Packages of 22 Dams, the works of 42 Packages are completed. Remaining two package works (KRS Dam Package II & Instrumentation of 12 Dams) at cost of Rs.64.73 Crore is under progress.

(ii) DRIP Phase-II & Phase-III

Govt. of Karnataka has accorded approval for the Implementation of Dam Rehabilitation & Improvement Project (DRIP) Phase-II and Phase-III for 58 Dams (41 New Dams & Additional Works in 17 Dams already taken up under DRIP-I), to be implemented with Loan Assistance from the World Bank at a total cost of Rs.1,500.00 Crore (with Central Share of loan of Rs.1050.00 Crore-70% & State Share of Rs.450.00 Crore-30%) vide G.O. Dtd:06.07.2021. The duration of project is 10 years for its implementation in two phases. No Objection letter from CWC/World Bank has been received for Project Screening Templates (PSTs) of 10 Dams amounting to Rs.570.00 Crore (Gayathri, Tungabhadra, KRS, Narayanpur, Almatti, Taraka, Karanja, Kabini, Votehole & Hemavathy). The 17 package works (including 2 works of DRIP-I) of these 10 Dams amounting to Rs.371.34 Crore are awarded on tender basis and are under progress. For 9 package works tenders in process. Estimated proposals for 14 Dams including Yagachi, Suvarnavathi, Teetha, Thonnur, Hidkal, Muthurayanakere, Mangala, Vani Vilas Sagar, Nugu, Uduthorehalla, Gundal, Bhadra, Karanja and K. Honnamachanahalli have been submitted to the Central Water Commission and are under review. Karnataka State has established “Dam Safety Organisation” (DSO) in January 2022 in accordance with the Dam Safety Act-2021. Cumulative Financial Progress of Rs.250.28 Crore was achieved upto March 2025 and Re-imbursement of Rs.175.18 Crore (70 % of loan component) has been received from World Bank. During the Financial year 2025-26 the Budget allocation is Rs.100.00 crore and upto end of December, 2025 expenditure incurred is Rs.33.86 Crore. Thus, cumulative expenditure incurred for DRIP Phase–II upto December, 2025 is Rs.284.14 Crore. (B) Pradhan Mantri Krishi Sinchayi Yojana-Accelerated Irrigation Benefit Programme (PMKSY-AIBP) including CADWM The State of Karnataka submitted the PFR / DPRs of following Projects / Schemes of WRD for seeking Central Assistance under AIBP-PMKSY and FMBAP Schemes of GoI on 20.02.2025 to the DoWR, RD & GR and CWC, New Delhi. Above proposals of State of Karnataka are under consideration of Central Water Commission, Govt. of India. Ministry of Jal Shakti (MoJS) and Central Water Commission (CWC) of Govt. of India are requested to provide the necessary support for the proposed Irrigation Projects of State of Karnataka, duly extending Central assistance under PMKSY-AIBP Scheme of GOI, which will benefit the overall development of the irrigation sector in the State and ensure welfare of the famers in particular.

§ 7.2.12Major Achievements of Department during 2025-26

Financial and Physical Progress

A total grant of Rs.18,826.93 Crore has been provided to the Water Resources Department (Major and Medium Irrigation) for 2025-26. By the end of December 2025, Rs.8,980.00 Crore has been achieved and 59,181 Acres (23,960 Hectare) of irrigation potential has been created.

Replacement of all 33 Gates of Tungabhadra Reservoir

In the wake of the emergency situation in which Spillway Gate No.19 of the Tungabhadra Reservoir was washed away last year, the Tungabhadra Board has decided to replace all the 33 gates and has awarded the replacement of gates work on tender basis. Currently, out of the 33 spillway gates, the fabrication of 15 gates has been completed, the fabrication of 8 gates is in progress, and the installation work of Gate No.18 is in progress.

Mekedatu Project

Mekedatu Project envisages the construction of a Dam with a storage of 67 TMC of water across the main river Cauvery. The Project envisages (a) Utilization of 4.75 TMC (Consumptive Use) for drinking purposes including Bengaluru, (b) to regulate the monthly flows to Tamil Nadu at Biligundulu & (c) Generation of Power of 400 MW. The Hon’ble Supreme Court on 13.11.2025 dismissed all the cases filed by the State of Tamil Nadu against Karnataka in connection with the implementation of the state’s ambitious Mekedatu balancing reservoir project in the Cauvery Basin. To expedite the works related to Mekedatu project, a team of officials to work under the Director, KERS has been constituted. Further, a suitable office in Bengaluru South has also been ordered for its establishment for the working of said team. The State Government has urged the Ministry of Jal Shakti and Central Water Commission, GoI, to take up the appraisal of DPR of Mekedatu Project expeditiously and accord requisite approval to the project, since there is no impediment from the legal or any other point in view.

Karnataka Irrigation (Amendment) Rules, 2025

The Karnataka Irrigation (Amendment) Rules, 2025, has been officially notified in the Karnataka Gazette on 17.12.2025. The said Rules provide the specific, procedural details for implementing the broader, substantive framework for the provisions of the Act including Karnataka Irrigation (Amendment) Bill, 2024. State Water Policy – Meetings of High Level Water Policy Committee & Inter-Departmental State Water Resources Authority The State of Karnataka has brought in “State Water Policy, 2022” in August-2022. The policy was framed to address the new challenges and to make it more comprehensively Integrated Water Resource Management (IWRM) oriented in order to address the growing inter-sectoral demands of water and ensure water, food and economic security of the State. During 2025-26, Meeting of 3rd High Level Water Policy Committee under the Chairmanship of Chief Secretary to Govt. has been conducted on 16.04.2025. Further, 1st meeting of the ‘Inter-Departmental State Water Resources Authority’ under the Chairmanship of Hon’ble Deputy Chief Minister, and Hon’ble Minister for Water Resources, Govt. of Karnataka is held on 16.12.2025 at Suvarna Soudha, Belagavi.

Study on Pollution in Vrishabhavati and Arkavati Valleys

A Committee comprising Technical Experts and Departmental Officers, has been constituted vide Govt. Order Dtd:13.06.2025 to conduct an extensive study on the pollution of Vrishabhavati and Arkavati valleys and to suggest measures to prevent pollution for safe environment and ecology of the valleys.

Performance study of lift Irrigation Schemes

The Government has constituted a Committee vide Govt. Order Dtd:22.09.2025, comprising Public representatives and Retired Officers/ Technical Experts, to undertake studies on performance of the Lift Irrigation Schemes under the purview of State Water Resources Department and Minor Irrigation to give its suggestions / recommendations to enhance the performance of LI Schemes and their efficiency levels. Committee of Technical Experts to formulate plans to bring dry land in the state under irrigation A Committee of Technical Experts has been constituted to formulate the plans for effective utilization of water resources in the State, conduct comprehensive study for bringing dry land in the State under irrigation, monitor the natural resources and water requirements of the coastal area. Committee for finalizing Uniform Guidelines and Procedure for Preparation of Estimate, DPR & DTP (Standardization) A Committee has been constituted vide Govt. Order Dtd:12.06.2025 to prepare Uniform Technical Standards/ Guidelines for preparation of Estimates/DPRs/DTPs under the four Nigam of Water Resources Department. The suggestions / recommendations of the said Committee will facilitate way forward for effective implementation and management of projects being undertaken in the Water Resources Department.

Re-constitution of State Committee of Dam Safety (SCDS)

For proper surveillance, inspection, operation and maintenance of the specified dams and for prevention of dam failure related disaster and to provide for institutional mechanism to ensure their safe functioning, State Committee of Dam Safety has been re-constituted vide Govt. Order Dtd:22.08.2025.

§ 7.2.13Challenges

  • YDelay in land acquisition process: The progress of the projects is being hampered due to the delay caused in the land acquisition process and court litigations for seeking higher compensation by land owners.
  • Balance Cost of Projects : The total balance cost of projects being implemented under the department is more than Rs.1.00 lakh crore. However, the annual budget provided to the department is subject to limit, leading to slow progress of projects.
  • Delay in release of Central Assistance : Delay in release of Central Assistance from Govt. of India for the ongoing projects undertaken for implementation under Centrally Sponsored Schemes (CSS), has led to the slow progress of the projects.
  • Inter-State Water Disputes : Delay in adjudication of long pending cases in Tribunals/Hon’ble Supreme Court, related to Inter-State Water Disputes effecting the implementation of projects and utilizing allocated water to the State by the Tribunal Awards.
  • YClimate Change Impacts: Erratic rainfall and prolonged droughts impacting river flows and overall supply.
  • YIrrigation Inefficiency: Agriculture consumes most water, but productivity and efficiency need significant improvement for better water management.
  • YFinancial Sustainability: Nigams under WRD struggle with low cost recovery of water charges effecting insufficient revenue needed to maintain and expand infrastructure.

§ 7.2.14Way Forward

  • YIntegrated Water Management
  • )River Basin Planning: Comprehensive management of river valleys and groundwater.
  • )Stakeholder Participation: Involving farmers and users in water management policy.
  • Supply Augmentation & Treatment
  • )Treated Wastewater Reuse: Developing strong policies and infrastructure for using treated sewage in agriculture, industry, and non-potable urban uses.
  • )Tank Rejuvenation: Restoring tanks to act as sources for groundwater recharge.
  • Demand Management & Efficiency
  • )Efficient Irrigation: Promoting micro-irrigation (drip, sprinkler) and low-water-consumption crops in agriculture.
  • )Water Use Efficiency (WUE): Improving water productivity in all sectors.
  • YTechnological & Infrastructure Modernization
  • )Smart Water Grids: Leveraging technology for better water monitoring and management.
  • )Leakage Reduction: Modernizing irrigation distribution networks to reduce losses.
  • YPolicy & Governance
  • )Future Utility: Transforming water entities into future-ready utilities.
  • )Establishing State Water Commission: To scientifically manage water resources, advise on conservation, resolve inter-state water disputes, plan for future demand, and guide sustainable irrigation.

§ 7.2.15Minor Irrigation (Surface water)

Projects having atchkat up to 2,000 Ha. are classified as Minor Irrigation schemes. Projects having atchkat between 40 Ha to 2,000 Ha are under the jurisdiction of the Minor Irrigation Department. These include tanks, pickup, Bhandaras, Barrages and Lift Irrigation Schemes. These Minor Irrigation projects are widely spread all over the state. Presently, there are 12,591 minor irrigation projects in existence under the jurisdiction of this Department with a cultivable command area of 9,33,230 hectares. Minor Irrigation Department is having 3242 Irrigation tanks and 539 Percolation tanks. These tanks are being inspected twice in a year by the concerned Executive Engineers and Assistant Executive Engineer. The defects noticed during inspection will be recorded in the inspection report. Necessary repair works will be taken up from the grants made available during the year on priority. The minor irrigation scheme progress from the year 2020-21 to 2025-26 (Upto end of the December 2025) is provided in the Table 7.30.

