Economic Infrastructure
This chapter does not number its paragraphs. Its figures, tables, appendix tables and boxes have their own addresses, as #chart-…, #table-…, #table-A… and #box-…, and so does each heading.
§ 10.1Power Sector
Power generation in the public sector is managed by the Karnataka Power Corporation Limited (KPCL) whereas the Karnataka Power Transmission Corporation Limited (KPTCL) deals with transmission of power and load despatch functions. As part of the restructuring of the power sector in the State, the erstwhile Karnataka Electricity Board (KEB) was restructured as KPTCL in 1999 by giving it a corporate status. As per the Electricity Act 2003, KPTCL, being the State’s transmission utility, is not empowered to trade in electricity. Therefore, the distribution companies directly procure power from power generators, both public and private and ESCOMs own distribution network, and use KPTCL’s transmission network to distribute electricity.
§ 10.1.1Power Generation
The total installed generation capacity both in the public sector and private sector including the State’s share in the Central Generation Station (CGS) up to December-2025 is 37072.95 MW. The installed capacity in the public sector is 13759.78 MW (including CGS allocation) and the private sector’s share is 23313.17 MW. In the private sector capacity, the percentage share of renewable energy sources of power generation capacity (excluding the Share of IPP Thermal & Mini Hydel) to overall installed capacity is 53.32%. The status of power sector in terms of both installed capacity and electricity generation for Karnataka is provided in Table 10.1.
| Source | Units | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 (Upto Dec.-25) |
|---|---|---|---|---|---|---|
| A. Installed Capacity | ||||||
| 1. Public Sector | ||||||
| a) Hydel | MW | 3,681.00 | 3,681.00 | 3,681.00 | 3,681.00 | 3,681.00 |
| b) Wind energy | MW | 5.00 | 5.00 | 5.00 | 5.00 | 5.00 |
| c) Thermal | MW | 5,020.00 | 5,020.00 | 5,020.00 | 5,020.00 | 5,020.00 |
| d) Gas (YCCP) | MW | 0.00 | 0.00 | 0.00 | 370 | 370 |
| e) Solar PV plant | MW | 34.00 | 34.00 | 34.00 | 34.00 | 34.00 |
| f) Bidadi Waste to energy | MW | - | - | - | - | 11.5 |
| Total | MW | 8,740.00 | 8,740.00 | 8,740.00 | 9,110.00 | 9,121.50 |
| g) Jurala Hydro | MW | 117.00 | 117.00 | 117.00 | 117.00 | 117.00 |
| 2. Private Sector | ||||||
| a) IPP Thermal (including small thermal-conventional) | MW | 2,197.30 | 2,174.20 | 2,194.80 | 2,578.30 | 2606.3 |
| b) Mini Hydel | MW | 903.46 | 903.46 | 907.46 | 940.44 | 940.44 |
| c) Wind energy | MW | 5,144.14 | 5,245.19 | 5,365.54 | 6,655.61 | 7579.46 |
| d) Co-generation & Biomass | MW | 1,870.19 | 1,870.19 | 1,870.19 | 1,881.69 | 1,870.19 |
| e) Solar (including solar roof top) | MW | 7,556.30 | 8,039.86 | 8,522.55 | 9,408.60 | 10316.78 |
| Total | 17,671.39 | 18,232.90 | 18,851.55 | 21,464.64 | 23313.17 | |
| 3. Central Generating Station(CGS) Allocation | MW | 4,865.00 | 4,744.35 | 4,832.82 | 4,480.96 | 4071.28 |
| DVC | MW | 0.00 | 0.00 | 450.00 | 450.00 | 450.00 |
| Total Installed Capacity | 31,393.39 | 31,834.25 | 32,991.36 | 35,622.60 | 37072.95 | |
| B. Electricity Generation (Net) (for 2025-26 Up to DEC-2025) | ||||||
| a) Hydel (KPCL) | MU | 13,582.86 | 13,228.95 | 8,855.604 | 13,836.92 | 12101.8 |
| b) Thermal (KPCL) | MU | 17,143.42 | 16,772.20 | 20,286.707 | 20,366.13 | 13555.41 |
| c) Wind | MU | 9,376.45 | 9,204.08 | 9,628.458 | 9,458.86 | 9127.69 |
| d) Solar PV plant | MU | 9,281.34 | 9,706.51 | 10,848.437 | 10,963.21 | 8681.46 |
| e) Mini Hydel | MU | 2,346.35 | 2,307.20 | 1,315.224 | 2,237.21 | 2415.58 |
| f) Co-gen and Bio-Mass | MU | 2,976.83 | 3,046.45 | 2,801.332 | 2,508.89 | 1390.04 |
| g) Private sector | MU | 2,548.04 | 3,448.43 | 8,444.072 | 9,238.21 | 5553.18 |
| Total | 57,255.29 | 57,713.83 | 62,179.83 | 68,609.43 | 52825.16 | |
| C. Electricity Imports | ||||||
| a) Central projects | MU | 18,241.82 | 22,798.34 | 36,698.019 | 28,853.12 | 18556.118 |
| b) Other States-Short Term | MU | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total | MU | 18,241.82 | 22,798.34 | 36,698.019 | 28,853.12 | 18556.118 |
| Total Electricity supply | MU | 75,497.11 | 80,512.17 | 98,877.852 | 97,462.55 | 71381.276 |
The State has added 1820.53 MW of Generating capacity in renewable energy sources during the FY 2025-26 (up to December-25). Also, during this period un-allocated CGS share has been reduced to an extent of 409.68 MW. The State is also in the forefront in capacity addition in Renewable Energy Sector & there is constant increase in capacity under this category.
Plant Load Factors (Capacity Utilisation)
Plant load factor of thermal power stations have been on the decreasing trend due to increase in generation & utilisation of energy from Renewable Energy sources. Average Plant Load Factors of State-Owned thermal power Stations of KPCL during the 2024-25 was 51% and in 2025-26 (up to Dec-25) it is 45%.
§ 10.1.2Purchase of power from other States and energy exchanges
Towards meeting shortages in electricity supply, Karnataka does power banking with other States and buys through energy exchanges. The details of such purchases during last three years & in 2025-26 (up to Dec-25) are given in Table 10.2 and 10.3.
| Year | Energy in MUs | Amount (Rs. in Crs.) | Average rate Rs/kWh |
|---|---|---|---|
| 2022-23 | 589.14 | 476.61 | 8.09 |
| 2023-24 | 3311.28 | 2526.64 | 7.63 |
| 2024-25 | 3417.42 | 2490.12 | 7.29 |
| 2025-26 (Up to Dec-25) | 3822.11 | 2010.78 | 5.26 |
| Year | Energy in MUs | Amount (Rs. in Crs.) | Average rate Rs/kWh |
|---|---|---|---|
| 2022-23 | 4385.57 | 2531.94 | 5.77 |
| 2023-24 | 674.01 | 274.61 | 4.07 |
| 2024-25 | 3785.25 | 1965.64 | 5.19 |
| 2025-26 (Up to Dec-25) | 1550.26 | 989.31 | 6.38 |
§ 10.1.3Power Transmission: State Transmission Utility
Karnataka Power Transmission Company Ltd. (KPTCL) is the State Transmission Utility engaged in the business of transmission of electricity in the State. It is the responsibility of the KPTCL to construct power stations & lines and strengthen the system for easing network congestion, power evacuation etc. The status of transmission infrastructure as at the end of Dec-2025 is given in Table 10.4.
| Voltage Level (kV) | No. of Stations | Transmission Line in CKmt. |
|---|---|---|
| 400 | 9 | 3935 |
| 220 | 144 | 13904 |
| 110 | 556 | 13569 |
| 66 | 758 | 13393 |
| Total | 1467 | 44801 |
The transmission lines of different voltage classes, new substations and capacity augmentation in the existing substations added during the last 6 years from 2020-21 to 2025-2026 (up to Dec-2025) are shown in Tables 10.5 and 10.6.
(Transmission line length in Ckms)
| Voltage class in kV | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 up to Dec-25 | Total |
|---|---|---|---|---|---|---|---|
| 400 | 2.62 | 0.00 | 234.11 | 0.00 | 0.00 | 0.00 | 236.73 |
| 220 | 579.17 | 434.19 | 375.02 | 261.77 | 517.12 | 128.18 | 2295.45 |
| 110 | 260.96 | 654.58 | 503.89 | 518.77 | 405.02 | 268.63 | 2611.85 |
| 66 | 345.67 | 374.67 | 495.83 | 297.67 | 404.64 | 87.61 | 2006.09 |
| Total | 1188.42 | 1463.44 | 1608.85 | 1078.21 | 1326.78 | 484.42 | 7150.12 |
| Voltage Class (kV) | New Sub-stations added | ||||||
|---|---|---|---|---|---|---|---|
| 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 up to Dec-25 | Total | |
| 400 | 2 | - | 1 | - | - | - | 3 |
| 220 | 6 | 10 | 7 | 2 | 4 | 7 | 36 |
| 110 | 12 | 21 | 20 | 32 | 26 | 13 | 124 |
| 66 | 16 | 10 | 13 | 11 | 23 | 10 | 83 |
| TOTAL | 36 | 41 | 41 | 45 | 53 | 30 | 246 |
| Voltage Class (kV) | Sub-stations capacity augmented | ||||||
| 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 up to Dec-25 | Total | |
| 400 | - | - | 1 | - | - | - | 1 |
| 220 | 5 | 7 | 12 | 5 | 1 | 2 | 32 |
| 110 | 38 | 58 | 78 | 69 | 47 | 11 | 301 |
| 66 | 76 | 107 | 106 | 73 | 43 | 19 | 424 |
| TOTAL | 119 | 172 | 197 | 147 | 91 | 32 | 758 |
Transmission & Distribution Losses: (T&D Losses)
The State has taken various measures to reduce T&D and AT&C losses.
- Establishment of new Substations and Transmission Lines.
- Augmentation of Existing Sub Station & Replacement of age-old conductors.
- Bifurcation of lengthy High Tension/Low Tension (HT / LT) lines& overloaded 11kVfeeders.
- Re-conductoringof HT/LT lines and reduction of HT/LT ratio.
- Providing additional transformers to release over loaded DTCs.
- 100% Metering and Accuracy in Billing.
- Load balancing and bifurcation of load.
- Strengthening of Vigilance/MT Activities.
- Replacing Electro Mechanical meters by Static/energy meter.
- Encouraging consumers to install energy efficient equipment’s.
Measures taken for reduction of AT&C Loss
- Accuracy and 100% billing of consumer installations.
- 100% collection efficiency.
- Improving vigilance activities.
- Periodical rating of HT & LT Installations.
Transmissin & Distrbution Losses : (T&D Losses)
The State has taken various measures to reduce T&D and AT&C losses. The transmission loss for the year 2024-2 is 2.95%. T&D losses of Karnataka’s power sector has been brought down from 15.73% in 2019-20to 12.57% in 2024-25 (Figure 10.1). The utilities in the sector are making planned investment for strengthening and augmenting the netowrk for reduction of technical loss. Figure 10.1 also shows the trends in Aggregate Technical & Commercial (AT&C) losses during 2019-20 to 2024-25. The AT&C Loss which was 15.32% in 2019-20 has been brought down for 10.89% in 2024-25.