Table 7.30Statement showing progress under Minor Irrigation (Surface water) Schemes
YearExpenditure (Rs. in Crore)Potential created (in Ha)
2020-212,782.7733,138.05
2021-222,746.0223,388.42
2022-233,239.3118403.72
2023-242155.6017723.61
2024-252862.6619314.89
2025-26 (Up to the end Of Dec 2025)1023.4513801.53
Survey, p. 287

§ 7.2.16State Schemes

Construction of new tanks: Under this head of account, new tanks are constructed and water is being stored during rainy season to supplement the deficit of water to the crops during non-rainy period or scarce rainfall period. Earthen bunds are constructed across the rivers, streams etc., and the water is being stored during rainy season which will be utilized for irrigation during deficit rainfall period. The Minor Irrigation Department is involved in proper distribution of stored water to the fields for irrigation by gravity flow. Construction of new tank is being carried out from state fund and also from NABARD loan assistance. Construction of the Percolation tanks are also being done under this head of account which are mainly intended to recharge the Ground Water table and help in raising the water level in the bore wells and open wells in the surrounding area which will be used for irrigation. Modernization of tank: Under this head of account, Department is taking up modernization of tanks under which the works such as strengthening of bund, repair of waste weirs, canals including lining of canals are being taken up. Construction of Barrage, Anicut, Etc. Under this head of account, Department is taking up the construction of barrages, bridge cum barrages, vented dams, salt water exclusion dams, anicut and pick-ups across rivers and streams to store water. Permission is being given to the farmers to lift water from these storage structures for irrigation by using their own pumps. As a result, there will be increase in ground water table in the surrounding area and water will be available in the open wells and bore wells. Thereby, farmers will get water for irrigation and also drinking purposes. Lift Irrigation Schemes: Under this head of account, Department is implementing the lift irrigation schemes to lift water from the rivers, streams, and other surface water sources to an elevated area and to provide irrigation to the farmer lands. Apart from this water is lifted and pumped to tanks under tank filling schemes. Also, the secondary treated water of Bengaluru City is pumped to tanks in Bengaluru Rural, Bengaluru urban, Bengaluru South, Kolar, Chikkaballapur and Tumakuru Districts under Tank filling Schemes. Special Component Plan : Under this head of account, department has taken up MI Schemes such as construction of new tanks, anecut / pickup bhandars, modernization of tanks and lift irrigation schemes etc., to create irrigation facility to the lands belonging to scheduled caste beneficiaries. An expenditure of Rs.103.36 Crore is incurred against the grant of Rs.350.00 Crore during 2025-26 (End of December 2025). Irrigation facility of 1696.02 Ha is created against the target of 3501.69 Ha. during 2025-26 (End of December 2025). These schemes are being handed over to respective beneficiaries after construction. Tribal Sub plan: Under this head of account, department has taken up MI schemes such as construction of new tanks, anecut,pickup bhandars, modernization of tanks and lift irrigation schemes etc., to create irrigation facility to the lands belonging to scheduled tribe beneficiaries. An expenditure of Rs.55.65 Crore is incurred against the grant of Rs.170.10 Crore during 2025-26 (End of December 2025). Irrigation facility of 1160.75 Ha is created against the target of 2226 Ha. 2025-26 (End of December 2025). These schemes are being handed over to respective beneficiaries after construction. Pashchima Vahini: Vented dams are constructed under “PaschimaVahini” project to collect and store water flowing in west-flowing rivers of coastal districts. A total of 280 works have been approved under the scheme, with an estimated cost of Rs.104.36 crore. An expenditure of Rs.66.67 crore is incurred against the grant of Rs.100 crore during 2025-26 (End of December 2025). Land Acquisition/charges & settlement of claims: Under this head of account, an expenditure of Rs.81.55 crore is incurred against the grant of 100.00 crore during 2025-26 (End of December 2025). Mainly this grant has been utilized to make payments to land acquisition cases involving enhancement of land values including the interest as per the court orders. Accelerated Irrigation Benefit Programme (AIBP) Major works: Government of India is giving approval for taking up of the new minor irrigation works involving the creation of fresh irrigation facility since 2009-10, in the Drought Prone Area Development Programme (DPAP) taluks under Accelerated Irrigation Benefit Programme (AIBP). Minor irrigation department is implementing 1,273 minor irrigation works with an estimated cost of Rs.955.08 crore after obtaining approval to these works in 10 batches since 2009-10. So far 1,157 works are completed and the new irrigation facility is created in 10,255.00 Ha. State Schemes Flood Control Works: The Department is implementing River bank protection works to prevent damages due to floods. The river banks are being protected by the construction of retaining wall to the river banks for the prevention of loss of lives and properties due to the erosion of the banks during the floods in rivers and streams. Karnataka Tank Conservation and Development Authority: The Authority started functioning from December 2017. The functions of Karnataka Tank Conservation and Development Authority include Conservation of Lakes/Tanks, rejuvenation, Ground Water Development, Environmental Protection, Wet Land Development, Water Management, Agriculture and Horticulture Development, Development of Agriculture based Industries etc., either directly or through Departments/Agencies.

§ 7.2.17Atal Bhujal Yojana

Atal Bhujal Yojana is a community-led sustainable groundwater management program being implemented in 1,199 water stressed Gram Panchayats across 41 Taluks of 14 Districts. The central sector scheme (The Government of India (GoI) and World Bank) is being implemented from 2020-21 to 2025-26. The Financial Progress of the Atal Bhujal Yojana is given in the Table 7.31.

Table 7.31Financial Progress of the Atal Bhujal Yojana (Rs.in Crore)
ComponentAllocationReleasesExpenditure
Institutional Strengthening and Capacity Building - IS & CB194.51137.54129.95
Incentive Component1034.22786.81720.19
Survey, p. 289

§ 7.2.18Way Forward

Promote sustainable agri-practices by creating awareness of the existing schemes around subsidizing microirrigation (Per Drop More Crop, Micro-Irrigation Fund), preserving soil health (Paramparagat Krishi Vikas Yojana, Soil Health Card) and host of initiatives under National Mission for Sustainable Agriculture. Prioritize districts like Belagavi, Raichur, Vijayapura, Bagalkot which have high potential for micro irrigation. A holistic approach including precision farming, protective cultivation, automation in irrigation, fertigation, use of treated waste water for irrigation and collective farming are some of the methods suggested to address major concern of water scarcity in the state. A marked shift from traditional method of irrigation to innovative micro irrigation system is the solution to conserve water and thus increase the availability of water for various other purposes. Adoption of poly houses, net houses, green houses will not only save water, energy and labour costs but also will increase crop productivity and quality of the produce. Converting more and more areas of canal based and tank based flood irrigated land into drip irrigation leading to substantial reduction in the usage of fresh water. These key measures are expected reduce water scarcity to a large extent in the state.

Neeriddare Nale

“Neeriddare Nale” (meaning “Water is Future”) is a Karnataka government initiative launched in October 2025 to conserve groundwater, boost water table levels, and raise awareness in overexploited areas, involving AI for monitoring, lake rejuvenation, and community participation, with actor Vasishta Simha as its brand ambassador.

Key Aspects of the Initiative

  • YGoal: Develop groundwater, conserve traditional water sources, and manage water sustainably.
  • YScope: Implemented in 525 Gram Panchayats across 27 taluks in 15 critical districts.
  • YTechnology: Plans to use Artificial Intelligence (AI) to monitor groundwater in thousands of lakes.
  • YActivities: Includes lake rejuvenation, which has already shown improved water tables and increased agricultural output.
  • YBrand Ambassador: Actor Vasishta Simha appointed to connect with the youth on water conservation.

Why it Matters

  • Addresses severe water scarcity and groundwater depletion in many parts of Karnataka.
  • Focuses on community involvement and sustainable practices for long-term water security.

§ 7.3Geology and Mining Sector

Introduction

The Department of Mines and Geology is one of the leading scientific and technical department of the State with a long history of 131 years. Major functional activities of the department include mineral exploration, assessment of mineral wealth, quality analysis, sanctioning of mining leases and quarrying leases through the minerals administration which also include collection of royalty and regulation of unauthorized mining activities. The contribution of the department is immense in sustainable development of the State by promoting environment friendly and scientific mining.

§ 7.3.1Revenue collection and operational expenditure

The annual target of revenue collection for the year 2025-26 is Rs.9000.00 crores. The revenue collection of Rs.6104.86 crores against the target December-2025 of Rs.6110.81 crores. The details of revenue collections from 2021-22 to 2025-26 (up to December-2025) is provided in the Table 7.32.

Table 7.32Details of revenue target and achievement in the last five years (Rs. in crore)
YearAnnual TargetAchievementMajor MineralMinor Mineral
2021-224357.006308.314243.582064.73
2022-236500.005945.773841.552104.22
2023-249000.007321.595317.612003.98
2024-259000.007698.975852.371846.60
2025-26 (up to December 25)9000.00 (Rs.6110.81 crores target up to Dec-2025)6104.864809.341295.52
Royalty collection in the table is as per reconciled figures. Source: Demand-Collection-Balance Section, Department of Mines & Geology. · Survey, p. 290

Further, the compounded annual growth rate of 14.61% has been achieved in the royalty collection over the last five years. Compared to the last 5 years, revenue collection of the Department of Mines & Geology with the plan and non-plan expenditure, the ratio is just 0.01. The detailed information is provided in the Table 7.33 and Figure 7.5.

Table 7.33Details of the royalty collection, expenditure & their ratio over the past five years (Rs. in lakhs)
YearRoyaltyExpenditureRoyalty & expenditure ratio
2020-2021389344.006905.560.02
2021-2022630831.006618.250.01
2022-2023594577.006541.140.01
2023-2024732159.007399.460.01
2024-2025769897.498008.530.01
Survey, p. 290
Figure 7.5Details of the royalty collection and expenditure over the past five years
  • Royalty
  • Expenditure
Rs in Lakhs
01,00,0002,00,0003,00,0004,00,0005,00,0006,00,0007,00,0008,00,0009,00,000
2020-20212021-20222022-20232023-20242024-2025

The figure prints no values. The values here are from Table 7.33 of the Survey, which the figure draws, and they agree with the bar heights. Expenditure is about one per cent of royalty, so its bars are barely visible. The values are those of Table 7.33 on the same page.

The numbers
RoyaltyExpenditure
2020-20213,89,344.006,905.56
2021-20226,30,831.006,618.25
2022-20235,94,577.006,541.14
2023-20247,32,159.007,399.46
2024-20257,69,897.498,008.53

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 291

§ 7.3.2Major Achievements of the Department

  • To supervise all mineral transportation vehicles movement from the centralized tracking platform of Department and to regulate illegal mineral transportation “One State One GPS” application has been introduced on 08.03.2023. All major and minor minerals transporting vehicles fitted with AIS-140 certified GPS devices and to integrate with “One State One GPS” centralized system and with regard to monitoring the movement of all mineral-transporting vehicles registered under the said centralized system. Till now, 69,000 vehicles have been registered in One State One GPS and also Rs.10.00 crores fine has been collected from vehicles violating the rules.
  • In the current financial year, a total of 10,264 mineral transportation vehicles have been registered under the said centralized system, and a total fine of Rs.2.98 crores has been collected from various GPS violation cases.
  • In order to computerize the mineral administration of the department a new application called ILMS (Integrated Lease Management System) has been developed by the Centre for Smart Governance with new technology and has been successfully implemented on 12.12.2024. In continuation of this, in 2nd phase of the new ILMS software development, design work and new sub-modules such as mineral sample collection and analysis, EODBS, e-market reservation, DCB and auditing, Integrated CCTV surveillance, Fine and fee collection system, integration with RTO, GST, PAN, Conveyor, IBM, PGS & auction platform, role wise real time dashboard development is under progress.
  • The Karnataka Minor Minerals Rules, 1994 have been amended to make it mandatory to generate e-way bill through the Goods and Services Tax portal for the transportation of minor minerals, accordingly notification has been made vide No.CI/MMN/137/2025, dated: 20.09.2025. It is expected to generate additional revenue by preventing royalty and GST evasion.
  • Karnataka State Remote Sensing Application Center has been awarded to carry out Drone/DGPS survey in the quarry leased areas in all the districts of the state to freeze the existing ground level (Reduced Level). At present in all the districts Drone/DGPS survey is completed and the data processing work is under progress.
  • Karnataka Minor Mineral Concession (Amendment) Rules-2023 and 2024 are being implemented to provide sand to the public and government works at fixed rates by transparently allotting sand blocks through reverse auction. So far, a total of 338 sand blocks have been identified in 15 districts of the state and notifications have been issued to dispose of 270 blocks through tender process and to reserve 42 blocks for government works. Further, tenders have been called for disposal of 248 blocks through auction, the tender process of 172 blocks has been completed and 76 blocks is in progress. Out of the blocks for which the tender process has been completed, provisional acceptance letters have been issued to the successful bidders of 128 blocks and letters of intent have been issued for 106 blocks.
  • Under National Mineral Exploration and Development Trust (NMEDT) approved projects ̧mineral exploration wing of the Department has taken G3 stage of mineral exploration for gold in an area of 25.10 sq. km in Sirigere village of Siraguppa taluk of Ballari district and work is under progress.
  • Under state budget, G3 stage of mineral exploration for TVM in an area of 0.09 Sq.Km in Ubrani Village of Channagiri Taluk ̧ Davanagere District and G3 stage of mineral exploration for Iron Ore in an area of 1.00 Sq.Km in D.B Kere Village of Hosadurga Taluk ̧ Chitradurga District, exploration works are under progress.

§ 7.3.3Major Mineral Administration

Since the Inception of Mines and Minerals (Development and Regulation) Amendment Act, 2015 by Central Government, grant of mining leases through first come first serve basis had been replaced with transparent e-auction process, leading to an increased flow of revenue generation to the state exchequer. Further, a comparison between the revenue collection from the auctioned Iron ore mining leases and non-auctioned mining leases shown in the Table 7.34 illustrates the economic impact after adopting new regime of granting the mining leases through e-auction.

Table 7.34Comparative analysis of royalty collection from mining leases granted through
Type of grant of mining lease and their number and present status2022-232023-242024-252025-26 (upto December)
Non auction: Out of 212 mines 100 are working mines2085.972467.662787.791935.58
Auction: Out of 21 mines 16 are working mines181.71250.12383.06240.71
** Percentage of value of Mineral Dispatched paid to government (auction premium)1573.872599.832681.522633.05
Total3841.555317.615852.374809.34
** Percentage of value of mineral dispatched (auction premium) is equal to or above the reserve price and the successful bidder shall pay to the State Government, an amount equal to the product of percentage so quoted and value of mineral dispatched. · Survey, p. 292

In the state, 88 iron ore & manganese mining leases have been sanctioned over an extent of 7552.93 hectares, 118 limestone mining leases have been sanctioned over an extent of 15023.85 hectares and 27 other major minerals mining leases have been sanctioned over an extent of 2318.98 hectares.A total of 233 mining leases have been granted.

§ 7.3.4Auction of Mineral blocks

Including the cancelled ‘C’ category mining leases as per order of Hon’ble Supreme Court, Expired mining leases and mining blocks received from Geological Survey of India (GSI) ̧ Totally 64 mineral blocks have been successfully auctioned from 2016-17 to 2025-26 (upto December 2025), among these 17 ‘C’ category iron ore mines, 08 expired iron ore mines, 14 fresh Iron Ore blocks, 07 Gold blocks, 10 limestone blocks and 3 Bauxite blocks. The Central Government’s Ministry of Mines has further auctioned 04 Critical Mineral blocks and 01 Exploration License block through auction. Out of these blocks, mining lease deeds has been executed for 20 blocks and Composite License deed has been executed for 5 blocks. For remaining 39 cases bidders are yet to comply with the statutory requirements for execution of lease deed. Further, action has been initiated to auction 10 blocks in the year 2025-26. During the year 2024-25, out of 18 blocks put for auction for both composite license and mining lease, 15 blocks were successfully auctioned and 03 blocks annulled. The details of the successfully auctioned blocks till this period are shown in Table 7.35.

Table 7.35Details of the successfully auctioned blocks up to December 2025
Sl.No.NIT DateBlock NameExtent (in Hectares)MineralResources (MMT)Auction ForHighest BidderFinal Price ofef r
104.10.2024Chamnur Limestone Block476.876Limestone555.696MLACC Limited36.00%
204.10.2024Udagi Limestone Block646.34Limestone459.41MLM/s UltraTech Cement Limited46.40%
308.10.2024Sivalinganahalli Gold Block2348GoldNillCLAnnulled
408.10.2024Salagudda Gold Block2202GoldNillCLM/s Kundan Gold Mines Private Limited8.40%
508.10.2024Jainapura Gold Block1945GoldNillCLAnnulled
608.10.2024Shankarikoppa Gold Block1585GoldNillCLM/s Kundan Gold Mines Private Limited20.00%
708.10.2024Navge Bauxite (Aluminous laterite) Block60Bauxite0.083CLShri Mahakaal Infrastructure151.00%
808.10.2024Hunasihuli Block200Copper1.34CLAnnulled
903.10.2024Jambunatha Iron Ore Mine164.98Iron Ore21.35MLKirloskar Ferrous Industries Limited148.10%
1003.10.2024Karadikolla Iron Ore Mine133.8Iron Ore23.24MLMSPL Limited156.00%
1103.10.2024Kariganur Iron Ore Mine179.81Iron Ore23.88MLRBSSN Das166.50%
1203.10.2024Janthakal Iron Ore Mine71.16Iron Ore12.51MLVedanta Limited183.50%
1303.10.2024Rajapura South Iron Ore Block18.74Iron Ore3.116MLShubha Prashanth Narayan130.00%
1403.10.2024Rajapura North Iron Ore Block34.97Iron Ore8.539MLMSPL Limited167.10%
1503.10.2024Vibhutigudda Iron Ore Mine119.71Iron Ore31.04MLMSPL Limited163.20%
1603.10.2024Kumaraswamy Iron Ore Block88Iron Ore25.98MLRBSSN Das200.00%
1703.10.2024Janehar Iron Ore Mine54.51Iron Ore8.35MLPrakash Sponge & Power Pvt Ltd170.30%
1807.10.2024Shanthipriya Iron Ore Mine80.43Iron Ore3.65MLBrundavana Constructions Pvt Ltd161.80%
Survey, p. 293

§ 7.3.5National Mineral Exploration and Development Trust

As per the section 9(C) of Mines and Minerals (Development and Regulation) Amendment Act, 2015, all the major mineral lease holders are required to pay 2% of the royalty to the National Mineral Exploration and Development Trust (NMEDT) constituted by the Government of India. This fund is managed by the Central Government and by utilizing these funds upon taking the concurrence of respective State DMG’s and within the approval of NMEDT the agencies notified by the Central Government like GSI, MECL and KIOCL etc., and also through the concerned State Mines and Geology Departments, exploration activities of major minerals is being carried out. During the period 2015-16 to 2025-26 (up to December 2025) an amount of Rs.5115.58 lakhs has been collected and transferred to the NMEDT account by the State Government. The details are given in the Table 7.36.

Table 7.36Details of amount collected for NMEDT fund from 2015-16 to 2025-26 (Up to December 2025) (Rs. in Lakhs)
YearRoyalty collectedNMEDT contribution due (2% of royalty)NMEDT contribution collectedAmount transferred to NMEDT account
2015-162088.6041.7741.7741.77
2016-1777607.811552.161632.691632.69
2017-18179890.153597.803724.563724.56
2018-19 (Month wise breakup till closure of SBI A/c)75643.711512.871613.851613.85
Total335230.276704.607012.877012.87
NMEDT collection and transfer as per Accountant General’s statement
2018-19 (Month wise breakup afet r adoption of new accounting procedure)110198.452203.972782.752782.75
2019-20137922.072758.442893.732893.73
2020-21151705.083034.103250.953250.95
2021-22255339.075106.785279.395279.39
2022-23192976.003859.524211.044211.04
2023-24269696.365393.935288.095288.09
2024-25275086.845501.745927.995927.99
2025-26 (December -2025**)203456.354826.275115.583707.94
Total1596380.2332684.7534749.5233341.88
Grand Total1931610.5039389.3541762.3940354.75
** 2025-26 (up to December-2025) information is non- reconciled amount as per the AG office. · Survey, p. 294

§ 7.3.6Mineral Exploration programmes taken in the State under NMEDT fund

Mineral exploration is being carried out under the NMEDT fund through Exploration Agencies notified by the Central Government, Notified Private Exploration Agencies and State DMG by identifying mineral potential blocks in various districts of the state. From the year 2016-17 to 2025-26 (till December-25), NMEDT has approved 38 mineral exploration projects out of these, 28 projects have been completed and 10 projects are in progress. In the current year 2025-26, NMEDT has approved 01 exploration project with an estimated cost of Rs.2.25 crores taken by Notified Private Exploration agency (M/S Ecomen Laboratories Pvt. Ltd) and same is in under progress.

Table 7.37Details of mineral exploration programs completed and in progress the State under NMEDT fund
Sl. No.Name of the Block/ Exploration levelExtent (Sq.km)DistrictMineralExploration AgencyTotal estimated cost (Rs. in lakhs)
Mineral exploration projects completed during 2025-26 (up to December 2025)
1Nagvanda Block G4 level177.63HaveriGold and associated MineralsKIOCL147.63
2Kudrekonda-Pallavanahalli2.74DavanagereGoldMECL244.68
3Kalasapura G4 level129.00ChikkamagaluruGold and CopperMECL152.40
4Malkhed Block - 1 North & South and Malkhed - 2 North & South18.01KalaburagiLimestoneMECL121.84
5Mundalli Block G3 level4.75Utat rakannadaAluminous Laterite and Associated Critical ElementsM/s Geo Marine Soloution Pvt.Ltd90.921
Mineral exploration projects under progress for the year 2025-26
1Rampura-Gollarahatti G3 level2.00HassanNi, Co, PGE, REE/Rare MetalsM/s GeoExpOre Pvt Ltd82.87
2Kakol Block G3 level29.06HaveriGoldMECL448.27
3Sirigere Gold Block G3 level25.10BallariGoldDMG345.19
4Yadiyur G4 level50.00MandyaGold &BasemetalKIOCL129.16
5Ramgad Block G3 level1.08BallariIron and ManganeseM/s Ecomen164.36
6Killarahatti Block G4 level14.00Koppal& RaichurGold and associatedM/s Mining Tech Consultancy Services Ltd374.34
7Chinnikatti G3 level7.00HaveriGoldM/s Mining Tech Consultancy Services Ltd454.86
8Govindagadde & Sedigudda Block G3 level1.20UdupiAluminous Laterite & Associated Critical MineralsCritical Mineral Trackers453.26
9Nitat dagi G3 level4.40Utat ra KannadaBauxitePRB Infraprojects Pvt ltd.,140.64
10Byndoor G2 level2.00UdupiBauxite and aluminous lateriteM/s Ecomen225.47
Survey, p. 295

§ 7.3.7Exploration programs carried out by the Department

The department is carrying out mineral exploration in 08 blocks for various minerals commodities, the details are given in the Table 7.38.

Table 7.38Details of various minerals commodities
Name of the blockExtent (Sq.km)MineralRemarks
Yagavakote Molybdenum & Copper block, Chintamani Taluk, Chikkaballapura123.00Molybdenum & CopperEncouraging results found in Preliminary field studies, hence further investigation will be proposed under NMEDT Fund
Gonavatla REE block, Lingasuguru Taluk, Raichur3.25REEEncouraging results found in Preliminary field studies, hence further investigation will be proposed under state Fund.
Amate Bauxite block (East), Khanapura Taluk, Belagavi0.61BauxitePitting and trenching work has been completed, chemical analysis work is under progress
D B kere Iron Ore Block, Hosadurga Taluk, Chitradurga1.00Iron OreTopography survey is in progress
Siddanagondanahalli, Iron Ore Block, Hosadurga Taluk, Chitradurga0.3Iron OreEncouraging results found in Preliminary field studies, hence further investigation will be proposed under state Fund
Bheemanagara Chitat pur Taluk, Kalaburagi2.8LimestoneReport preparation is under progress using field data and available data of adjacent mining lease
Srirangapura Pavagada Taluk, Tumkur1.0QuartzEncouraging resluts found in Preliminatary field studies, hence further investigation will be proposed under state fund.
Ubrani, Channagiri Taluk, Davanagere0.09Titaniferous Vanadiferous MagnetiteCore Drilling work has been completed, Chemical analysis report is awaited.
Survey, p. 296

§ 7.3.8Minor Mineral Administration

723 specified minor mineral quarry leases (including ornamental granite) over an extent of 3380 acres and 3286 non-specified minor mineral quarry leases (excluding ordinary sand) over an extent of 12216 acres have been granted in the State of Karnataka. In this year, till December 2025, the department has granted/ executed 171 non-specified minor mineral over an extent of 867 acres and 44 specified minor mineral over an extent of 201 acres quarry leases.