- AT& C Loss
- T & D Loss
AT&C is aggregate technical and commercial loss and T&D is transmission and distribution loss, both in per cent.
The numbers
| AT& C Loss | T & D Loss | |
|---|---|---|
| 2019-20 | 15.32 | 15.73 |
| 2020-21 | 16.99 | 14.59 |
| 2021-22 | 12.15 | 16.34 |
| 2022-23 | 14.75 | 14.11 |
| 2023-24 | 11.92 | 15.78 |
| 2024-25 | 10.89 | 12.57 |
Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.
§ 10.1.4Electricity, Demand and Supply Status
The State of Karnataka has achieved near self-sufficiency in power generation to meet the growing demand. The occasional gap due to seasonal variation in demand and supply is met through short term purchases. Trends in peak demand for power and peak energy supply per day during the years 2020-21 to 2025-26 (Upto Dec-2025) are given in Figure 10.2. It may be observed that both the peak demand and peak energy supply per day are showing increasing trend. The peak demand met during 2024-25 was 18395MW and that in 2025-26 (Upto Dec-25) was 17336MW. The anticipated peak demand to be met during 2025-26 is around 18986MW. Figures 10.3 and 10.4 show the trends in estimated gaps in demand and supply for both power and energy. There is no power supply shortage since last 7 years.
- Peak Energy Supply (in MU) (right scale)
- Peak Power Demand (in MW)
The bars are read against the right hand axis and the line against the left. Peak energy supply is the highest energy supplied in a single day.
The numbers
| Peak Energy Supply (in MU) (right) | Peak Power Demand (in MW) | |
|---|---|---|
| 2020-21 | 275 | 14,367 |
| 2021-22 | 285 | 14,818 |
| 2022-23 | 301 | 15,828 |
| 2023-24 | 309 | 17,220 |
| 2024-25 | 357 | 18,395 |
| 2025-26 (upto Dec-25) | 336 | 17,336 |
Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.
§ 10.1.5Vigilance efforts
The vigilance efforts by various authorities of the ESCOMs in reducing theft and pilferages over the years have contributed to the reduction in AT&C losses (Table 10.7). The data suggests that authorities have been actively increasing vigilance efforts, leading to the detection of more cases and imposition of penalties, which may serve as a deterrent against theft and pilferages in the electricity sector.
| Year | No of Installations Inspected | No. of Cases Detected | Penalty Imposed (Rs. in Crs) |
|---|---|---|---|
| 2019-20 | 6,23,036 | 65,154 | 926.75 |
| 2020-21 | 2,43,746 | 14,546 | 63.02 |
| 2021-22 | 2,63,915 | 12,090 | 57.54 |
| 2022-23 | 8,41,784 | 82,375 | 451.81 |
| 2023-24 | 13,67,879 | 99,770 | 309.76 |
| 2024-25 | 10,27,376 | 72,843 | 200.76 |
| 2025-26 (Up to Dec) | 8,38,921 | 54,855 | 141.31 |
§ 10.1.6Electricity Sales
The ESCOMs supply electricity to various category of consumers at different price slabs. Details of revenue realized from the different categories of consumers are given in Table 10.8. This shows that during the year 2024-25, the LT category consumers while accounting for about 75.75% of the electricity consumption, contributes 71.37% to the ESCOMs total revenue and the HT category consumers while accounting for about 24.25% of the electricity consumption, contributes 28.63% to the ESCOMs total revenue.
| Category wise Consumption, Sales, Revenue and ARR | ||||||||
|---|---|---|---|---|---|---|---|---|
| Category of Consumers | Consumption (MU) | % of Sales | Revenue (Rs. in Crs) | ARR Rs/Kwh | ||||
| 2024-25 | 2025-26 (Upto DEC-25) | 2024-25 | 2025-26 (Upto DEC-25) | 2024-25 | 2025-26 (Upto DEC-25) | 2024-25 | 2025-26 (Upto DEC-25) | |
| LT Consumers | 57591.04 | 42820.54 | 75.75% | 75.49% | 48308.22 | 38992.94 | 8.39 | 9.11 |
| HT Consumers | 18432.94 | 13903.52 | 24.25% | 24.51% | 19382.35 | 13956.83 | 10.52 | 10.04 |
| Total Consumers | 76023.98 | 56724.06 | 100.00% | 100.00% | 67690.56 | 53038.30 | 8.90 | 9.35 |
Details of Energy Sales, Average Tariff and Average Cost of power supplied by ESCOMs are given in Table 10.9.
| ESCOMs | Energy Sales (MU) | Average Tariff (Rs/Unit) | Average Cost (Rs/Unit) | |||
|---|---|---|---|---|---|---|
| 2024-25 | 2025-26 | 2024-25 | 2025-26 | 2024-25 | 2025-26 | |
| Actual | Estimated | Actual | Estimated | Actual | Estimated | |
| BESCOM | 37,122.46 | 38,206.95 | 8.84 | 8.92 | 10.32 | 8.99 |
| MESCOM | 6,654.73 | 6,868.75 | 9.38 | 9.16 | 9.44 | 7.41 |
| HESCOM | 14,431.47 | 14,585.24 | 8.48 | 8.65 | 9.74 | 6.11 |
| GESCOM | 8,986.82 | 9,305.83 | 9.01 | 8.87 | 9.56 | 9.40 |
| CESC | 8,447.42 | 8,906.88 | 9.41 | 9.44 | 10.28 | 1.36 |
| Hukkeri | 381.07 | 399.12 | 8.57 | 8.12 | 9.43 | 8.17 |
| Total | 76,023.97 | 78,272.77 | 8.90 | 8.94 | 10.03 | 7.49 |
| Name of the Company | Profit/Loss | Cumulative Profit/Loss |
|---|---|---|
| BESCOM | -5476.14 | -13819.54 |
| MESCOM | -96.35 | -37.16 |
| HESCOM | -1499.72 | -11398.01 |
| GESCOM | -766.49 | -5660.87 |
| CESCOM | -1031.15 | -4063.83 |
| Total | -8869.85 | -34979.41 |
§ 10.1.7Subsidy in power sector
There are a total number of 35.67 lakhs Irrigation Pump sets upto 10 HP in the State as of December-2025. The power supply to IP sets (Upto 10 HP) has been made free with effect from 01.08.2008. The entire cost of supply of free power to agricultural sector (IP set upto 10 HP connected load) has been made good by the State Government through subsidy.
GruhaJyothi Subsidy
Out of the 5 guarantees announced by the Government, the most important guarantee “GruhaJyothi” scheme has been implemented by Energy Department from 01.07.2023. Under this scheme, every household in the State is provided free electricity supply every month subject to a maximum consumption limit of 200 units per month. Out of 1.75 Cr registered consumers, presently 1.66 Cr consumers are getting benefit in this scheme. The earlier schemes such as “Bhagyajyothi and “Kuteerajyothi” and “Amruthajyothi” schemes have been subsumed in this GruhaJyothi Scheme. The subsidy given under Gruha Jyothi scheme from 01.07.2023 to 31.12.2025 is Rs. 22,040.00 Crore. The subsidy provided by the State Government from 2021-22 to 2025-26 ( upto December-2025) is provided in Table 10.11.
| Year | Subsidy released (Rs. in Cr.) | Remarks |
|---|---|---|
| 2021-22 | 19,509.24 | Includes IP subsidy Rs.11,376 Cr, Previous IP subsidy arrears of Rs.5,500.00 Crs, Covid relief subsidy of Rs.68.93 Cr & Tax adjustment of Rs.2564.31 Cr. |
| 2022-23 | 14,092.61 | Includes IP subsidy Rs.12,000 Cr, FAC subsidy of Rs.400.02 Crs, Covid relief subsidy of Rs.92.59 Cr& Previous IP Subsidy arears of Rs.1,600 Cr. |
| 2023-24 | 23,780.00 | Includes IP subsidy Rs.16,213 Cr, GruhaJyothi subsidy of Rs.5,830 Cr & Subsidy Tax Adjustment Rs.1.737 Cr. |
| 2024-25 | 30,701.29 | Includes IP subsidy Rs.13,285.04 Cr, GruhaJyothi subsidy of Rs.9157.66 Cr, Tax adjustment Rs.4,258.59 Cr andFinancial Assistance of Rs.4,000 Crs. (IP subsidy arrears) |
| 2025-26 (Upto Dec-2025) | 19,071.16 | Includes IP Subsidy Rs.12,013.60 & GruhaJyothi subsidy Rs.7,057.56 Cr. |
§ 10.1.8Demand Side Management (DSM)
Energy Efficiency and Energy Conservation endeavour is critical for meeting India’s Nationally Determined Contribution in the emission intensity of its GDP by 33% - 35% by 2030 from 2005 level. The Government of Karnataka has implemented several programmes to conserve energy as part of its DSM initiatives. Some of the important programmes are: 1. Time of Day Tariff Metering is mandatory for industrial consumers and especially for HT consumers having sanction load of 500 kVA and above. 2. Installing Energy efficient street lighting systems and Electronic Time Switches for street light installations for switching “ON” and “OFF”. 3. Adoption of High Voltage Distribution System (HVDS) for agricultural loads in rural areas. 4. Encouraging domestic consumers to use solar water heaters. 5. Mandatory use of solar water heating systems for all residential buildings with built-up area of 600 Sq. feet and above constructed on sites measuring 1200 Sq. feet and above falling within the limits of Municipalities / Corporations and Bangalore Development Authority sectors. 6. Mandatory use of LED bulb/tube lights in Government buildings/Aided institutions/ Boards /Corporations. 7. Mandatory use of star rated energy efficient irrigation pump sets conforming to standards prescribed by the Bureau of Energy Efficiency (BEE). 8. Promotion of energy efficient building designs. 9. Implementation of PM-Surya Ghar Muft Bijli Yojana. 10. Implementation of Off grid solar pumps under KUSUM-B and feeder level solarization under KUSUM-C. 11. VidhyuthJagruthiYojana, an awareness programme on DSM activities for students. 12. Deployment of Electric Vehicle Charging Stations to promote Electric Vehicles.