Sand Mining as per Karnataka Minor Mineral Concession (Amendment) Rules – 2023 & 2024

  • The Government has issued guidelines and tender document on 03.12.2024 for the disposal of sand blocks available in the high order stream/river beds available in the State through tender for sand mining from Government-owned institutions/Government departments. Sand contractors who have obtained contracts through tender have been permitted to supply sand to the public and for government works at the fixed rate of Rs.850/- per unit.
  • Accordingly, at present, a total of 338 sand blocks have been identified in IV, V order streams and higher order stream/river beds in the State for granting sand mining lease through public tender. Out of these, 42 sand blocks have been reserved for government works. Notification has been issued for auctioning 270 sand blocks, and currently, 248 sand blocks have been brought under the e-tender process. The auction process has been completed for 172 sand blocks, out of which 44 bids have been rejected. Letters of intent have been issued for 106 sand blocks. The auction process is in progress for 76 sand blocks. Further, necessary steps are being taken to auction the 44 rejected sand blocks and 26 non-notified sand blocks through tender process.

Details of Sand Blocks Granted Under Previously Prevailing Rules

  • As per the Karnataka Minor Mineral Concession (Amendment) Rules – 2016, there are 28 sand mining lease areas granted through tender-cum-auction in river beds in the State, from which sand is being supplied for public and government works.
  • Under Rule 31-Z of the Karnataka Minor Mineral Concession (Amendment) Rules – 2021, sand mining licenses have been granted in 136 patta lands in the State, and sand from these is being supplied for public and government works.
  • As per the New Sand Policy – 2020 and Rule 31-T of the Karnataka Minor Mineral Concession Rules – 1994, the responsibility of extracting and disposing of sand available in stream order I, II, and III stream beds has been entrusted to the respective Gram Panchayats. Currently, sand is being extracted from 105 sand blocks areas and supplied for local works.
  • Further, as per the New Sand Policy – 2020 and Rule 31-U of the Karnataka Minor Mineral Concession Rules – 1994, work orders have been issued to Hutti Gold Mines Limited (HGML) for sand mining in 18 sand areas in Stream Order IV, V, and higher stream/river beds, and the sand is being supplied to the public and government works at the fixed rate of Rs.850/-.
  • As per Rule 31-U of the Karnataka Minor Mineral Concession Rules – 1994, provision has been made to grant sand mining leases/work orders for a period of 5 years to Government-owned institutions/ corporations/boards for sand blocks identified in Stream Order IV, V, and higher order stream/river beds. Accordingly, sand mining leases have been granted in 17 areas at present.

The details of total number of active Sand blocks, Royalty collection etc., is given in Table 7.39.

Table 7.39Details of total number of active Sand blocks, Royalty collection etc.
ParticularsNo. of working Sand BlocksDispatch Quantity in MTRoyalty Collection (Rs.in lakhs)Sale Price (Rs.in lakhs)DMF
Auctioned Blocks28289776.47231.82462.6023.18
Patat Land1361328048.151062.44424.98106.24
Blocks Reserved for Government works17107354.4985.8834.358.59
Gram panchayat blocks10546282.0037.030.003.70
HGML18202494.01162.000.0016.20
Total3041973955.121579.16921.93157.92
Survey, p. 298

To maintain the ecological balance and adverse effect on groundwater, Government has taken the measures to promote/increase the M-Sand production and utilization as an alternate to river sand. Presently, 1067 Crusher M-sand units is being produced in the 31 districts of the state. By end of December-2025, 17 million MT of M-Sand has been produced against annual target of 30 million MT.

§ 7.3.9District Mineral Foundation Trust

Government of India has amended the MMDR Act w.e.f 12.01.2015 where in under Section 9(B) a provision has been made to establish a trust called the “District Mineral Foundation” which is a non-profit body to formulate and implement programs for the development of the people living in the mine-affected area and supplemented by the guidelines of Pradhan Mantri Khanija Kshetra Kalyana Yojana issued on 16.09.2015. The State Government vide G.O. dated 05.11.2015 notified the establishment of District Mineral Foundation (DMF) in each of the district of Karnataka. Further, the State Government, in exercise of the powers conferred by Section 15(4) of MMDR Act, framed the Rules of District Mineral Foundation (DMF) on 11.01.2016 under the guidelines of Pradhan Mantri KhanijKhsethra Kalyan Yojan (PMKKKY) and same has been amended on 25.07.2016, 08.03.2018 and 06.05.2020. In respect of major mineral, Government of India vide Notification dated: 17.09.2015 has directed to collect the DMF from (i) Mining lease granted after 12.01.2015, Collection of DMF amount at the rate of 10% on royalty. (ii) Collection of DMF amount for Mining lease granted on or before 12.01.2015 at the rate of 30% on royalty. As per order dated: 13.10.2017 passed by the Hon’ble Supreme Court in Transfer Case (Civil) No: 43/2016 FIMI v/s Union of India and others, collection of royalty as per the DMF rules with effect from 17.09.2015. Accordingly, DMF amount is being collected from the mining lease holders. With respect to minor minerals as per the KMMC (amendment) Rules, 2016, which is applicable from 12.08.2016, 30% of royalty is collected as DMF from the quarry lease holders which were granted prior to 2016 and 10% of royalty is collected as DMF from the leases granted through auction for which the lessees are paying average additional periodic payments/additional periodic payments. As per the Karnataka Minor Mineral Concession (Amendment) Rules, 2023, an amount equivalent to 10% of the royalty is being collected from minor mineral leases approved on government land, and an amount equivalent to 30% of the royalty is being collected from licensees approved for minor mineral mining on patta (private) land.

Table 7.40District wise DMF Approved Action Plan details of the year 2025-26 (Upto December 2025)

(Rs.in Crores)

DistrictDMF Collection (Upto November 2025)85 % Available AmountApproved Action plan AmountAmount SpentTotal No. of ProjectsNo. of ongoing projectsNo. of projects completedNo. of project yet to startNo. of projects scrapped/ cancelled
Ballari382.92325.4814.330.00162680
Vijayanagara4.353.70315.890.00291144311628
Kalaburagi56.8848.350.000.0000000
Chitradurga60.5151.430.000.0000000
Bagalkot13.6011.560.000.0000000
Raichur14.2312.105.753.5986200
Koppal5.074.310.000.0000000
Chikkaballapura4.764.050.000.0000000
Belagavi12.1510.330.000.0000000
Bengaluru Urban4.473.800.000.0000000
Bengaluru South2.452.084.772.776758801
Tumakuru3.332.830.000.0000000
Bengaluru Rural4.143.520.000.0000000
Chamarajanagar4.523.843.511.5084040
Hassan1.641.391.200.603232000
Dakshina Kannada7.966.770.000.0000000
Kolar1.891.610.000.0000000
Udupi2.522.140.000.0000000
Chikkamagaluru2.171.840.000.0000000
Utat ra Kannada0.880.756.474.855857010
Gadag1.070.910.610.4921100
Davanagere1.321.120.000.0000000
Dharwad1.160.990.000.0000000
Mandya1.701.450.000.0000000
Haveri0.380.320.770.6354100
Vijayapura1.761.503.842.854545000
Yadgir2.271.930.000.0000000
Mysuru1.301.110.000.0000000
Shivamogga0.140.120.000.0000000
Bidar1.201.020.000.0000000
Kodagu1.191.010.000.0000000
Total603.93513.34357.1517.285323532112929
Survey, p. 299

Till the end of December 2025, a total of 14271 works have been approved with an outlay of 4248.55 crores, in which 7613 works have been completed and 2758 works are in progress. Action has been initiated to take up 1603 works and 2297 works have been cancelled. A total of Rs 2521.56 crores have been spent up to December 2025.

Table 7.41Details of District wise approved Projects for the financial year 2025-26 up to end of December 2025

(Rs. in Crores)

DistrictApproved Cost as per action planTotal No.of ProjectsProjects CompletedOn Going ProjectsProjects Yet to StartProjects Cancelled
Ballari14.33166280
Chamarajanagar5.5191530
Chikkaballapura0.5010100
Gadag0.6121100
Hassan1.203203200
Haveri0.8261500
Raichur5.7582600
Ramangara4.7767204601
Utat ra Kannada6.475805710
Vijayanagara315.89291314811228
Vijayapura3.844504500
Total359.705353434812429
Survey, p. 300

§ 7.3.10Rule 18 of DMF Amendment Rules 2018

1. 10% of the fund is earmarked for endowments purpose (as amended on 08.03.2018) after closure of mining activity in the affected areas. 2. 5% of the funds from DMF is earmarked for administrative purpose, out of which 4% is to be utilized for the administrative purpose at the District level and remaining 1% is to be transferred to the Department for the maintenance of the State Level Monitoring and Evaluation Cell and to meet the administrative expenses. 3. Remaining 85% shall be utilized for implementation of projects and schemes prescribed under Pradhan Mantri Khanij Khsethra Kalyan Yojana (PMKKKY) in the ratio of 60:40, for high priority areas and other priority areas, respectively. The following are the priority areas (60%) for utilization of funds 1. Drinking Water Supply 2. Environment preservation and pollution control measures 3. Health Care 4. Education 5. Welfare of Women and Children 6. Welfare of Senior Citizens and differently abled persons 7. Skill development 8. Sanitation The following are other priority areas (40%): 1. Physical infrastructures 2. Irrigation 3. Energy 4. Watershed developments 5. Other measures for enhancing environmental quality in mining area Details of the schemes undertaken as per Pradhan Mantri Khanija Khsethra Kalyan Yojana Guidelines and Rule 18 (3) of DMF T 2016 are given in the Table 7.42.

Table 7.42Details of schemes implemented under Pradhan Mantri Khanija Kshetra Kalyan Yojana
Details of projects under implementationNumber of ProjectsNo. of projects completedNo. of ongoing projectsNo. of project yet to startNo. of projects scrapped/ cancelledAction Plan Approved AmountExpenditure
Drinking water Supply785656217.972.57
Environment preservation and pollution Control Measures610415.110.11
Health care231129115.882.38
Education1063929262.296.14
Welfare of Women and Children385237318.540.60
Welfare of aged and disabled people101001.000.00
Skill development100010.000.00
Sanitation114244541488.520.37
Physical Infrastructure140392405146.164.09
Irrigation000000.000.00
Energy and watershed development101000.150.11
Any other measures for enhancing environmental quality in mining districts24123001.540.92
Grand Total5322135312929357.1517.28
Survey, p. 301

§ 7.3.11Comprehensive Computerization of Mineral Administration

Table 7.43Integrated Lease Management System (ILMS) transaction details are as below
The ILMS Registration details of Major Mineral
Particulars2025-26 to up to December 2025
Total no. of Beneficiation plant2
Total no. of Weighbridge59
Total no. of integrated weighbridge0
Total no of buyers374
The ILMS Registration details of Minor Mineral
Total No. of Leases223
Total no. of Crushers54
Total Minerals dispatch Permit Issued
From Major Minerals1809341
From Minor Minerals4452879
Total Revenue transacted Rs. in Crore
Royalty5884.77
DMF688.81
NMEDT51.16
SPV1422.45
TCS34.28
Survey, p. 303

To deliver effective e-mineral administration in the Department of Mines and Geology, the Integrated Lease Management System (ILMS) was designed in 2011 and has been successfully implemented. Under this centralized system, systematic and rule-based management and regulation of mining operations activities in mining lease and the transportation of minerals from the mining lease areas to end users are tracked digitally in real time. The system enables issuance of permits for mineral transportation, registration of mining lease holders and mineral-based industries, e-return submission by lease holders, mineral purchasers and mineral-based units, and integration with the Forest Department, (Forest Produce Tracking System - FPTS), Google and online payment through integration with the Treasury Department’s K-II software. As information technology is changing rapidly, it is necessary to upgrade the mineral administration system in the department. This will help improve the quality of existing services and provide additional services so that the public and entrepreneurs can receive services on time. Therefore, a work order has been issued to the Center for Smart Governance to design a new ILMS software similar to the current ILMS system, migrating the data from the existing ILMS in phase I and development of additional modules in Phase II. Accordingly, in the first phase, CSG redesigned ILMS 1.0 and migrated the existing data. The new ILMS system was successfully implemented on 12-12-2024. In the second phase, that is during the years 2025–26 and 2026–27, steps will be taken to develop the following modules. 1. KYC Module 2. e-Marketplace Portal for Online Booking 3. Automated Acknowledgement of Mineral Receipt by End Users 4. Reconciliation (Mineral Grade and Quantity/Value) 5. DCB and Auditing 6. Integration with Conveyor Belt Weighing System 7. Integrated Weighbridge, CCTV Monitoring, and Automation System at Check-Posts 8. Helpdesk Ticketing System 9. Dashboard 10. Integration of DGPS Survey / Drone Data with ILMS for Verification Mobile Application 11. Penalty and Fee Collection System 12. Vehicle Movement Monitoring System for Authorized Officers (OSOG) 13. Mineral lot inspection and Sample Collection by Authorized Officers Integration with other departmental software 14. Integration with the Indian railway’s FOIS, GST, Indian Bureau of mines, Income Tax Department, MOEF, KSPCB, Transport Department Enabling of Departmental Services to Promote Ease of Doing Business (EODB) 15. Grant of major mineral leases and composite mineral leases (for major minerals) 16. Grant of minor mineral leases and composite minor mineral leases (for minor minerals) 17. Grant of license for minor minerals 18. Registration and renewal of mineral-based industries (major minerals) 19. Registration and renewal of mineral-based industries (minor minerals) 20. Issuance of licenses to stone crushing units 21. Issuance of temporary permits 22. Registration of mineral importers and exporters 23. Registration of end-users (major and minor minerals, for public use) 24. Transfer of major and minor mineral leases

§ 7.3.12Ongoing schemes of the department

The Table 7.44 shows the allocation, release, revised, re-appropriation and expenditure of the budget earmarked for the ongoing schemes in 2024-25 and 2025-26 (Upto Dec 2025).