§ 10.1.9Investment in Power Sector: Planned by KPCL, KPTCL & ESCOMs during 2025-26
The Plan Outlay and expenditure incurred during the last Five years and during 2025-26 (up to December 2025) are given at Table 10.12.
| Year | Capital Outlay /Expenditure for Power Projects (Internal Resource, Equity & Borrowings) | ||||
|---|---|---|---|---|---|
| Plan Outlay | Expenditure | ||||
| Internal Resources | Borrowings | Equity | Total | ||
| 2020-21 | 9865.18 | 3548.15 | 3302.78 | 652.21 | 7503.14 |
| 2021-22 | 10594.40 | 3964.70 | 5081.11 | 163.92 | 9209.73 |
| 2022-23 | 11178.90 | 3786.92 | 4755.45 | 750.46 | 9292.83 |
| 2023-24 | 10769.12 | 2706.76 | 4428.53 | 450.87 | 7586.16 |
| 2024-25 | 11019.86 | 3085.18 | 6404.05 | 583.41 | 10072.64 |
| 2025-26 (Upto Dec-25) | 12782.04 | 1765.67 | 3624.27 | 372.69 | 5762.63 |
§ 10.1.10Rural Electrification
Towards meeting the targets stipulated by the National Electricity Policy (NEP), the State Government has planned initiatives for energisation of Villages, Hamlets, HarijanBastis and Thandas. All the villages of Karnataka have been electrified. The ESCOMs have planned to energise hamlets and thandas in a phased manner. The details of electrification status in hamlets, Harijanbastis, thandas and IP sets during the last 5 years and in the current financial year are provided in Table 10.13.
| Year | Irrigation Pump sets Energised (in lakhs) | Hamlets/Harijan Bastis Thandas Electrified (No.) |
|---|---|---|
| 2020-21 | 31.47 | 11 |
| 2021-22 | 32.52 | 9 |
| 2022-23 | 33.56 | 4 |
| 2023-24 | 34.17 | 30 |
| 2024-25 | 34.77 | 181 |
| FY 2025-26 (up to Dec-2025) | 35.65 | 35 |
During the year 2024-25 and FY 2025-26 (up to Dec-2025), 169 hamlets are covered under PM JANMAN and DA JGUA, 47 number of hamlets in SCSP / TSP schemes and electrification byMahatma Gandhi Institute of Rural Energy and Development (MGIRED). These habitations were previously electrified; however, to provide electricity connections to newly identified households, these partially electrified hamlets have been taken up under the above schemes for complete electrification.
10.1.11: Karnataka Renewable Energy Development Limited (KREDL)
KREDL is the nodal agency for the development of renewable energy sources in Karnataka. To harness green and clean renewable energy sources in the State for environmental benefits and energy security and to initiate energy conservation & efficiency measures in all the sectors for sustainable development, the Government of Karnataka notified a policy on renewable energy (for the period 2009-14) in 2010, Solar Policy 2014-21 in 2014 & Karnataka Renewable Energy Policy 2022-27 in 2022.
Karnataka Renewable Energy Policy 2022-27
State notified Karnataka Renewable Energy Policy 2022-27 to facilitate Government of India in meeting the Renewable Energy target of 500 GW by 2030 and to promote new initiatives and emerging energy technologies in the State and to continue Karnataka State’s position as a preferred investment destination in the Renewable Energy sector and create an ecosystem for sustainable and green energy development in the State. KREDL, the nodal agency envisages private sector investment for renewable energy development in the State. The capacity addition under renewable energy during 2024-25 was 1209.19 MW and it is 1762.64 MW during 2025-26 (upto Dec–25) (as shown in Table 10.14).
| Sources | Capacity addition (in MW) | 2024-25 | 2025-26 | |||
|---|---|---|---|---|---|---|
| 2021-22 | 2022-23 | 2023-24 | (Upto Dec-2025) | |||
| Wind Power | 181.80 | 101.05 | 1250.64 | 327.275 | 499.75 | |
| Small/Mini Hydro | 0 | 0 | 36.98 | 0 | 0 | |
| Solar (including solar roof top & KUSUM C) | 201.29 | 483.56 | 667.65 | 827.21 | 780.08 | |
| Hybrid | Wind | 0 | 0 | 3.75 | 29.70 | 232.2 |
| Solar | 0 | 0 | 1.25 | 13.50 | 250.6 | |
| Waste to Energy | 0 | 0 | 0 | 11.50 | 0 | |
| Total | 383.09 | 584.61 | 1960.27 | 1209.185 | 1762.63 |
The Total capacity addition under renewable energy during 2024-25 and 2025-26 (upto Dec–25) is 2971.81 MW. The cumulative progress in installed capacity additions in the renewable energy sector in the State as on 31.12.2025 is shown in Table 10.15. Solar energy (including Solar Rooftop and KUSUM C) accounts for major share in the installed capacity.
| Sources | Potential Available | Allotet d Capacity | Installed Capacity | |
|---|---|---|---|---|
| Wind Power | 124139 | 39344.98 | 7322.86 | |
| Small/Mini Hydro | 3100 | 3198.13 | 940.44 | |
| Co-Generation | 2000 | 2212.65 | 1731.16 | |
| Solar (including solar roof top & KUSUM C) | 721798 | 24953.71 | 10319.72 | |
| Hybrid | Wind | - | 1769.45 | 301.95 |
| Solar | - | 2154.07 | 290.35 | |
| Biomass | 1000 | 395.13 | 139.03 | |
| Waste to Energy | 135 | 59 | 11.5 | |
| Total | 852172 | 74087.11 | 21057.01 |
§ 10.1.12New Initiatives
Initiative taken up in 2025-26
- For speedy energisation of IP sets, “New SheegraSamparka Scheme” has been introduced from 15.4.2025, in which LT/HT line extension is to be done by the consumer and transformer is provided by the ESCOMs on need basis or power supply is arranged from the existing transformer depending on the technical feasibility.
- Providing solar water pumps to beneficiaries under KUSUM Component-B through KREDL.
- Solarisation of Agriculture feeders under PM KUSUM-C.
- Upgradation of Distribution Automation System in all Corporation areas.
- The HVDS implemented on pilot basis, will be continued in other sub-division of ESCOMs after detailed study of the scheme.
- Smart Meters are being implemented for new and temporary installations.
- Implementation of Green Energy Corridor scheme with the assistance of KPTCL and MNRE.
- Battery Energy Storage Systems are being implemented to store energy generated during RE periods and to utilize that during Non-RE period.
- Augmenting Transmission Capacity to future growth and evacuation.
§ 10.1.13Centrally Sponsored Scheme
1. Atal Bhujal Yojana
Atal Bhujal Yojana is a program of GoI to improve the management of groundwater resources in the water stressed areas of the State. The Scheme has been launched in Dec 2019. Dept of Minor Irrigation and Ground Water Development (MI & GWD), GoK is implementing the scheme in 1,199 water stressed Gram Panchayats of the State with a budget of Rs.1,201 Cr. Funding of Rs.10.50 Cr. is sanctioned to Energy Department for Segregation of 17 feeders by creating 10 new feeders in BESCOM. All the 10 number of feeders are completed by the end of May 2025. Grant amount of Rs.5.70 Crs has been released till Dec 2025.
2. Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM-JANMAN)
GoI has launched the PM-JANMAN scheme in Nov-2023. The scheme aims to provide basic infrastructure for the comprehensive development of Particularly Vulnerable Tribal Groups (PVTG). DPR for an amount of Rs.4.6 Cr. has been sanctioned to electrify 1,794 PVTG households in 5 districts (Dakshina Kannada, Udupi, Mysore, Chamarajanagar & Kodagu) in the state. All 1,725 feasible households are completed by the end of Mar 2025. Remaining households could not be taken up due to migration, court case, kutcha houses. Grant amount of Rs.1.74 Crs. has been released till Dec 2025
3. Dharti Aaba – Janjatiya Gram Utkarsh Abhiyan (DA-JGUA)
Ministry of Tribal affairs (MoTA), GoI is implementing the scheme.The scheme aims at improving the socioeconomic conditions of tribal communities by providing basic facilities to 1,089 tribal majority villages in the State. The scheme was launched by GoIin Oct 2024. The scheme period is from 2024-25 to 2028-29. Energy Department facilitates electrification of Tribal HHs. DPR for an amount of Rs. 40.41 Crs has been sanctioned for electrification of 5,288 HHs in 186 habitations in BESCOM, CESC and GESCOM jurisdiction in 6 districts (Chitradurga, Tumkur, Mysore, Chamarajanagar, Kodagu and Raichur). 1052 no of HHs have been electrified as on Dec 2025 and the remaining households are in progress. Grant amount of Rs.4.23 Crs has been released till Dec 2025.
§ 10.1.14Challenges
Specific challenges and the future outlook of the department
- Optimum utilisation of natural resources under renewable energy sector.
- Generation Capacity addition to meet the growing demand for achieving self-sufficiency.
- Reduction of Transmission & Distribution Loss.
- Reduction of Aggregate Technical & Commercial Loss.
- Making Power Supply Consumer friendly.
- Reduction of Electrical Accidents.
§ 10.1.15Outcome
- The State Government has published its Solar Policy for 2022-2027 for giving impetus to exploitation of solar energy. The State Govt is able to harness renewable energy sources and save natural resources like coal.
- Some of the energy conservation programs like demand side management (DSM) and smart grid pilot project have resulted in saving energy.
§ 10.1.16Achievements of Energy Sector during 2025-26
- Considering the demand for electricity during the summer season, and to meet long term energy needs of the State, the following measures have been taken to ensure adequate supply of electricity to all categories of consumers.
- The State recorded highest peak demand of 18395 MW on March 7, 2025 and the highest daily energy consumption of 356.88 MU on March 19, 2025. PCKL has procured 3417 MUs in FY2024-25 through exchanges to meet the increased demand in the State of Karnataka.
- The state experienced a power surplus due to a good monsoon, and the surplus quantum of 3785 MU was traded on Energy Exchanges during the monsoon months, i.e. June 2024 to October 2024.
- The banking/swapping arrangement of power has continued for the fiscal year 2024-25 with PSPCL and UPPCL to an extent of 1400 MUs were availed to meet the State demand.
- Based on the GoK request, Coal India Limited (CIL) has allocated Grade-13 coal equivalent to 2000 MW to Karnataka State under the recommendation from SLC (LT) for earmarking of coal under Para B (iv) of SHAKTI policy vide letter dated 02.08.2024 with 2 years timeline for utilization of earmarked coal. PCKL invited Tender for “Procurement of 2000 MW of power under long term on Design, Build, Finance, Own and Operate (DBFOO) basis using SHAKTI coal allocation by Coal India Limited (CIL)”. Tender has been finalised. KERC approval has been obtained for adoption of tariff under Section 63 of Electricity Act 2003. PPA has been entered with all nine successful bidders.
- In accordance with the guidelines of Ministry of Power, GoI, PCKL has prepared Resource Adequacy Plan (RAP) of the State for the period upto 2034-35.
- PCKL has facilitated the execution of PPAs with NHPC and DVC for about 704 MW.
- KPCL is implementing 1600MW pithead coal based Godhna Thermal Power plant in Chhattisgarh State at an estimated cost of Rs.19,200 Crores. Initial Power Purchase Agreement was executed with ESCOM’s of Karnataka on 18.12.2010. Tender activities for selection of JV partner (TBCB mode) is completed and the process of obtaining approval is in progress.
- MoU has been signed between KPCL and THDCIL for implementation of Ground mounted solar PV plants at RTPS, BTPS & YTPS with a total capacity of 100MW and at an estimated cost of Rs.414.95Crores. Tender activities are under progress.
- On 27.06.2025, KPCL has issued LoA for implementation of 20MW Bidadi Solar Power Plant for an amount of Rs.97.43Crores. Project is expected to be commissioned by October, 2026.
- Approval has been accorded to systematically connect irrigation pump sets to the distribution network in the State, through implementation of stand-alone/off grid-Solar pump sets and solarisation of IP Feeders to supply electricity to farmers’ pump sets during day time.
- The Ministry of New and Renewable Energy (MNRE) has sanctioned 40,000 standalone solar pumps under KUSUM-B scheme to expedite the Implementation. 1,04,060 applications have been registered under the scheme and 1353 pumps have been installed as on 31.12.2025
- In order to ensure day time power supply to Irrigation pump sets of farmers and to enhance their quality of life, solarisation of IP feeders is being undertaken under PM KUSUM-C scheme. The projects with capacity of 2777MW are taken up of which 246 MW Capacity Solar Plants have been Commissioned as on 31.12.2025 and 2531MW Capacity Solar plant projects are in progress at various stages.
- As on 31.12.2025, 15102 number of SRTPV has been installed by the Domestic consumers under PM Surya scheme.
- Under Ganga Kalyana Scheme, 13849 IP sets were energised.
- Transmission - To facilitate network strengthening and seamless transmission of power, 24 new stations, 405.05 Circuit Kilometres of transmission lines and augmentation of 21 existing substations have been completed.
- Awards and Recognitions –
- At the Global Wind Day 2025 event, MNRE conferred the first prize to the State of Karnataka for achieving the highest installed wind power capacity during 2024-25.
- The Pavagada Solar Park in Karnataka has received a total of four awards from the Union Ministry of New and Renewable Energy (MNRE) at the Global Renewable Energy Investor’s Meet and Expo (RE-Invest) held in Gujarat on 16.09.2024, namely the second largest solar park in the country, the third highest performing state in wind power capacity, the second highest performing state in small hydro power capacity and the third highest performing state in solar power capacity.
- Karnataka also received a national-level award for ‘Highest Wind Power Capacity Under Implementation for 2024-25, in addition to being recognized for the highest wind power generation at the 7th edition of Windergy India 2025 held on 02.11.2025 at the Trade Centre, Chennai.
§ 10.1.17Way Forward
Different strategies are framed in various Policies-Karnataka State Renewable Energy Policy, Energy Efficiency and Energy Conservation Policy for Affordable and Clean Energy for all.
- Karnataka Power Transmission Corporation Limited (KPTCL) is identified as the nodal agency to plan and monitor the SDG-7. There is need to prepare periodic plans for all ESCOMs, to implementtheir distribution infrastructure in a coordinated manner, as grid modernization and up-rating of the distribution network for the absorption of power will involve significant capital infusion.
- There is a need to rectify the balance sheet of state power utilities by rate-design reforms, plugging revenue leakage, squaring cumulative losses, and issuance of bonds. Additionally, quality-rated distribution transformers are required to reduce the length to ensure optimum efficiency.
- There is need to promote Utility business model to transform from generation sales to mediator for sales for sustenance in the long-term. This would keep the consumers connected to the distribution networks to transact their surplus energy.
- Timely formulation and implementation of action plans.
- Re-assessment of cross-subsidies by cost-effective tariffs and regulatory innovations for electricity to evolve from a public utility model to a product/commodity model.
- Need for application of IT solutions such as SCADA to augment collection and collation of data and reduce manual interventions to ensure maximum uninterrupted power supply.
- Change management programmes of local power distribution as well as reactivation of the franchisee system to be promoted by involving local youths under Skill India Mission.
- There is need to regulate farm power by limiting the number of wells per unit area and checking misuse of subsidy. Also, going forward, there is need for increasing testing labs for solar panels as well as innovation labs such as YESSCALE (aggro tech, clean tech and smart cities) as alternate source of energy.
- Companies need to promote initiatives like internet of things block chain, machine learning, mobile intelligence, mini-grids and micro grids in future.
- To ensure sustainable up take of these technological innovations, there is a need for coherence between institutions and technological processes to ensure satisfactory functioning of electricity infrastructure.
- Network strengthening and using efficient irrigation pump sets. Convergence of State’s Ganga Kalyana scheme with the Central Government’s KUSUM scheme in feasible areas, which will help in promoting solar energy and reduce subsidy burden.
§ 10.2Roads, Transport, Infrastructure and Communications
§ 10.2.1Roads
The road network in the state comprises of National Highways, State Highways, District Major Roads, Municipal Roads, Other District Roads and Village Connecting Roads. Road development in the State is carried out by various departments/agencies of the State government such as Public Works Department, rural and urban local bodies. The details of Karnataka Road length is given in Table 10.16 and details of the roads and lanes are given in Table 10.16a. An amount of Rs. 11677.19 crores is allocated to the Public Works Department for the development of roads and construction and maintenance of buildings for 2025-26 of which an amount of Rs.6384.41 crores is released upto 15th January 2026. The expenditure incurred is Rs.5950.29 crores (Avalokana).
| Category | Length in 2024-25 (km) | Length in 2025-26 (km) |
|---|---|---|
| National Highways | 7652 | 7652 |
| State Highways | 27983 | 28152 |
| Major District Roads | 55818 | 55413 |
| Municipal roads* | 44852 | 44852 |
| Rural roads | 198496 | 198496 |
| Total | 334801 | 334565 |
| Category | Length in km | Surface details | Lane details | |||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Asphalt | CC | Metal | Earthen | Single | Intermediate | Two | Four | Six | ||
| National Highways | 7652 | 7652 | 0 | 0 | 0 | 121 | 1333 | 3930 | 2022 | 246 |
| State Highways | 28152 | 26629 | 1371 | 50 | 102 | 5037 | 13624 | 8671 | 820 | 0 |
| Major District Roads | 55413 | 50604 | 2006 | 1524 | 1279 | 41272 | 12825 | 1157 | 159 | 0 |
| Total | 91217 | 84885 | 3377 | 1574 | 1381 | 46430 | 27782 | 13758 | 3001 | 246 |
State Highway Development Plan – SHDP
Under the State Highway Development Plan, the development of state highways and the development of major district roads with the highest vehicle density are being implemented effectively. Under this plan, implementation of the project in total 5 phases have been undertaken. Under SHDP-IV, Stage-1, Rs. 4517 crore has been allocated of which an amount of Rs.4786 crores has been spent for the development of 3460 kms of road. 03 packages are under progress. Under SHDP-IV, Stage-2, an amount of Rs. 3499 crore has been allocated of which an amount of Rs. 3891 crores has been spent for the development of 2249 kms. 19 packages are under progress, Under SHDP-V, Stage-1, an amount of Rs. 4000 crore has been allocated of which an amount of Rs. 527.11 crores has been spent for the development of 820 kms. Out of 218 Packages, 43 Package works completed, balance various stage work in progress as on December 2025. Karnataka Road Development Corporation (KRDCL) Works: A total of 220 bridges amounting to Rs. 2210.21 crore (Revised) in 15 packages and 17 other bridges totalling to 237 bridges are being constructed across the state on turnkey basis of which 197 bridges have been completed and the remaining bridges are in various stages of progress. An amount of Rs. 1838.79 crore has been spent upto the end of December-2025. Roads around Bengaluru: In order to decongest the traffic in Bengaluru it is planned to develop roads around Bengaluru city. It includes ROB/RUB and grade separator. A total of 155 km length of long road is being constructed in 10 packages at a cost of Rs. 3501 crore (Revised), of which 123 kms road work has been completed and an amount of Rs. 1563.36 crore has been spent by the end of December 2025. Hybrid Annuity model (HAM): Under the Hybrid Annuity Model, the Raichur-Sindhanur road is being developed at a cost of Rs. 3565 crore for development of 77 kms of road, of which 50 Km of Road completed. An amount of Rs. 427 crore has been spent to the end of December-2025, and the work is in progress. The Government in its order dated:08-11-2024 has accorded Administrative Approval to take up the work of “Development of Road from Devanahalli-Vijayapura-H.Cross-Vemagal-Malur-T.N. border including Malur- Hoskote road on Hybrid Annuity Mode (HAM)” for a length of 110.10 km at a project cost of Rs.3190 Cr in three packages viz., Pacakge-01-Vemagal-Malur & Malur Industrial Area upto T.N Border at an estimated cost Rs.958 Cr and Package-2: Hoskote to Malur including Elevated Corridor upto Malur Industrial Area at an estimated cost Rs.1054 Cr are approved to take up for implementation from KSHIP. Package-3: Devanahalli- Vemagal-Kolar (From 0.000 km to 49.284 km) of SH-96 (Design Length of 48.20 km) in the State of Karnataka on PPP-DBFOMT-HAM) at an estimated cost of Rs.1178 Cr is approved to take up by KRDCL. Tender process is in progress.
Karnataka State Highway Development Project
- YUnder KSHIP-III(2017-2024): Loan of 346 Million US dollars has been received from the Asian Development Bank for the development of 418 km of state highways. This project is being implemented in 3 packages. All the 3 packages are in progress, and by the end of December-2025, 102.93km length of DBM(Dense Bituminous Macadam) in Package-1, 152.46km length of DBM in Package-2 and 135.42 km in Package-3 have been completed and an Expenditure of Rs.3862.05 Crore is incurred.
- YUnder KSHIP-IV scheme : Proposal has been submitted to the Government of India for approval to develop 875 km of highways under State’s road network concept ( EPC&HAM )at a cost of Rs. 5736 crores. (ADB Loan Rs. 3115 Crore). DPR preparation for 11 road works to taken up for Road length of 915Km.
NABARD RIDF scheme: Under this scheme, improvement of Rural Roads, major District Roads and construction of bridges will be constructed to facilitate the movement of agricultural products to the nearest marketing centers, to ensure last mile connectivity and for the development of infrastructure in rural areas. In total, improvement of 30658 km of rural roads and construction of 1391 bridges have been completed under NABARD assistance. Tranches up to RIDF-24 have been completed. RIDF NABARD 27 (2021-22): Construction of 23 major and minor bridges at an estimated cost of Rs. 143 crore has taken up, of which Rs. 141 crore has been spent and 19 bridges have been completed and remaining 4 works are in progress. RIDF NABARD 28 (2022-23): Administrative approval has been accorded for improvement of 73 road works for a length of 335 km at an estimated cost of Rs. 326 crores, of which 71 works have been completed and 2 works are in progress. A total of 325 km of roads have been developed and an amount of Rs.299 crores has been spent. (Up to end of December 2025). RIDF NABARD 30 (2024-25): Administrative approval has been accorded for improvement of 58 road works for a length of 284 km at an estimated cost of Rs. 330.47crores, of which 39 works have been completed and 17 works are in progress. A total of 179 km of roads have been developed and an amount of Rs.204 crores has been spent. (upto end of December 2025). RIDF NABARD 31 (2025-26): Administrative approval has been accorded on date: 31/12/2025 for Construction of 03 Bridges at an estimated cost of Rs.312.71 crores, 1 bridge work is in progress, 2 bridges are in tender process.