Table 7.44Details of the grant and expenditure of the on-going schemes for the year 2024-25 and 2025-26

(up to December 2025), (Rs. in lakhs)

Name of the Scheme & Head of AccountBudget allocation 2024-25Revised/ re-appropriated BudgetBudget Released 2024-25Expenditure 2024-25Budget allocation 2025-26Budget Released 2025-26Expenditure Up to end of Dec-2025
Training of officers and staff 2853-02-102-0-1020.020.0020.0016.3920.005.000.35
Exploration, Research and Development 2853-02-102-0-151050.00600.00600.00596.781050.00262.50109.80
Filling up of Stone Quarry Pits 2853-02-102-0-17200.00200.00200.00190.00200.0050.0044.77
Total1270.00820.00820.00803.171270.00317.50154.92
Survey, p. 304

§ 7.3.13Challenges

  • As per rule 8(5) of KMMCR-1994, it is mandated to get the No Objection Letter (NOC) from Revenue and Forest Department and Environmental Clearance from State Environmental Impact Assessment Authority (SEIAA) for grant of quarry lease in Government land within the stipulated time.
  • Obtaining forest clearance within the stipulated time from the Forest Department for exploration of mineral blocks and also for the mining activities in auctioned mining lease blocks falling within forest area.

§ 7.3.14Way Forward

  • More Exploration programmes will be taken up with the help of Government and Private Exploration Agencies by best utilizing the National Mineral Exploration Trust Funds and efforts will be made to optimally utilize the mineral resource of our State.
  • A new application called ILMS (Integrated Lease Management System) has been developed and successfully implemented by the Center for Smart Governance with the latest technology to computerize the mineral administration of the department. In the 2nd phase, new sub-modules such as mineral sample collection and analysis, EODBS, e-market reservation, DCB and auditing, Integrated CCTV surveillance, Fine and fee collection system, integration with RTO, GST, PAN, Conveyor, IBM, PGS & auction platform, role wise real time dashboard are being developed.
  • Department is aiming to have full-fledged exploration wing at district level with qualified and experienced Officers/ staff.
  • Revenue leakage will be prevented by regularly carrying out Drone Survey of all minor mineral quarries in the State to scientifically estimate the Quantity of mineral consumed every year.

§ 7.4Climate Change Adaptation and Mitigation Measures

§ 7.4.1Mainstreaming the Karnataka State Action Plan on Climate Change-State-Level Capacity Building on KSAPCC Monitoring Dashboard

To effectively implement the climate actions targeted under KSAPCC V.2, the Government of Karnataka has issued a G.O. (No. FEE 151 ENV 2024, dated 24.03.2025), enabling the departments to constitute committees to monitor and evaluate the progress of the Key Performance Indicators (KPIs). A total of 15 departments have identified and initiated implementation of over 90 KPIs related to climate adaptation and mitigation across their respective programmes. To support real-time monitoring, EMPRI, in partnership with the Centre for Environment Education (CEE-South), Bangalore, has developed the KSAPCC Monitoring Dashboard. A state-level hands-on training programme was conducted during 28–29 October 2025 at The Ritz-Carlton Hotel, Bangalore, for over 95 nodal officials from 15 departments, enabling improved reporting efficiency and data-driven climate decision-making.

Figure 7.6Training to the departmental officials on KSAPCC Monitoring Dashboard https://ksapccmonitoring.in
  1. KSAPCC Monitoring Dashboard (ksapccmonitoring.in)
    • Karnataka State Action Plan on Climate Change (2024-2030)
    • Dashboard to Monitor the Progress of Departmental Climate Actions (Key Performance Indicators)
    • Menu: Home, Background, How it works, Partners, Gallery, Resources, Department Login

A screenshot of the dashboard's home page with no numbers; its labels are listed here.

Survey, p. 305

§ 7.4.2Departmental Capacity Building and Trainings conducted by EMPRI

1) District-Level Trainings for Government Officials on State Climate Actions

To ensure climate-responsive planning at the district level, EMPRI has conducted capacity- building programmesfor the district-level officials across all 31 districts of Karnataka, covering over 10 different sectors including Agriculture, Forestry, Water, Livestock, Coastal and Fisheries, Energy, Health, Transport, Urban Development, and Waste Management. A total of 1,447 government officials were trained. The trainings enhanced understanding of climate vulnerability, departmental KPIs, and the integration of climate adaptation and mitigation measures into local planning frameworks.

2) Radio Programme for Public Outreach – “Havamana Mitra”

To enhance public awareness and outreach on the climate change action plan in the state, EMPRI has launched the radio program“Havamana Mitra,” broadcasted through Akashavani (612 kHz). The programme aims to strengthen climate literacy, particularly among rural and agriculture-dependent communities. Of the 24 programmes planned for the year, 15 have been successfully broadcasted, featuring experts, farmers, and government officials discussing climate-resilient agriculture, water conservation, sustainable resource practices, and heat preparedness measures.

3) MoEF&CC, GoI-Sponsored Workshopson Climate Change

1. Capacity Building for Media Personnel

A 3-day workshop on “Crafting Climate Narratives: Responsible Journalism for Sustainable Development” was conducted during 15-17 July 2025 at Kumara Krupa Guest House in Bangalore/Bengaluru, with the participation of 30 journalists. The workshop aimed at improving the accuracy, depth, and responsibility in climate reporting by understanding the climate science and state adaptation and mitigation priorities.

2. Capacity Building for Class I/A Officers

A targeted capacity-building programme for Class I Officers on “Enhancing Climate Action: Integrating Climate-Smart Practices across Agriculture, Water Resources, Horticulture and Livestock Sectors” washeld during 14-16 October 2025 at Kumara Krupa Guest House in Bangalore. The programme strengthened the capability of Class I/A officers to mainstream adaptation strategies and promote convergence in climate action implementation. A total of 33 officials attended the programme.

§ 7.4.3EMPRI Participation in the National Workshops

Table 7.45EMPRI actively contributed to national-level discussions on climate change and sustainability.
WorkshopOrganised byDate / VenueRole of EMPRI
Climate Finance Needs and Blueprint of Climate Finance Facility forMoEF&CC UNDP GT India16 September 2025, JW Marriot, BengaluruFacilitated the participation of line departments
Sustainability and Material Compliance ConferenceIIMB-Supply Chain Management Centre26 September 2025, IIMB, BengaluruDelivered a presentation on Karnataka’s climate initiatives
Third Annual Sustainability Leadership Summit - Net-Zero -Achieving India’s TargetsCentre for Sustainable Development4 November 2025, The Capitol Hotel, BengaluruParticipated in discussions on skilling for SDGs and Net Zero- Scope and opportunities
Survey, p. 306

Way Forward

Going forward, strengthening the usage and regular updating of the KSAPCC Monitoring Dashboard by all nodal departments will remain crucial for transparent tracking of climate actions. Continued expansion of district-level refresher training programs, along with the scaling of climate awareness efforts through community and local radio networks, will enhance public and institutional climate preparedness. Improved convergence across departments will further support systematic integration of adaptation and mitigation strategies into planning and service delivery frameworks.

§ 7.5Karnataka State Natural Disaster Monitoring Centre - KSNDMC

Karnataka has been subjected to various Natural Disaster, both Hydro Meteorological and Geological successively every year. Devastating weather phenomena like successive Drought, Flood, Hailstorm, strong surface winds and intense vertical wind shear have been causing loss of life and property in the State as below:

  • 80% of the Geographical area in the State is prone to Drought.
  • 22% of the Geographical area in the State is prone to moderate earthquake risks.
  • 24% of the Geographical area in the State is prone to cyclone and heavy winds.
  • Landslides do affect the areas with slopes of more than 30%.
  • The 320 k.m. coastal line is prone to sea erosion and Tsunami threat.
  • Hailstorms are experienced almost every year and cause damages to crops, human lives and livestock.
  • Thunderstorms, cloudburst and lightning cause considerable damages and loss to lives and properties.
  • All the districts in the State are vulnerable to more than one natural hazard.

To monitor and mitigate the impact of these Disasters, for the first time in the Country, Govt. of Karnataka installed an Institutional Mechanism in the form of “Drought Monitoring Cell” (DMC) in 1988. Subsequently, DMC was renamed as “Karnataka State Natural Disaster Monitoring Centre” (KSNDMC) with a mandate of Monitoring all the Natural Disasters in the State. Since 2007, KSNDMC has taken up pioneering and path breaking initiatives towards monitoring all the Natural Disasters. KSNDMC has Core activities, which include maintaining and updating database on drought and flood parameters, preparation and issuance of periodical reports on drought indicators and conducting integrated studies on Drought Management in the Drought-prone districts of Karnataka.

Weather Monitoring

Karnataka, the 8th largest State in the Country in terms of geographical area (19.1M. sq.km) is one of the States having largest rainfed agriculture area in the Country heavily dependent on Monsoon rainfall, while the spatial and temporal distribution of rainfall varies significantly within the State. For implementing sustainable agriculture practices and protecting the livelihood of the farmers, the reliable weather data observed on the ground and weather forecast with a high spatial and temporal resolution are very important. Thus, in order to capture the variation in the rainfall distribution and to cater to the needs of weather information to different sectors, including the farming sector, a unique model of Weather Monitoring Network has been designed, developed and operationalised in the State by KSNDMC. It has established a network of GPRS enabled and solar-powered 6,605 Telemetric Rain Gauges (TRG) at all the Grama Panchayaths at every 25 sq. km and 843 Telemetric Weather Stations (TWS) at all the Hoblis at every 250 sq. km in the State. The weather data comprising Temperature (⁰C), Relative Humidity (%), Wind Speed (m/s), Wing Direction (Degrees), Rainfall amount (mm) and intensity (mm/hr). Data is being collected at every 15 minutes through these weather monitoring stations. The density of weather monitoring stations network is the highest and first of its kind in the country.

It generates Rainfall / Weather Forecast for Karnataka every day in collaboration with national agencies like Space Applications Centre (SAC), Ahmadabad and Satish Dhawan Space Centre (SDSC-SHAR), Sriharikota, Indian Space Research Organization (ISRO) and India Meteorological Department (IMD), MoES, Govt. of India. Short Range Weather Forecast: which Includes forecast for rainfall, temperature, cloud cover, wind speed and direction at Grama Panchayath level for the entire State. Rainfall related Drought indicators are rainfall deficiency, Dry spell standard precipitation index and moisture adequacy index.

Flood Monitoring

Flood is one of the most common and recurring Natural Disasters in the State, in the recent decades. Large parts of North Interior Karnataka, which is under Krishna River basin, is prone to severe floods. Similarly, the Malnad region and parts of South Interior Karnataka, which are in the Cauvery River basin, are also prone to floods and associated with landslides/mudflows. Heavy and high-intensity rainfall during the Monsoon season has been causing floods in one or the other parts of the State resulting in loss of life, livelihood, property, enormous damage to the standing crops, destroying critical infrastructure. Considering the flood severity over the State a dedicated Flood Forecast Cell with a group of officials was created at KSNDMC, which facilitates the stakeholders to take appropriate measures to mitigate the impact of floods, for providing flood forecast, alerts and early warnings.

Urban Flood Monitoring

An integrated Urban Flood Monitoring Model for Bengaluru City (UFM) is being developed by KSNDMC in collaboration with Indian Institute of Science (IISc) Bengaluru, to manage floods in the city. An efficient forecast system with a well-established network of 100 Telemetric Rain gauge Sensors and 12 telemetric weather stations with integrated two-dimensional flood model, along with 26 water level sensors, provides information on the spread of the flood water (vis-à-vis flood inundation). An automated information dissemination Web Portal and a Mobile app named Bengaluru Meghasandesha (BMS) has been developed to disseminate relevant information to stakeholders. KSNDMC has established a smart weather monitoring system comprising (75 Telemetric Rain Gauges, 29 Telemetric Weather Sensors and 50 water level sensors) using an ICT enabled sensors network and hydrological model. This system continuously monitor dynamic weather condition and provide S & T based inputs for effectively managing the urban flood events in Smart cities of Belagavi, Mangaluru and Hubballi-Dharawada.

Seismic Monitoring

KSNDMC at its Master Control Facility (MCF) is receiving the Seismic data on real time from the 14 remote Observatories through VSAT & GPRS modes. The data received to KSNDMC is being monitored by the scientific personnel and information pertaining to local earthquakes is being marked for further analysis. Necessary processing techniques are adopted by applying required filters to the recorded seismic data to enhance the seismic signal and suppress local noise level. The analyzed earthquake event is initially disseminated to officials of the District, Taluk, Grama Panchayath and Dam Authorities through SMS. Subsequently a technical report with be disseminated detailing the geology of the area where the tremor was felt, presenting the recorded seismograms with markings of primary and secondary waves, mapping the faults, major & minor lineaments in the area, (if any), and outlining Do’s & Don’ts during an earthquake along with safety measures for the local community. The processed information from the above stations is also being made available to the users through the Centre’s web portal at www.ksndmc.org and via e-mails. To address the Seismicity in the State, KSNDMC has established a network of 14 VSAT enabled and solar powered permanent seismic monitoring stations at different vulnerable locations across the State. Through this network of Stations, KSNDMC is monitors local, regional and teleseismic earthquakes.

Early warning dissemination through centralized wireless broadcasting system

In order to provide early warning with sufficient lead time to the vulnerable community to take appropriate action and mitigate the impact of any disaster, a comprehensive Early Warning System with last mile connectivity is being installed in 104 highly disaster vulnerable Grama Panchayaths in Karnataka. The Stateof-the-art technology driven system is designed for disseminating necessary and precautionary messages through public announcements from central system directly to the vulnerable Grama Panchayaths. The solution follows a 3-tier system where messages can be relayed directly from State or District or Taluk Headquarters to the Grama Panchayaths.

Risk Transfer Mechanism

The high-resolution weather data collected from the ground level has been used for the implementation of Crop Insurance Scheme in the State, which is considered as a risk transfer mechanism. The weather data is used at different levels. First, it is used in designing the Term-sheets in case of Restructured Weather Based Crop Insurance Scheme (R-WBCIS) wherein area-specific and crop-specific term sheets are designed by agencies using high-resolution historical weather data. Similarly, the ground-level weather data is also being used by the public for claiming insurance for the damage loss of property incurred due to weather aberration. Incidences of damage to industrial sheds or the chimneys due to high wind activity are being established and assessed using the weather data collected from the TWS station network. Likewise, damages to the polyhouses installed for floriculture and/or cash crop cultivation are also assessed using the weather data.

Water Resource Management

The information on the weather, based on the high-resolution data, and weather forecast is also being used for the efficient management of the water resources in the State. For instance by considering the available water storage in the Reservoirs, the current inflow based on the ongoing rainfall activity in the catchment and expected inflow based on the rainfall forecast, the water is allocated / utilized for drinking, industries and irrigation for the agriculture.

Information Dissemination Mechanism

Information Dissemination play an important role in disaster risk reduction. KSNDMC has deployed various dissemination systems to communicate disaster-related information through Alerts, Advisories and Early Warnings to all the Government Executives & Community at last mile in real-time. High Spatial and Temporal resolution data thus collected from the ground on various parameters are being converted into information. Subsequently, in conjunction with the weather forecast, the meteorological information is used to generate customized weather Advisories which are disseminated to the users. This has enabled the stakeholders at all levels to take appropriate decisions at the right time in the domain of Drought Monitoring & Management, Crop Assessment Survey Mechanism, and Water Resource Management. Implementing Insurance Schemes and Power generation and Grid load management.

24x7 Interactive Help Desk “VARUNA MITRA”

KSNDMC currently operates the 24x7 Varuna Mitra Help Desk, which provides information on Weather forecast & advisories across the State farmers and to the wider community. Leveraging this existing mechanism at Varuna Mitra, KSNDMC is efficiently delivering timely advisories and other critical agricultural information to take up agricultural activities like, sowing, pest control application, irrigation and harvesting. 11.43 lakh calls registered in Varuna Mitra Help Desk to get information about weather forecast during 2025. Yearwise number of calls registered in the Varuna Mitra Help Desk from 2011-2025 is furnished in Figure 7.7.

Figure 7.7Year wise call details registered in the Varuna Mitra Help Desk
  • Calls registered
Calls
05,00,00010,00,00015,00,00020,00,00025,00,000
201120122013201420152016201720182019202020212022202320242025
The numbers
Calls registered
20116,585
201236,253
20132,23,732
20143,58,520
20157,07,790
20169,92,014
201712,88,857
201815,13,352
201911,83,092
202014,90,076
202118,63,396
202218,79,448
202322,49,706
202417,48,045
202511,42,624

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 310

Way Forward

1. Strengthen Predictive Analytics and Early Warning Systems by enhancing the use of advanced modeling, AI/ML, and multi-hazard simulations using the high-resolution data already available with KSNDMC to improve accuracy, lead time and reliability of forecasts, early warnings, and impact-based advisories. 2. Move towards Integrated, Impact-Based Multi-Hazard Forecasting to integrate drought, flood, urban flood and seismic monitoring outputs into a unified, impact-based decision support system that links hazard intensity with likely impacts on agriculture, water resources, infrastructure and livelihoods, enabling faster and more targeted response by line departments. 3. Institutionalizing the use of high-resolution weather data in crop insurance, industrial risk assessment, and water allocation by integrating automated thresholds, decision rules, and dashboards to enable faster, transparent and evidence-based claim settlement and water resource planning. 4. Expanding of Varun Mitra through multilingual support, AI-assisted query handling, mobile and digital platforms, and wide outreach to underserved regions, while maintaining its interactive, last-mile focus to maximize adoption, trust and real-world impact across sectors. 5. Scaling up structured capacity-building, internships, and Centre of Excellence (CoE) initiatives to create a continuous talent and knowledge pipeline, while deepening collaboration with national, international and funding agencies (GoI, World Bank, UN platforms) to mainstream science-based DRM and climate resilience.

§ 7.6Waste Management in Karnataka-realities and Opportunities

§ 7.6.1Solid Waste Management in Karnataka

Karnataka is one of the major contributors to solid waste in India, primarily due to its urban centers like Bengaluru, Mysuru, and Hubli-Dharwad. Bengaluru, the state’s capital and IT hub, generates the most significant amount of solid waste, followed by other cities and towns. According to reports, Bengaluru alone generates around 5,000 to 6,000 metric tons of solid waste per day. This number increases as the population grows and urban sprawl continues. Karnataka’s waste generation is largely a result of Residential waste, Commercial and industrial waste, Waste from street cleaning and Construction and demolition waste. Karnataka has implemented several measures to handle the growing waste management challenge. These efforts includes door to door waste collection, segregation, processing, recycling and disposal mechanisms. The state government, along with municipal corporations, has developed waste management policies and has been actively pursuing solutions to improve the situation. Bengaluru, which was once struggling with overflowing landfills, has now started the process of creating sanitary landfills that meet modern environmental standards.

Current status of Solid Waste Management in Karnataka

Table 7.46Status of implementation of the Solid Waste Management Rules, 2016 Local Body Total Numbers
Survey, p. 311
Table 7.47The details of the municipal solid waste generated, collected, processed in Karnataka is as follows Sl.No Details Quantity in TPD
Survey, p. 311
Table 7.48The details of the solid waste processing facilities operational in Karnataka
No of ULB’sProcessing facilitiesQuantity
224Composting6261 TPD
73Bio gas44.76 TPD
BBMP AreaProcessing facilitiesQuantity
8Composting2120 TPD
1Waste to Energy Plant(KPCL, Plant at Bidadi)600 TPD
Survey, p. 312
Table 7.49The details of the disposal sites of solid waste in Karnataka
Sl.No.Details of the disposal sites of solid wasteNo of ULB’s
1Land fill sites identified301 out of 316 ULB’s
2Landfill sites constructed176
3Landfill under construction91
4Landfill in operation174
5Landfill exhausted02
6Landfill capped02
Survey, p. 312
Table 7.50The details of the solid waste dumpsites in Karnataka
Sl.No.Details of the solid waste dumpsitesNo of dumpsites
1Existing dumpsites231
2Dumpsite reclaimed/ capped20
3Dumpsite converted sanitary land fill00
[*Note: The above details are submitted by DMA & BBMP in their annual report under MSW Rules,2016] · Survey, p. 312

Way Forward

  • The future of solid waste management in Karnataka will be strengthened through continued emphasis on: Waste minimisation by reducing waste generation, promoting eco-friendly products, and adopting waste-to-resource solutions.
  • Greater integration of smart technologies, such as real-time monitoring of waste collection systems, will support improved operational efficiency.
  • Enhanced community participation, particularly through awareness, training, and motivation for segregation at source, will remain critical in reducing the quantity of waste sent to landfills.
  • Further adoption of circular economy principles, treating waste as a recoverable resource for reuse, recycling, and value addition, will contribute to sustainable and environmentally sound solid waste management across the State.

§ 7.6.2Sewage Management in Karnataka

Introduction

Sewage management is a critical component of urban planning, environmental protection, and public health. In Karnataka, as in many other states, rapid urbanisation, population growth, industrial expansion, and infrastructure development have resulted in increased generation of sewage, placing considerable stress on existing collection, conveyance, treatment, and disposal systems. Proper treatment and environmentally safe disposal of sewage are essential to prevent contamination of surface and groundwater sources, safeguard public health, and protect aquatic ecosystems. Karnataka has several major urban centres, including Bengaluru, Mysuru, Hubli–Dharwad, and Mangaluru, where sewage management poses a significant challenge due to high population density and accelerated urban growth. Many cities are witnessing expansion beyond planned limits, resulting in gaps between sewage generation and treatment capacity, incomplete sewerage networks, and dependence on on-site sanitation systems. These challenges necessitate continuous augmentation of sewage infrastructure and strengthening of operational efficiency to ensure compliance with prescribed environmental standards. Sewage management in Karnataka is undertaken through a multi-agency institutional framework. The Bangalore Water Supply and Sewerage Board (BWSSB) is responsible for the collection, treatment, and disposal of domestic sewage within Bengaluru city limits. In other Urban Local Bodies (ULBs), sewage management is overseen by the Directorate of Municipal Administration (DMA). The development and augmentation of sewage treatment infrastructure, including Sewage Treatment Plants (STPs) and sewerage networks, are supported by agencies such as the Karnataka Urban Water Supply & Drainage Board (KUWS&DB) and the Karnataka Urban Infrastructure Development and Finance Corporation (KUIDFC). These agencies play a crucial role in planning, financing, and implementing sewage management projects to address current gaps and meet future demand.