National Highways
The development and maintenance of National Highways are being carried out by the National Highways Authority of India and the National Highways Zones of Public Works Department. Under the CIRF scheme, With respect to National Highway Zone Bengaluru (South) & Belgavi (North) The Ministry of Road Transport and Highways, New Delhi has sanctioned 297 works costing Rs.1385.60 Crores for improvement of State Highways to a length of 2061.33Kms under the Central Road Fund Scheme. Accordingly, the State Government has accorded, administrative approval for the same. Further, Zonal offices have accorded technical sanction to 297 works for improvement to a length of 1537.93 kms. Accordingly, in the implemented works, a physical progress of 1240.31 kms has been achieved to the end of the 2nd quarter for this financial year 2025 at a financial cost of Rs.433.65 crores. And by the end of the 3rd quarter a physical progress of 1379.95 kms has been achieved at a financial cost of Rs. 838.31 crores. Central Road Fund Scheme-Setu Bhandan: The State Government has accorded Administrative approval to 6 ROB’s. Out of this, 5 ROB’s works pertains to south zone and 1 ROB pertains to north zone. Out of 5 south zone works, 3 ROB’s works under progress and for 2 ROB’s South zone & 1 ROB North Zone DPR preparation is in progress. Black spots Rectification: The Karnataka State Road Safety Authority has identified 942 black spots (2015-18). Out of these 103 black spots pertains to National Highways South Zone Bengaluru. In this 99 black spots have been rectified and 4 black spots rectification work in progress. In North Zone all the identified 64 black spots have been rectified. The Karnataka State Road Safety Authority has identified 449 black spots (2019, 2020 & 2021). Out of these 73 black spots pertains to National Highways Zone Bengaluru. In this 59 black spots have been rectified and 14 black spots rectification work in progress. Upgradation of roads: The Ministry of Road Transport and Highways (South & North zones) has in-principally approved (10+28)38 State Highways roads pertaining to NH Zones of Bengaluru & Belagavi for upgradation to National Highways. For these State Roads consultancy services for feasibility studies have been foreclosed in accordance to the Ministry of Road Transport and Highways letter dated 28.07.2020. With respect to South Zone, 16 New State Highways up gradation proposals along with earlier declared in-principle 10 State Highways up gradation proposal was submitted to Ministry for Up gradation to NH. With respect to North Zone, having 18 New State Highways up gradation proposals along with earlier declared in-principle 28 State Highways up gradation proposal was submitted to Ministry for Up gradation to NH.
Planning and Roads Asset Management Centre (PRAMC)
Planning and Roads Asset Management Centre has been established to strengthen the plans, schemes and other prescribed functions of the department. It functions as the apex institutional body under government supervision for policy formulation, planning, and management of road assets. The main objectives of the centre are as follows.
- To function as a nodal agency for preparing plans, budgets, and programmes for roads in Karnataka within the Public Works Department.
- To improve planning and decision-making processes in the Department.
- To effectively and efficiently use information technology and to implement IT systems across the Department.
- To enhance human resource capacity through training programmes and skill development of departmental officers and staff.
- To implement a Pavement Management System and a Bridge Management System.
- To continuously manage and update the Road Information System (RIS)and Progress Monitoring System and other asset management systems.
- To carry out any additional responsibilities assigned from time to time.
With assistance from the Asian Development Bank, a consultancy team was appointed and is actively working. Required equipment and software have been procured and handed over to the consultants. Details of the procured equipment are provided below. a) Road Condition Data Collection Vehicle (RCDCV): These laser-based devices collect data such as International Roughness Index (IRI), rutting, ravelling, potholes, and other parameters required for planning. b) Falling Weight Deflectometer (FWD): This is a non-destructive testing device used to evaluate pavement structural strength without causing damage. It works by applying a load on the pavement surface and measuring surface deflections, from which pavement performance is assessed. c) Ground Penetration Radar (GPR): The Ground Penetration Radar (GPR) uses radar pulses to detect subsurface features and physical properties without excavation. It is a fast, non-destructive, and highly effective tool for assessing pavement layer thickness and composition. Data collected using these devices is analysed through specialized software and used to prepare the Annual Works Programme. As per Government Order prioritization of road widening, strengthening, and improvement works must be done using the KRAMS software developed by PRAMC. In 2017-18, the State Government created a separate budget head for road safety works. The Supreme Court Committee on Road Safety has issued several guidelines, which the State has incorporated into its road safety policy and protocols. During the financial year 2019–20, for the purpose of improving road safety on State Highways and District Major Roads, funds amounting to Rs.5,000 lakh were provided under Budget for the construction of crash barriers / guard rails at accident-prone locations such as curves, narrow stretches, ghat roads, water sources, bridges, and other critical locations. Under this sanctioned grant, 110 works were taken up and completed. In 2020, the Karnataka State Road Safety Authority identified 942 black spots, of which 214 were on PWD District Major roads and state highways. In 2021-22, works at these 214 locations were taken up and completed by 2023-24.
Post-Implementation Study Results
A post-implementation study was conducted by three engineering colleges on 100 improved black spots. The details of Abstract of accidents and fatalities for the Corridor / Location / Stretches during Post Implementation Project Appraisal is given in Table 10.17.
| Name of Institution | Number of Blackspots Reviewed | Number of fatalities before improvement | Number of fatalities Afet r improvement | % Reduction in fatalities | Total Number of accidents before improvement | Total Number of accidents Afet r improvement | % Reduction in accidents |
|---|---|---|---|---|---|---|---|
| JSS College of Engineering | 33 | 109 | 33 | 69.72 | 411 | 151 | 63.26 |
| BMS College of Engineering | 29 | 8 | 4 | 50.00 | 122 | 53 | 56.56 |
| RV College OF Engineering | 38 | 12 | 2 | 83.33 | 157 | 40 | 74.52 |
| Total | 100 | 129 | 39 | 67.69 | 690 | 244 | 64.78 |
For the financial year 2023–24, to take up road safety works, a grant of Rs.22,500 lakh has been provided from the Karnataka State Road Safety Fund, towards expenditure/maintenance. The payments for the works undertaken as per the approved Action Plan are being released from the sanctioned grant, in accordance with the directions of the Karnataka State Road Safety Authority. For the financial year 2024–25, to carry out road safety works, a grant of Rs.22,500.00 lakh has been provided from the Karnataka State Road Safety Fund towards expenditure/maintenance. For financial year 2025-26, an amount of Rs. 225.00 crore grant allocated to PRAMC, released Rs.225.00 crore, expenditure incurred Rs.222.63 crore upto the end of December 2025. Out of 122 works targets, 44 works completed. As per the information furnished by the Director General of Police, details of 32,222 accident locations have been provided. Out of these, 17,549 locations fall on District Main Roads and State Highways under the jurisdiction of the Public Works Department. Among them, 635 locations identified as highly accident-prone have been prioritized and are being taken up for improvement works in 2024–25, execution being carried out in the year 2025-26. Building Works: In the year 2022-23, with the support of the Social Welfare Department, Backward Classes Welfare Department, Minority Welfare Department and in collaboration with the Public Works Department, for the first time under the scheme ‘Deendayal Upadhyay Souharda Vidyarthi Nilayam’, multi-storied student hostel complexes with a capacity of 1000 each (500 male and 500 female students) are being constructed at an estimated cost of Rs. 82.56 crores per district in the educational centers of the State such as Belgaum, Hubli-Dharwad, Kalaburagi, Mangalore and Mysuru with a total estimated cost Rs.412.80 crore, Building works completed at Mysuru, Mangalore, Dharwad, Kalaburgi, work in progress at Belgaum. In the year 2022-23, with the grants provided to the Public Works Department under the SCP and TSP scheme, Dr. B.R. Ambedkar Student Hostels for Scheduled Caste and Scheduled Tribe students are being constructed at a cost of Rs. 640 crores (capacity of 100 students per hostel) and 11 KREIS Residential Schools (capacity of 250 students per residential school) are being constructed at a cost of Rs. 198 crores. Out of these, 44 works are in progress and 61works have been completed. An expenditure of Rs.547 crores has been incurred. Administrative approval has been given for the construction of 15 hostels for Scheduled Caste students running in rented buildings in 2024-25 for an amount of Rs. 105 crores and the tender process is underway. Out of these, 13 works are in progress at various stages and balance works are having site issues. An expenditure of Rs.23.38 crores has been incurred. An amount of Rs.459.13 crore and Rs. 48.04 crore have been provided under SCSP & TSP schemes for Construction of Hostels & Residential Schools for the year 2025-26 respectively. Out of which Rs. 281.09 crore and Rs. 22.38 crore amount released and Rs. 144.79crore and Rs. 22.38crore expenditure incurred upto Dec-2025 for construction of foot bridges under SCSP & TSP schemes. Construction of foot bridges: In the coastal, Malnad and Western Ghats regions, where there is no proper road connectivity, the construction of footbridges is being undertaken to provide safe pedestrian crossings for the public and especially school children to cross the streams and ravines.
- In the year 2023-24, the construction of 86 footbridges under the ‘School Link Bridge’ scheme taken up at an estimated cost of Rs.13.98 crore, 84 works completed and 2 works in progress. Expenditure incurred is Rs.6.37crore.
- In the year 2024-25, Construction of 173 footbridges under the ‘School Link Bridge’ scheme taken up at an estimated cost of Rs.30.17 crore, 137 works completed and 32 works are in progress. Expenditure incurred is Rs.3.98crore.
- In the year 2025-26, Construction of 185 footbridges under the ‘School Link Bridge’ scheme taken up at an estimated cost of Rs.31.25 crore, 1 work is completed and 170 works are in progress, balance works are under tender stage.
New concepts
- Public Grievance Redressal System software has been developed for the public to file complaints about the works of the Public Works Department on www.kpwd.gov.in.
- To maintain good quality in the implementation of works, maintenance by contractors for road construction works worth Rs. 5.00 crore has been made mandatory for a period of 5 years.
- Under the annual maintenance contract of the roads of the Public Works Department, one “road operator” has been assigned for every 35 km.
Details of Project Investment and Expenditure, PWD: From 2012-13 to 2025-26 (as on December 2025) an amount of Rs. 112445.6 crore has been spent for for Improvement & Renewal of Roads & Bridges, Construction of Buildings (Including Amount of Maintenance of Roads, Bridges & Buildings, KRDCL loan, Interest payments, Sand mining Expenditure) (Excluding salary component) as against the total budget allocation of Rs.122073.03 crore. As per MPIC Public Works Department, Financial and Physical Progress achievement for various plans from the Year 2013 to End of December 2025. (Excluding Amount of Maintenance of Roads, Bridges & Buildings, KRDCL loan, Interest payments, Sand mining Expenditure, Excluding Salary component)
- Improvements & Renewal to State Highway Roads & Bridges (Including KSHIP, KRDCL & SHDP) expenditure incurred Rs.42051 crores, Constructed 26878 Kms length of road, 607 Bridges completed.