Current Status of Sewage Management in Karnataka

Table 7.51Detail of Existing BWSSB STPs in Bengaluru List of STPs in BWSSB
Sl. No.NameCapacity in MLDLocation near toTypes of process for treating sewageInflowDrainage Zone
1K&C valley218Belur Nagasandra (near Challaghatat )Activated Sludge Process (ASP)153.66Challaghatat valley
2K&C valley30Belur Nagasandra (near Challaghatat )Activated Sludge Process (ASP)31.41
3K&C Valley60Belur Nagasandra (near Challaghatat )ASP with power generation59.98
4K&C Valley150B.NagasandraSecondary -Activated Sludge Process (ASP)148.20
5Lalbagh1.5Lalbagh kereActivated aeration + plate settlers + UV disinfection1.23
6Cubbon Park4Cubbon Park (upgraded)Membrane Bio Reactor2.50Challaghatat valley
7K.R.Puram20Tambuchetti palya RoadSequential Batch Reactor19.81
8K.R.Puram Ph-I20Tambuchetti playa RoadUASB + Extended Aeration14.70
9Yelemallappa Chetti kere15Yelemallappa Chetti kereSequential Batch Reactor13.63
10Bellandur Amani kere90Vartur kereActivated Sludge Process (ASP)88.20Koramangala valley
11Kadabeesanahalli Ph-I50Marathalli Outer Ring RoadExtended Aeration31.50
12Kadugodi6KadugodiSequential Batch Reactor5.22
13Halasuru2Halasuru LakeSequential Batch Reactor1.93
14Sarakki5Sarakki kereSequential Batch Reactor4.77
15Agaram35Agara Ring RoadSequential Batch Reactor34.51
16Hulimavu10Hulimavu kereSequential Batch Reactor8.00
17Chikkabegur5Near Chikkabeguru kereSequential Batch Reactor4.24
18Madivala4Madivala lakeSequential Batch Reactor2.08
19Rajacanal - Ph-I40Geddalahalli near HebbalExtended Aeration40.51Hebbal
20Hebbal100Nagavara kereSequential Batch Reactor86.54
21Jakkur15Jakkur kereUpflow Aerobic Sludge Blanket (UASB) + Extended Aeration14.98
22Yelahanka Ph-I10Allalasandra kereActivated sludge Process (ASP) + filtration + Chlorination9.97
23Hennur1Hennur lakeSoil Bio Technology0.54
24Rajacanal40Geddalahalli near HebbalSequential Batch Reactor32.68
25Horamavu Agara20In between Kalkere and Horamavu Agara kereSequential Batch Reactor16.57
26Nagasandra Ph-I20Near Madavara kere (near Tumkur Road)Extended Aeration14.57
27Nagasandra20Near Madavara kere (near Tumkur Road)Sequential Batch Reactor16.50
28Chikkabanavara5Chikkabanavara kereSequential Batch Reactor4.88
29Putet nahalli7Putet nahalli lakeSequential Batch Reactor5.08
30Mailasandra Ph-I75MailasandraExtended Aeration80.03Vrishabhavathy
31Doddabele20DoddabeleSequential Batch Reactor28.66
32Kengeri60Near Kengeri bus standSecondary-Activated Sludge Process58.30
33Doddabele40DoddabeleSequential Batch Reactor39.95
34V.Valley150Mysore RoadActivated Sludge Process (ASP)137.38
Total1348.51212.71
*3 BWSSB STP’s are under re-construction i.,e Mallathahalli – 10 MLD, Kempambhudi- 10 MLD and V.Valley 150 MLD. · Survey, p. 313

Karnataka has a total of 316 Urban Local Bodies (ULBs), including the Greater Bengaluru Authority (GBA), of which 27 are covered under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) and 288 fall under the non-AMRUT category. Across the State, sewage treatment facilities have been established in 132 ULBs to treat domestic sewage and sullage. With respect to wastewater management in Bengaluru city, the urban population is approximately 1.5 crore, and the total sewage generation is estimated at about 1,480 MLD. The city is presently served by 34 Sewage Treatment Plants (STPs) with an aggregate installed treatment capacity of 1,348.5 MLD, against which approximately 1,212.71 MLD of sewage is currently being treated. The details of the existing wastewater treatment facilities in Bengaluru, along with the utilisation of treated effluent, are presented in Table given below

Way Forward

To improve sewage management in Karnataka, a comprehensive and multi-pronged approach is required: Priority must be given to expanding sewerage networks in rural, peri-urban, and newly developed urban areas to ensure universal access to safe sanitation and sewer connections. At the same time, upgrading, modernising, and augmenting sewage treatment capacity—particularly in major urban centres such as Bengaluru—along with establishing new Sewage Treatment Plants (STPs) in underserved and rapidly urbanising regions, is essential to address increasing sewage generation. Strengthening community participation through sustained public awareness and capacity-building programmes will promote responsible sanitation practices and prevent misuse of sewerage systems. Substantial financial investment from State and Central Governments, supplemented by multilateral and international funding, will be required to bridge infrastructure gaps and ensure long-term sustainability. Further, adoption of circular economy principles—by promoting reuse of treated wastewater for non-potable applications such as industrial processes, landscaping, construction, and groundwater recharge, along with recovery of resources such as energy and nutrients from sewage—will enhance water-use efficiency, reduce pollution loads on water bodies, and address growing water scarcity across the State, supported by strengthened policy and regulatory enforcement.

§ 7.6.3Polluted River Stretches in Karnataka

Introduction

Urbanization adversely affects physical, chemical, biological aspects and life support system of river ecosystem beside landscape changes. Chemical and Physical properties of the urban rivers get altered due to municipal and industrial discharges. Direct dumping of sewage and MSW into the river and addition of harmful chemicals from agricultural runoff contributes to river pollution and eutrophication. Urban rivers are commonly characterized by presence of organic pollutants, high Total Suspended Solid (TSS), Nitrate and Eutorphication, high Biological Oxygen Demand (BOD), Chemical Oxygen Demand(COD).

Current Status of Polluted River Stretches in Karnataka

Based on the Biological Oxygen Demand (BOD) value at the water quality monitoring locations along the river stretches, CPCB has identified 311 Polluted River Stretches (PRS) throughout India wherein BOC exceeds 03 mg/l. In the financial year 2016-17, based on water quality, the Central Pollution Control Board (CPCB) has identified the 17 polluted river stretches namely, Arakavati, Lakshmanteertha, Malaprabha, Tungabhadra, Bhadra, Kaveri, Kabini, Kagin, Kali, Krishna, Asangi-Krishna, Shimsha, Bhima, Netravati, Kumaradhara, Tunga and Yagachi. For the rejuvenation and restoration of river pollution, an action plan has been prepared. This action plan included the installation of sewage treatment plants (STPs) and wastewater treatment units. To rejuvenate the polluted rivers, a time-bound action plan has been formulated and with the approval of the CPCB the plan has been implemented since 2019-2020. In the year 2022, the Central Pollution Control Board, due to improvements in the water quality of 5 rivers, the river basins of Yagachi, Asangi-Krishna, Kumaradhara, Kali and Malaprabha have been removed from the list of 17 polluted river stretches and Karnataka has only 12 polluted river stretches. Further, the Central Pollution Control Board in 2022-23, has included the following additional 4 nos of rivers from Karnataka to the list of polluted rivers namely, Gangavali, Aghanashini, Sharavathi and Dakshina Pinakini (Thenpennai). The River Thenpennai is not in Karnataka and hence requested the CPCB to exclude from the list of Karnataka PRS and 3 PRS namely Gangavali, Aghanashini, Sharavathi where the BOD is observed to be <3mlg/l since year 2020 and hence, the CPCB has been requested to delete the same on 14.10.2022. Presently, 12 PRS namely, Arkavathi, Laksmanteertha, Tungabhadra, Bhadra, Tunga, Kaveri, Kabini, Kagina, Krishna, Shimsha, Bhima and Netravati are in Karnataka under the catchment of 30 ULBs. Among the 12 polluted river stretches (PRS) in Karnataka, 1 PRS namely Arkavati river is identified as ‘P1’ (BOD in the range of >30mg/l), there are no rivers in ‘P2’ (BOD in the range of 20 - 30mg/l) & ‘P3’ (BOD in the range of 10 - 20mg/l) and 3 rivers, Tungabhadra, Bhadra and Shimsha are identified as ‘P4’ (BOD in the range of 6.1 - 10.0mg/l), while the remaining 8 rivers, Lakshmantirtha, Tunga, Cauvery, Kabini, Kagina, Krishna, Bhima and Netravati are identified as ‘P5’ (BOD in the range of 3.1 - 6.0mg/l). A basic inventory to identify the pollution source reveals that the 40 ULBs cummilatively generate 817.31 MLD sewage. A total of 14 sewage treatment plants (STP) in these ULBs of capacity 614.1 MLD capacity utilization of existing 14 STPs of the generated sewage is 527.56, while 203.21 MLD sewage is untreated which eventually enters the rivers making them highly polluted. Karnataka has taken special interest in rejuvenation of 12 PRS and facilitating the preparation of River Rejuvenation Action Plan for regular basis by analysing with complying time lines. The Water quality is monitoried on regular basis by analysing the parameters such as pH, DO, BOD, Faecal coliform and TC. Under the River Rejuvenation programmed, 42 STPs with capacity 413.69 MLD have been proposed and 22 STPs of capacity 298.91 MLD is under construction.

Way Forward

  • The Pollution load should not cross the carrying capacity of rivers. The river rejuvenation programme of 12 polluted river stretches in Karnataka is aimed at improving river water quality so that benefit of life support system of sacred rivers is continuously available for future.

§ 7.6.4Industries Effluent Management

Introduction

The industrial activities are associated with increased levels of pollution. Increased level of Environmental pollution reduces the quality of environmental attributes like air, water, soil fertility etc and diminishes the carrying capacity of natural ecosystem. The healthy ecosystem services are basic needs for a safe living on this earth. Increased level of industrial activity causes increased level of pollution thereby making the people to agitate against industrial ecosystem in their neighbourhood. Any amount of economic benefit cannot compensate the threatened ecological comforts of the people.

Industrial Effluent management in Karnataka

In Karnataka, there are 52,458 industries categorised as green, orange and red category Out of these, 5147 industries are water intensive industries thereby generating trade effluent. All these industries have provided the ETPs to treat the trade effluent and few small and medium size industries have tie-up with Common Effluent Treatment plants (CETPs) that are spread out across various district of Karnataka by following the due procedure. The concept of CETP was introduced in the early 1990s to help Small and Medium size industries. Currently there are 14 Numbers of CETPs established in Karnataka State, out of 14 numbers only 09 are operating. After treating the trade effluent the treated water are being used for on land gardening and for secondary applications viz., boiler feed, cooling and washing.

Table 7.52The List of CETPs operating in Karnataka State are given below:
Name & Address of the CETPDesigned capacity (MLD)
M/s. Eco green Solution Systems (P) Ltd.,48/A-4, KIADB Industrial Area, Doddaballapura Rural District, Bengaluru -561 203100 KLD
M/s. Pai & Pai Chemicals (Unit -1), Plot No. 29/A, 1st Phase, KIADB Industrial Area, Kumbalagodu, Kengeri Hobli, Bengaluru - 560 079.300 KLD
M/s. Pai & Pai Chemicals(I)Pvt Ltd, Unit-II, Plot No. 25-D, 1st Phase, KIADB Industrial Area, Kumbalagodu, Kengeri Hobli, Bengaluru - 560 074.40 KLD
M/s. VIWA Eco-Club CETP, Opp. to Shed No.B-5 & 6, Veerasandra Industrial Estate, Hosur Road, Anekal Taluk, Bengaluru - 560100.20 KLD
CETP at Mangalore Special Economic Zone (MSEZ) Ltd., Phase -1, Permude, Bajpe, Kalavar, Thokur, Tenka Yekkar, Kuthethoor Mangalore ,District: Dakshina Kannada3500 KLD
CETP of Fish Meal And Oil Manufacturers Association, Sea Road, Kotepura, Ullal, Mangalore, Dakshina Kannada600 KLD
CETP of Mother Earth Environ Tech Private Limited, Plot No 158 - 164, KIADB Kadechur Industrial Area, Plot No 158-164, KIADB Kadechur Indl. Area, Kadechur, Yadgir District500 KLD
Innova Agri Bio Park Private Limited Plot No. B-12,, 3rd Phase, KIADB Industrial Area, Malur, Kolar District.600 KLD
M/s. Royal Mysuru CETP Private Limited., Plot No.427-1, Hebbal Industrial Area, Mysuru-570016140 KLD
Survey, p. 317

Strategy for Effective Trade Effluent Management

  • Establishing cluster wise industries like textile, electroplating, pharmaceutical, etc, in a designed area with integrated waste management facilities.
  • Providing “Plug and play System” for ensuring carrying of trade effluent from each industry to the treatment plant.
  • Encouraging establishment of cluster wise CETP at designed industrial area.
  • Creating sufficient buffer around industrial area and also around different categories of industries.
  • Encouraging establishment of industries with circularity i.e waste from one industry can be used as resource/raw material in the other and adopting efficient treated water recycling facility.

Way Forward

In spite there is a need for economic development, it is also necessary to maintain health of ecological services to maintain sustainable development. Even though the ecological parameters viz quality of water, fertility of soil etc. are threatened and there is serious public agitation towards the existence of industries in their backyard, it is necessary to adopt efficient pollution prevention and control system to ensure the quality of ecological parameters in their vicinity. Industries shall not only ensure economic benefit but also ecological benefits to maintain the sustainability for resource conservation and pollution control.

§ 7.6.5Electronic Waste (E-Waste) Management

E-Waste Overview

E-waste refers to discarded electrical and electronic equipment (EEE) no longer in use, including computers, mobiles, appliances, medical devices, batteries, TVs, gaming consoles, solar panels, UPS, and more.

E-Waste (Management) Rules, 2022

Notified by the Ministry of Environment, Forest and Climate Change on November 2, 2022 (GSR 801(E)), these rules took effect April 1, 2023, superseding the 2016 rules. They promote environmentally sound management (ESM) and a circular economy via Extended Producer Responsibility (EPR) [Rule 4(1)].

EPR Entities and Registration

Provides for the following four types of entities namely: a. Manufacturer b. Producer c. Refurbisher d. Recycler All must register on the Central Pollution Control Board (CPCB)’s online portal [Rule 3(1)(s)] at https:// eprewastecpcb.in. Unregistered operations are prohibited, and registered entities cannot deal with unregistered ones.

Manufacturer Responsibilities

1) Register on the portal. 2) Collect and recycle/dispose e-waste from manufacturing. 3) File annual/quarterly returns by the end of the succeeding month/year.

Producer Responsibilities

1) Register on the portal. 2) Implement EPR targets per Schedules III and IV. 3) Proviso: Producers under 2016 rules migrate per CPCB/Steering Committee procedure. 4) Raise awareness via media, ads, posters, etc. 5) File annual/quarterly returns by the end of the succeeding month/year. The CPCB has launched an EPR portal under the E-waste (Management) Rules, 2022, for registering producers, manufacturers, recyclers, and refurbishers.

Extended Producer Responsibility (EPR)

EPR holds producers accountable for their products’ environmental impacts across the lifecycle. Forms include: 1) Mandatory targets with penalties for non-compliance. 2) Required collection and recycling via certificates. EPR targets for each product are set based on producer-submitted data, the product’s CPCB-defined lifespan, and Schedules III & IV of the Rules.

EPR Fulfilment Process

  • Producers must buy EPR certificates online only from registered recyclers and submit them via quarterly returns.
  • Portal cross-checks data from producers and recyclers; the lower figure prevails for EPR compliance.
  • Certificates undergo environmental audits by CPCB or authorized agencies.

EPR Certificate Role

Manufacturers/producers manage product waste by establishing collection centers, ensuring segregation/ recycling, and meeting compliances. EPR certificates drive e-waste recycling/reuse, lowering raw material costs and ensuring environmentally sound management.

E-Waste Management in Karnataka: Embracing Circular Economy Principles

Karnataka, especially Bengaluru as its technology hub, faces substantial e-waste generation. The state proactively adopts circular economy principles to tackle this, emphasizing resource efficiency, waste reduction, and environmental sustainability.

Circular Economy Initiatives

Karnataka promotes a circular economy by designing products for extended use, encouraging reuse and refurbishment, and ensuring material recycling at end-of-life. Manufacturers must register under Extended Producer Responsibility (EPR), mandating management of electronic product disposal. This reduces e-waste’s environmental impact and fosters sustainable production and consumption.

Challenges and Opportunities

Challenges remain, as the informal sector handles 90-95% of e-waste recycling without proper infrastructure or knowledge, posing environmental and health risks. Limited data on Electrical and Electronic Equipment (EEE) market introduction also hinders accurate e-waste generation assessments.

E-Waste Management in Karnataka

Karnataka, with Bengaluru as a major centre for information technology and electronics manufacturing and services, is a significant generator of electronic waste. In accordance with the E-Waste (Management) Rules, 2022, the State has undertaken measures to promote environmentally sound management of e-waste through adoption of circular economy principles, including resource efficiency, waste minimisation, reuse, refurbishment, and recycling of electrical and electronic equipment. Extended Producer Responsibility (EPR) provisions have been implemented to ensure producer accountability for end-of-life management of e-waste. However, a substantial proportion of e-waste handling continues to take place in the informal sector, estimated at approximately 90–95%, which operates largely outside the formal regulatory framework and often without adequate pollution control measures or occupational safety practices. Further, limitations in the availability and reliability of data on electrical and electronic equipment placed on the market pose challenges in accurate assessment of e-waste generation, monitoring of EPR compliance, and planning of infrastructure for e-waste management.

E Waste Units Data

In Karnataka there are 101 Operating E-waste Recycling units (i) 12 dismantling units are operational with a capacity of 22356 TPA (ii) 31 recycler units with a capacity of 23324.4 TPA (iii) 7 dismantling and recyclers units with a capacity of 5400 TPA (iv) 18 refurbisher units of capacity 9957 TPA (v) 6 dismantler, refurbisher & recyclers units with a capacity of 4239.6 TPA (vi) 8 dismantlers and refurbisher units of capacity 7494 TPA and (vi) 23 refurbisher and recycler units with a capacity of 148970.92 MT.

  • The 49 number of E-waste Recyclers in Karnataka have obtained the EPR from the centralized CPCB E-waste Portal during 2025- 26
  • The 32 number of E-waste Refurbishers in Karnataka have obtained the EPR from the centralized CPCB E-waste Portal during 2025- 26
  • The 1059 number of E-waste producers in Karnataka have obtained the EPR from the centralized CPCB E-waste Portal during 2025- 26
  • The 5 number of E-waste Manufactures in Karnataka have obtained the EPR from the centralized CPCB E-waste Portal during 2025- 26

Way Forward

To strengthen e-waste management, Karnataka proposes to focus on formalisation of the recycling sector by integrating informal recyclers into the authorised system through capacity building, training, and certification, thereby ensuring environmentally sound and safe processing of e-waste. Enhanced public awareness initiatives will be undertaken to sensitise consumers on proper e-waste disposal and participation in take-back and recycling mechanisms. Further, the State intends to strengthen policy and enforcement frameworks by drawing upon international best practices, including elements of the European Union’s e-waste management regime. In alignment with the Government of India’s Critical Minerals Mission, Karnataka has also initiated measures to promote recovery of critical and strategic minerals from e-waste through authorised recycling and material recovery processes. Through continued adoption of circular economy principles and targeted interventions to address existing gaps, the State aims to enhance resource security, regulatory compliance, and environmental protection, while contributing to national and global sustainability objectives.

§ 7.6.6Plastic Waste Management in Karnataka: Circular Economy Approach

Plastic goods are essential to everyday life and commerce, manufactured on a vast global scale. Yet, handling plastic refuse poses escalating challenges due to its ecological and social effects. Karnataka, like other areas, is tackling this through creative tactics that prioritize cutting, reusing, and transforming plastic, advancing a viable circular economy.

Current State of Plastic Waste Handling in Karnataka

In 2024-25, Karnataka produced 4,08,537 tonnes of plastic waste. The State boasts 135 licensed recycling facilities with a total approved capacity of 2,31,834 tonnes, indicating notable advances in recycling systems. To combat unlawful plastic usage, the Karnataka State Pollution Control Board (KSPCB), partnering with municipal authorities, executed 18,111 checks/raids in 2024-25. These actions resulted in confiscating 223.09 metric tonnes of plastic and levying fines totalling Rs.63.787 lakh, demonstrating the State’s dedication to regulatory compliance.

Extended Producer Responsibility (EPR) System

Under the EPR framework, producers of plastic products are held accountable for the entire life cycle of their products, including waste management. This incentivizes the design of recyclable products and fosters investments in recycling infrastructure. In Karnataka, the Karnataka State Pollution Control Board has registered 1,336 PIBOs (Producers, Importers, and Brand Owners) & 135 plastic waste processors (PWPs) are registered on the CPCB centralized EPR portal for the period from 2022 to till date.

Table 7.53The details are as follows:
Number of registered PIBOsBrand Owners137
Producers353
Importers846
Number of registered PWPsPlastic waste Processors135
Details of SIMP ApplicationsProducer31
Manufacturer0
Importer0
Seller4
Survey, p. 321

Additionally, 135 plastic waste processors (PWPs) are registered, demonstrating a growing commitment to sustainable plastic waste management.

Table 7.54EPR targets for 2022-23 highlight the focus on managing various plastic categories:
CategoryCat-I (Rigid Plastic) in TPACat-II (Flexible Plastic) in TPACat-III (MLP) in TPACat-IV (Compostable Plastic) in TPASub-Total in TPA
Brand Owner25025.777434728.15654798.90951099.100965651.9443
Importer9176.700232004.32892304.967766.147343552.1441
Producer70258.6903180683.530318519.21142844.8441272306.2761
Total104461.1679247416.015825623.08854010.0923381510.3645
Survey, p. 322

Circular Economy in Plastic Waste Handling

A circular economy stresses prolonging material lifespans via reuse, recycling, and repurposing, curbing reliance on fresh plastic and slashing refuse. It supplants the conventional “extract-produce-discard” pattern with a “closed-loop” strategy, emphasizing recyclable designs and green production methods.

Core elements of the circular economy encompass

  • Recycling and Reuse: Transforming plastic refuse into new items like plastic timber, packaging, and fabrics.
  • Advancement: Creating sustainable substitutes for conventional plastics, including biodegradable or biobased options.
  • Policies and Rules: Implementing Extended Producer Responsibility (EPR) and backing recycled/upcycled goods.

Opportunities in Secondary Plastic Products

The manufacture of value-added products from recycled plastics offers significant environmental and economic advantages. Key application areas include construction materials such as plastic lumber, paver blocks, insulation and composite panels; consumer products including packaging, textiles, and durable reusable alternatives; and industrial applications such as automotive components, furniture, and lifestyle accessories. By promoting innovation, quality standards, and sustainable manufacturing, Karnataka can reduce plastic waste leakage while creating new green enterprises and employment opportunities.

Way Forward

Karnataka proposes to strengthen plastic waste management by promoting the use of secondary plastic products through supportive policy and procurement measures, while reinforcing restrictions on single-use plastics. Efforts will be directed towards expanding recycling and material recovery infrastructure, including through public–private partnerships for advanced recycling technologies. The State will focus on strengthening implementation of Extended Producer Responsibility (EPR) by improving traceability, enforcement, and ease of compliance for Producers, Importers and Brand Owners. Integration of the informal sector through capacity building and linkage with authorised recyclers, along with sustained public awareness initiatives on plastic reduction and source segregation, will be prioritised. Further, research and innovation in up-cycling, biodegradable plastics, and diversified applications of recycled plastics will be encouraged, supported by improved digital monitoring systems for data-driven planning and compliance.