- Improvements & Renewal to Major District Roads & Bridges constructed (Including SDP, CRF, CMGRY, NABARD), expenditure incurred Rs.37070 crores, Constructed 67600 Kms length of road, 2666 Bridges completed.
- Cement Concrete Roads constructed colonies under SCP & TSP Schemes, expenditure incurred Rs.9383 crores, Constructed 13219 Kms length of CC roads.
- Buildings Works Constructed (Including Departmental Buildings, Court Buildings, Departmental Residential Buildings, Judge Quarters), expenditure incurred Rs.5510 crores, 1860 Buildings Works completed.
Challenges
The total number of vehicles in the state was 3.35 crore in March-2025 and increased to 3.37 crore in August-2025. The process of widening lanes on the roads should be carried out in a balanced manner in line with the increase in vehicle density on roads.
Way Forward
- For the all-round development of the state’s roads, national highways will be constructed in innovative models with high durability, 4-lane/6-lane and state highways will be converted into two-lane and district major roads as medium-lane roads.
- Road safety works will be carried out on priority where necessary for the safety of road users.
- Identify the places where bridges are required and provide all-season connectivity to residential areas by constructing bridges.
- Construction of footbridges will be undertaken to connect the people of coastal, Malnad and Ghat areas.
Rural Roads
Rural Communications: The total length of rural roads in Karnataka as on 31.12.2025 is 198496 kms. Improvements of rural roads and their maintenance are being taken up under Pradhana Manthri Gram Sadak yojana (PMGSY), Namma Grama Namma Raste Yojane (NGNRY) and Mukya Mantri Grameena Raste Abhivruddi Yojane. Pradhana Manthri Gram Sadak Yojana (PMGSY) : PMGSY was launched with an objective to provide rural connectivity by way of all weather roads to eligible habitations having a population of 500 and above. Under this programme for the financial year 2025-26 Rs 156.60 crore has been allocated, of which Rs. 22.85 crore has been spent towards 22.834 kms of road works. For the maintenance of roads Rs. 59.08 crore has been allocated, of which Rs.19.77 crore has been spent for maintaining of 3270.49 kms of road length up to the end of December-2025. Mukhya Mantri Gramina Raste Abhivruddi Yojane: During 2025-26, an amount of Rs.1000 crore has been allocated of which Rs.750 crore has been released. An expenditure of Rs 644 crores has been incurred up to the end of December-2025.
§ 10.2.2Transport Department
Transport Department consists of Transport Commissionerate and Four Road transport corporations. An amount of Rs.7079.63 crores is allocated to the Transport Department for 2025-26 of which an amount of Rs.4837.37 crores is released upto 15th January 2026. The expenditure incurred is Rs. 4754.55 crores (Avalokana).
Transport and Road Safety
- YRevenue Collection: For the fiscal year 2025-26, the government has set a revenue collection target of Rs.15000 crores for the Transport Department (including state transport Undertakings). By the end of December 2025, a total of Rs.9,355.55 crore has been collected, achieving 89.42 % of the cumulative target of Rs.10,463 crores.
- YOne Nation-One Card Scheme: As per the Central Government Notification, steps have been taken to print smart cards in a uniform format across the country and distribute them to vehicle owners and licensees. The smart card is printed under the Centralised Printing Facility system in the office of the Transport Commissioner. Karnataka is the 4th state in the country to have implemented this scheme.
- YContactless services: Services are being provided to public through web based online Sarathi-4 software (Driving License) and Vahan-4 software (Vehicle Registration Certificate). As on 31-03-2025, a total of 2,48,61,126 Smart Card Driving Licenses and 3,69,49,855 Smart Card Registration Certificates have been distributed.
- Vehicle Scrappage Policy (RVSF): The Union Finance Ministry, Scheme Guidelines for reform-based parts of the scheme for special assistances to states for capital investment 2025-26, it has been stated that all government vehicles older than 15 years will be scrapped at the RVSF centers established in the state and incentive funds will be released. In this regard, Government Order has been issued to compulsorily scrap all vehicles belonging to the government/department/corporation/board/municipal council/other subordinate institutions of the government that are older than 15 years at the specified RVSF centers established in the state, instead of being scrapped at private centers. The data on government and private vehicles scrapped at the designated RVSF centers established in the state as of the end of December 2025 is given in Table 10.18.
| RVSF Centre | Year | Private Vehicles | Government Vehicles | Defence/ Impounded vehicles | Total |
|---|---|---|---|---|---|
| Mahia MSTC Recycling P Pvt | 01-04-2025 to 31—12-2025 | 3508 | 114 | 38 | 3660 |
| Suhas Automotive Pvt Ltd | 01-04-2025 to 31-12 -2025 | 155 | 631 | 195 | 981 |
| Total | 3663 | 745 | 233 | 4641 |
- The “Green Global World” concept, the State is taking steps to control air pollution by encouraging and popularizing the use of vehicles powered by electricity, batteries, LPG, CNG and others fuels that cause Low or Zero pollution. As the Government is extending support to obtain loan facilities from financial institutions, a large number of electric vehicles are being registered in the state and the state is making significant progress in reducing pollution. At the national level, the State has secured second place in the registered of electric two-wheelers and electric cars and it is commendable that the State has earned silver medals in the category of electric two-wheeler and car registrations. A total of 7,10,488 electric vehicles have been registered by the end of December 2025.
- YGreen Tax: The amount collected under Green Tax is being used for programmes chalked out for control of Air Pollution control awareness programs through Theatre, LED vehicles, Radio jingles, Hoardings, Bus Shelters, etc through DIPR (Department of Information and Public Relations), Government of Karnataka. Under this fund, Rs. 17.95crore was collected in the year 2024-25 and Rs.15.13crore was collected upto end of December 2025 for the year 2025-26.
- YEstablishment of charging stations for battery-powered vehicles: The registration of electric vehicles is being encouraged in the state of Karnataka. In this regard, an agreement of Rs. 4.00 crores has been signed with BESCOM. To facilitate the users of electric vehicles, BESCOM has already installed 100 AC and 26 DC charging stations at 70 locations within the jurisdiction of the Greater Bengaluru Municipal Corporation. Such charging stations have been installed on state-wide highways. The said stations can be identified through a mobile app and the charging unit amount can be paid. A plan has also been initiated to install such charging stations on state-wide highways.
- YAIR-POLLUTION: During the year 2025-26 (up to December-2025) checking was conducted on polluting vehicles and 8,88,582 vehicles were checked, cases were booked against 60,954 vehicles and Rs. 7.326 crores is collected as fine.
- YNOISE-POLLUTION: During the year 2025-26 (up to December-2025) checking was conducted against noise polluting vehicles and 8,46,680 vehicles were checked, cases were booked against 26,641 vehicles and Rs 6.93 crores is collected as fine.
- YVehicle Location Tracking Device & Emergency Button Installation Scheme in Public Service Vehicles: The central government’s notification and guidelines, the installation of Vehicle Location Tracking Devices and Emergency Buttons in public service vehicles such as minibuses, school buses, private service vehicles, maxi cabs, contract vehicles, motor cabs, and goods transport vehicles operating on national highways has been implemented under the Nirbhaya Scheme for the safety of women and children. The scheme was launched on 19th June 2024. In the state, there are a total of 6,04,863 public service vehicles, of which, by 31.12.2025, 2,10,006 vehicles have been equipped with Vehicle Location Tracking Devices and Emergency Panic Buttons.
- YHigh-Security Registration Plates (HSRP) Installation : The installation of High Security Registration Plates (HSRP) has been made mandatory for all old vehicles registered before 1st April 2019 in the state of Karnataka and the said scheme has been implemented on 18.08.2023. From 18-08-2023 to 31.12.2025, a total of 59,65,027 vehicles registered in the state.
- YRetro Reflective Tape : Retro Reflective Tape & rear marking plates help drivers of other vehicles to quickly identify the movement of vehicles when vehicles are moving at night, even if the tail lamps and indicators of the vehicles are not in good condition, thus controlling possible accidents. Accordingly, in the state, the installation of Retro Reflective Tape & rear marking plates for transport vehicles has been made mandatory from 05.04.2024, in the interest of road safety and the public and motor vehicle owners/driverless.
- Automated Driving Test Tracks : In order to scientifically test the driving skills of applicants for driving licenses without human intervention, it is intended to construct automated driving test tracks within the jurisdiction of all Assistant/Regional Transport Offices in the state. Currently, automated tracks are operating in Jnana Bharathi, Electronic City, Mysuru, Kalaburagi, Shivamogga, Dharwad, Hassan and Mangalore. Raichur and Belagavi works are under progress.In the year 2024-25, approval has been given for the construction of automatic test track in Puttur, Madikeri, Hunsur and Madhugiri. The construction work of Nelamangala and Chikkaballapur Automatic Test Track is in progress.In the year 2025-26, approval has been given for the construction of automatic test track in chitradurga, chamarajnagar and Honnavara at Tender stage.
- YOwn Buildings : The department is taking necessary steps to construct well-equipped permanent buildings with basic amenities for all of its offices. Currently 55 of the department’s offices are operating in their own buildings. Meanwhile, the construction work of the offices in Sirsi, Dandeli, Balki, Belagavi, and K.G.F. has been inaugurated. In the year 2023–24, construction work for RTO office buildings at Gokak and Sakaleshpur has been undertaken, and these projects are currently in progress. The construction of the RTO building at Ranebennur has been completed and is ready for inauguration. Approval has been granted for the construction of building a dedicated office for the Honnavar Assistant Regional Transport Office in the year 2024–25. The tender process for implementation of the work is currently underway. Additionally, the work order has been issued for the construction of a RTO building for the Madhugiri Assistant Regional Transport Office, and the work is yet to complete.
- YVehicle Inspection and Certification Centers Under P.P.P the BOT model, tenders have been invited to set up ATS(Automated Testing Stations) centers in 13 places in the state, namely, Devanahalli (Bengaluru), Shivamogga, Kolar, Bagalkot, Gadag, Belagavi, Vijayapura, Yadgir, Ballari, Bidar, Ranebennur (Haveri), Tumkur and Davangere.
- Under P.P.P the BOO model, tenders have been floated to set up ATS centres at 19 places in the state, including Bengaluru (Central), Bengaluru (West), Bengaluru (East), Bengaluru (South), Chikkaballapur, Bengaluru South District, Mandya, Chamarajanagar, Hassan, Madikeri, Dakshina Kannada, Udupi, Chitradurga, Chikkamagaluru, Uttara Kannada, Kalaburagi, Raichur, Koppal and Hosapet.
- YHeavy Vehicle Driver Training Institute With a view to prepare good quality and skilled drivers, Heavy vehicle driver training institutes have been set up at Singanayakanahalli in Bengaluru and Gamanaghatti in Dharwad, Kalaburagi and Mangaluru.. Construction works of the training institute at Shivamogga has been taken up under Road Safety Fund for the year 2023-24 and the work is in progress. The estimate for the construction of heavy vehicle driver training centers in Nagamangala, Ballari and Vijayapura has been approved from the Road Safety Fund for the year 2025-26, and a tender process is to be undertaken for the implementation of the work. From 2015-16 to the end of January 2026, a total of 5,60,705 candidates have received training, of which 90,318 candidates received training from April to January of the year 2025-26.
- YSeizing Yard
It is proposed to construct seizing yards for parking of vehicles seized in violation of the Motor Vehicles Act and rules in the context of enforcement work and approval has been given to construct seizing yard in Mangaluru instead of Tumakuru in 2024-25. The tender process for the implementation of the said work is to be taken up and the construction of the seizing yard at Devanahalli is in progress. Vehicle Population: The total 343 lakh vehicles in the state as at the end of December 2025, 34.61 lakh vehicles are transport vehicles and 308.00 lakh vehicles are non-transport vehicles. A total of 1.42 lakh vehicles have been registered from April 2025 to December 2025. The details of the vehicles registered and in circulation in the State of Karnataka and the metropolis of Bengaluru in the last 5 years (2021-2022 to 2025- 26) are given in the Table (cumulative) 10.19.
(Cumulative) (in crores)
| Year | Bengaluru city | Karnataka State | Share of Bengaluru (%) |
|---|---|---|---|
| 2021-22 | 1.04 | 2.84 | 36.6 |
| 2022-23 | 1.09 | 2.98 | 36.5 |
| 2023-24 | 1.16 | 3.16 | 36.7 |
| 2024-25 | 1.18 | 3.35 | 35.2 |
| 2025-26 (As on Dec 2025) | 1.23 | 3.43 | 35.9 |
Four Transport Corporations
Shakthi – Free travel for women: The Government of Karnataka has launched it’s ambitious scheme ‘Shakti – free travel for women’ on 11.06.2023, a flagship programme which is a step towards strengthening woman empowerment in the state. The scheme has been hugely successful. The salient features of the scheme are:
- All women of the state, including the third gender, having domicile of Karnataka are eligible to avail this scheme.
- Women are issued ‘Zero-value ticket’ after verifying the identity card.
- The cost of travel is reimbursed to the Corporations based on the Zero ticket issued data.
- A grant of Rs.5015 crores has been provided in the budget for 2024-25 for the reimbursement of the cost incurred by women passengers under the government’s Shakti Yojana.
- An amount of Rs.5300 crores has been allocated for this scheme for the year 2025-26.
- Beneficiary details of the Shakti scheme from 01-04-2024 to 31.12.2025 is as detailed in Table 10.20 and the details of passengers travelled before and after implementation of Shakti Scheme is presented in Table 10.21.
(Rs. in Cr) (Rs in crore)
| Year | KSRTC | BMTC | NWKRTC | KKRTC | Total | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total Passengers | No. of women passengers in Total passenger | % of W.P | Total Passengers | No. of women passengers in Total passenger | % of W.P | Total Passengers | No. of women passengers in Total passenger | % of W.P | Total Passengers | No. of women passengers in Total passenger | % of W.P | Total Passengers | No. of women passengers in Total passenger | % of W.P | ||
| Before Shakthi Yojane | 2022-23 (estimated) | 29.72 | 10.4 | 35 | 33.67 | 16.84 | 50 | 16.49 | 5.77 | 35 | 13.58 | 4.48 | 33 | 93.46 | 37.49 | 40 |
| Afetr Shakthi Yojane | 2024-25 | 34.29 | 20.82 | 61 | 40.24 | 21.17 | 53 | 24.47 | 15.53 | 63 | 16.91 | 9.51 | 56 | 115.91 | 67.03 | 58 |
| 2025-26 (upto Dec 2025) | 34.81 | 23.01 | 66 | 42.98 | 24.36 | 57 | 26.48 | 18.1 | 68 | 16.87 | 10.21 | 61 | 121.14 | 75.68 | 62 |
No. of beneficiaries (in crores)
Achievement / Impact of the Project / Intervention
I. A survey on the Shakti scheme conducted by the “M2M Media Network LLP” in September-2023 and November-2023 revealed the following findings.
- Women have responded positively to the Shakti scheme. Women’s participation in the Shakti scheme has increased from 57% in September-23 to 64% in November-23.
- Women’s daily transport usage increased from 20% in September-23 to 27% in November-23.
- Shakti Scheme has encouraged 50 percent of women to enter employment.
- The overall Shakti Scheme is perceived as a positive catalyst for women empowerment and economic contribution.
II. A study on “Fiscal Effects of Shakhti Scheme in the Government of Karnataka” conducted by the Fiscal Policy Institute revealed the following findings.
- Comparison of labour force participation and worker population ratio before and after the implementation of the Scheme shows that despite a decrease in the overall LFPR (Labour Force Participation Rate) and WPR (Worker Population Ratio), the female labour force participation rate and female worker population ratio have increased.
- LFPR and WPR increased by 5% year-on-year. Details given in Table 10.22.
- This indicates an increase in women’s interest in participation of economic activity and their share in the job market.
| LFPR/WPR | October-December 2022 | October-December 2023 | Percentage Increase |
|---|---|---|---|
| LFPR (Labour Force Participation Rate) | 25.1% | 30.2% | 5.1% |
| WPR (Worker Population Ratio) | 23.7% | 28.8% | 5.1% |
III. The Sustainable Mobility Network and Nikore Associates, a New Delhi-based economic research and policy advisory think-tank, has conducted a study in 10 cities of which Delhi and Karnataka State have free travel plans, whereas West Bengal and Kerala State do not have it and Maharashtra State has a 50% discount on travel fares. This is the first analytical report prepared after conducting the survey in several states on free public transport scheme. The organizations released the report on 25.07.2025. The outcomes of the study are as mentioned below.
- The Shakti Scheme has created more employment opportunities for women across the state, contributing economic empowerment.
- Due to the Shakti Scheme, the employment rate of women has increased by 23% in Bengaluru and 21% in Hubballi-Dharwad.
- While other states have implemented several schemes like free travel on government transport and 50% discount on travel fares, similar to the State’s Shakti Scheme, Karnataka’s performance has surpassed other states.
- Women are able to save between 30% and 50% every month due to the free bus service.
- Shakthi Scheme has empowered women by providing them with better job opportunities, better wages, and better market facilities to become entrepreneurs.
I. Karnataka State Road Transport Corporation
KSRTC with its head office in Bengaluru provides bus service primarily to moffusil areas of southern Karnataka while BMTC, also headquarter in Bengaluru provides transportation to the capital city. The NWKRTC with headquarters in Hubballi provides transportation to the North Western Districts of Karnataka while KKRTC with headquarters in Kalburgi provides transportation to the North Eastern Districts of Karnataka. Physical performance: KSRTC has in its jurisdiction seventeen southern districts of Karnataka and provides bus service to 20090 villages out of 21748 villages, the percentage service provided being 92.4%. 8261 schedules were operated as on 31.12.2025, by utilizing 8766 vehicles, for the cumulative period the operation was average of 29.95 lakh kms/day earning gross revenue of Rs.1435.57 lakh and carrying 34.81 lakh commuters on an average daily with workforce of 34236 employees. The Physical statistics of KSRTC, BMTC, NWKRTC and KKRTC for the year 2024-25 (upto December-2024) and 2025-26 (upto December-2025) is furnished in the Appendix 10.1. Thus KSRTC operated 8237.09 lakh effective kms. during the year 2025-26 (upto December-2025) as against 7887.38 lakh effective kms operated during the same period of previous year. The percentage fleet utilization has increased to 91.5 during the current year as against 89.5 in previous year. During the current year period KSRTC has inducted 10 new buses to its fleet and replaced 163 old vehicles which were not fit for operation. Financial Performance: During the year 2024-25, the Corporation incurred a loss of Rs.81.83 crore as against a loss of Rs.295.43 crore during 2023-24. During the year 2025-26 (upto December 2025), the Corporation incurred a loss of Rs.231.94 crore as against a loss of Rs.222.44 crore incurred during 2024-25(upto December 2024). The financial statistics of KSRTC, BMTC, NWRTC and KKRTC for the year 2024-25 (upto December-2024) and 2025-26 (upto December-2025) is furnished in the Appendix 10.2. During the year 2024-25, the Corporation by utilizing its internal resources and grants released by the Government under KGIDF, has taken up 81 works at an estimated cost of Rs.27440.06 lakhs of which an amount of Rs.11559.17 lakhs was spent for 69 civil works including the works under progress during the year. The details of the works are as mentioned below.
- One work taken up under TSP Scheme is in progress, for which an amount of Rs.221.45 lakhs has been incurred during the year 2024-25.
- Under KGIDF Scheme, Out of 31 works, 13 works for the development of infrastructure have been completed and 18 works are in progress. Under the said scheme, a total expenditure of Rs. 1801.66 lakhs has been incurred in the year 2024-25.
- During 2025-26, The Corporation by utilizing its internal resources and grants released by DULT has taken up 78 works at an approximate cost of Rs. 7204 lakhs of which 72 are under progress. The expenditure incurred upto Dec-2025 is Rs.1899.16 lakhs.
Social Obligations
1. The financial compensation given to the dependents of the passengers who die in accidents of KSRTC buses has been increased from Rs.3 lakh to Rs.10 lakh. 2. All the four Corporations(KSRTC, BMTC, NWKRTC and KKRTC) have been fulfilling it`s social obligation by providing free/concession passes to several sections of the society namely, students, physically challenged, blind, freedom fighters, senior citizens, Olympians, para olympians, Arjuna awardees, National Shourya prashasti awardees, Ex- MLAs & Ex-MLCs within state and inter-state in any bus along with a companion, sitting MLAs & MLCs within state and inter-state in any bus with gold pass etc. Android based Smart Electronic Ticketing Machine (ETM): KSRTC deployed Android-based Smart Electronic Ticketing Machines (ETMs) across all KSRTC depots to modernize on-board ticketing operations, enhance transparency, and promote digital payments. UPI-Based (Dynamic QR) Digital Payment in KSRTC ETMs: KSRTC implemented a Dynamic QR-based UPI digital payment system across all Smart Electronic Ticketing Machines (ETMs) with effect from 11.11.2024, enabling passengers to make seamless cashless payments using any UPI application. This initiative strengthened digital transactions, improved transparency, reduced cash handling and enhanced passenger convenience across KSRTC services.
Achievements
- For the first time in the history of the country’s road transport corporations, an accident insurance scheme of Rs. 1.00 crore has been implemented for on-duty and off-duty accidents.
- Compensation amount of Rs. 20.00 lakhs is given to the dependents of the deceased in the event of untimely death of the employee.
- KSRTC has launched a cashless medical treatment scheme called “KSRTC-Arogya” for all it’s employees and their dependents.
Way Forward
- KSRTC has planned to induct 1500 buses during the year 2026-27.
- KSRTC is in the process of implementing VTMS (Vehicle Tracking and Monitoring System) with AIS-140 compliant tracking system and panic buttons in all the buses under the scheme “Central assistance for strengthening Public Transport”.
- To enhance safety, security, and operational transparency in KSRTC bus operations, initiated the Bus Surveillance Camera Project, proposing the installation of surveillance cameras in 1,000 KSRTC buses. The system design includes two cameras per bus, comprising a saloon camera to monitor passenger activities and ensure in-bus security, and a dashboard-facing (dash) camera to capture road conditions and driving events.
II. Bengaluru Metropolitan Transport Corporation
The Corporation is providing quality, safe, reliable, clean and affordable travel facility to the commuters through its various initiatives and adoption of new technology and induction of new type of buses as per the increasing number of passengers. The Corporation is providing services by scientific fare system. The operational jurisdiction of BMTC went beyond B.B.M.P limits by 25 kms of Bengaluru, thus providing services to commuters in and around sub-urban of Bengaluru city. As on 31.12.2025, the Corporation has operated 6291 Schedules by utilizing 6984 vehicles, it has operated average schedules of 5860.4 and covers daily 12.07 lakhs kms. and earns average revenue of Rs. 731.36 lakh Traffic revenue by carrying 42.98 lakh passengers daily. The workforce of the Corporation is 29280. In the year 2025-26 (Upto Dec-2025), the corporation has inducted 322 Electric vehicles (private) which are operating on GCC model scrapped 127 old vehicles. Financial Performance: During the year 2025-26 (upto December-25) the Corporation has operated 33.19 crore effective kms, earned gross revenue of Rs. 2396.60 crores (including Rs. 206.52 crores financial assistance from government) and incurred an expenditure of Rs. 2697.12 crore and sustained a loss of Rs. 300.52 crore.
Achievements & Programmes of 2025-26 (Upto Dec)
- Shakti Scheme: About 202.10 crore women passengers have benefited from Shakti Scheme in BMTC buses till date (11-06-2023 to 31-12-2025) from the inception of the scheme, with daily average passengers of 21.62 lakhs. On July 14, 2025, under the Shakti Scheme, Karnataka achieved a historic milestone by reaching 500 crore women passengers across 4 RTC’s, setting a new national benchmark.
Operation of Electric buses
- Electric buses have been introduced over the last four years, and as of 31.12.2025, a total of 1,689 electric buses are in operation.
- Under the State Government’s capital investment scheme, a grant of Rs.150 crore has been provided to operate 320 air-conditioned electric buses on a GCC basis. Currently, 267 buses are in operation, and the remaining 53 buses will be introduced in a phased manner.
- Under the NCAP scheme (Rs.55.00 crore) and DULT scheme (Rs.29.13 crore), it has been planned to operate 148 non–air-conditioned electric buses on a GCC model during the financial year 2025–26 of which 113 buses supplied are already in operation.
- Under the PM e-DRIVE scheme, the Central Government has sanctioned 4,500 electric buses to BMTC for operations under the GCC model. The tender process is in final stage.
Launch of new transport services
- The BMTC launched the “Divya Darshana” package tour for devotees and tourists on 28.05.2025, providing one-day trips to major and historical temples in Bengaluru. Currently, 11 Divya Darshana routes are being operated. Every weekend (Saturday and Sunday), approximately 1,200 tourists are availing the benefit of these services..
- BMTC organised the launch event of new “Ghati Eesha Foundation” package tour on 20.06.2025. Based on tourist demand, from 21.06.2025 onwards, an air-conditioned “Ghati Eesha Foundation” package tour service are being operated on weekends and public holidays. Additionally, special services are also being operated from Banashankari and Silk Board.
- Further, for the convenience of the public, BMTC organised the launch of new Express (Limited Stop) services, and these services commenced on 11.07.2025. Currently, a total of 120 schedules on 11 routes with 900 trips are in operation.
- To strengthen metro connectivity for public convenience, BMTC launched 4 new Metro Feeder Bus routes on the Yellow Line (6 metro ststions) from 12.08.2025. Currently, a total of 212 metro feeder schedules are in operation across bengaluru.
- In collaboration with M/s Ohm Global Mobility Ltd., BMTC has launched new air-conditioned electric “Vayu Vajra” bus routes to Kempegowda International Airport. Through these new Vayu Vajra services, airport connectivity is provided from various parts of Bengaluru across 11 routes using 85 buses.
- Based on passenger demand, the corporation has established 62 new bus stops within its operational limits.
Passenger friendly initiatives
- During the year 2025-26 (upto Dec), 1,74,390 free/concessional bus passes have been issued of which 1,38,596 General students, 30,315 scheduled caste students and 5,479 scheduled tribe students.
- In collaboration with Continental India Automotive Company, BMTC introduced the “OnBoard” technology on 12.07.2025 to support independent travel for visually impaired passengers. This technology provides information such as bus number and stop details through audio, helping visually impaired passengers travel without assistance.
- To manage increasing traffic congestion in the city and to quickly resolve minor accidents occurring en route, BMTC launched five new Mobile Breakdown Repair Vans on 24.03.2025. These vans have been deployed at key locations including Shivajinagar, Yeshwanthpur, Jayanagar/Banashankari, Silk Board, and Nayandahalli Junction, and will operate along with the two existing vehicles stationed at Marathahalli Outer Ring Road and Kempegowda Bus Station.
- For the convenience of passengers and to promote digital payments, BMTC has introduced the UPI (QR Code) payment system for ticket purchases and enabled the purchase of daily, weekly, and monthly passes through the Tummoc app. This has received a good response from the public
Financial assistance from Govt
- GoK has allocated Rs.150.00 crores under financial assistance/relief - (VGF) in the budget for the year 2025-26 of which Rs. 112.50 crores has been released upto Dec-2025. The said amount is being used for payment of employees salary.
- To provide financial support to the transport corporations, an announcement was made in the 2025-26 to obtain a loan of Rs.2000 crore from financial institutions with a government guarantee. Accordingly, BMTC’s share of Rs.589.20 crore was obtained from Punjab National Bank at an interest rate of 8.80%, and it has been fully utilized for clearing outstanding provident fund dues and diesel payments. The government is providing the funds announced in the 2025-26 budget speech for the payment of the principal and interest on the said loan.
Labor welfare measures
- BMTC has been organizing free eye screening and spectacle distribution camps under “Saarige Asha Kirana” scheme, in collaboration with the Department of Biotechnology, Government of India, through C-CAMP. These camps are being conducted in phases from 06.05.2025. A total of 7,465 employees benefited from this programme up to December 2025.
- An agreement has been signed with Canara Bank, SBI Bank, Union Bank to implement “Accident Insurance Scheme” for the staff of the corporation, providing coverage of Rs.1.00 crore, Rs.1.00 crore, and Rs.50.00 lakh respectively in case of death due to duty-related or personal accidents. On 01.02.2025, insurance cheques of Rs.1.00 crore each were distributed to the dependents of 4 employees who died in accidents. During 2025-26 up to December 2025, a total of Rs.4.60 crore has been paid to be dependents of 55 employees who dies due to natural cases and Rs. 50 lakh each total Rs.2 crore has been paid to the dependents of 8 employees who died due to accidents.
- In addition, under the revised Group Insurance Scheme implemented on 19.02.2024, an insurance compensation of Rs.50 lakh is provided in case of accidental death and Rs.10 lakh in case of natural death. From 19.02.2024 to January 2025, among 86 deceased employees, compensation of Rs.10 lakh each (total Rs.4.60 crore) has been paid to the dependents of 46 employees who died due to natural causes, and Rs.50 lakh each (total Rs.2.00 crore) has been paid to the dependents of 4 employees who died due to accidents
- A total of 3,652 staff and officers have received internal refresher training.
- During 2025-26, BMTC has reimbursed Rs.16.45 crore towards the medical expenses of its employees and officers.
Recruitment: 19 Dependents of the deceased employees have been recruited on compassionate grounds during 2025-26 upto December 2025.
Training program for external candidates
- Under the SCSP/TSP scheme the BMTC provided light and heavy vehicle driving training to a total of 673 candidates of Scheduled Castes and Scheduled Tribes for the financial year 2025-26 (up to December 2025).
- From April 2025 to December 2025, a total of 148 external candidates have received fee-based professional vehicle driving skill development training.
Basic amenities
- Construction of women staff rest houses are being carried out at Depot-20 (Banashankari), Depot-51 (Sadaramangala), and Depot-08 (Yeshwanthpura) at a total cost of Rs.95.00 lakh.
- At Depot-51 (Sadaramangala), development work has been undertaken at a cost of Rs.232.00 lakh, Detail of works under taken are as below:
- Construction of concrete pavement for the bus parking area
- storm water drain
- kerb wall
- Dining halls for staff have been constructed at Bus Depot-41 (Gunjuru), Depot-33 (Poornapragna Layout), Depot-21 (Rajarajeshwarinagar), Depot-31 (Srigandhakaval), and 25 (HSR Layout) at a total cost of Rs.138.19 lakh.
- Rest rooms for staff have been constructed at Bus Depot-31 (Srigandhakaval), Depot-13 (Kathriguppe), Depot-21 (Rajarajeshwarinagar), and Depot-52 (Uttarahalli) at a total cost of Rs.69.77 lakh.
- For charging electric buses, electric infrastructure under VGF subsidy has been provided:
- Central Silk Board Bus Station – 1,400 KVA capacity at Rs.330.00 lakh
- Kempegowda Airport – 1,400 KVA capacity at Rs.87.40 lakh
- Depot-7 Subhash Nagar – 3,700 KVA capacity at Rs.119.25 lakh
- Depot-10 Hennur (KPTCL portion) – 5,000 KVA capacity at Rs.30.24 lakh
- Total cost: Rs.566.89 lakh
- At Shantinagar Central Workshop-1, repair and other development works have been undertaken at an estimated cost of Rs.50.00 lakh.
- Concrete pavement work at Depot-42 (Kodathi) has been carried out at an estimated cost of Rs.500.00 lakh.
Other Initiatives
- BMTC’s Kalasipalya Bus Station was renamed as “Janopakaari Shri Doddana Shettara Kalasipalya Bus Station”.
- YIntelligent Transport Systems: The Ministry of Women and Child Development, Government of India has sanctioned a total grant of Rs. 40.92 crore under the model of 60% grant from the Central Government and 40% grant from the Government of Karnataka for the implementation of women safety features and surveillance system, mobile application of the BMTC and passenger information system at bus stands, etc., under the Nirbhaya Yojana. Total expenditure incurred under Nirbhaya Scheme is Rs. 31.99 crore upto December-2025.
- ‘Namma BMTC’ mobile app for women safety with SOS feature has been launched to the public on 25.09.2023. Currently, around 14.00 lakh people have downloaded the app.
- Automated Vehicle Location System (AVLS) technology has been made Go-Live.
Awards: BMTC has received a total of 7 awards from January 2025 to December 2025) for its outstanding performance. BMTC has been recognized and has received many National and International level awards. To list out a few among them.
- “Connected, Autonomous and Electric Vehicle Expo” People’s Choice Awards 2025 i. Pioneering in Green Public Transport Award ii. Next Gen Commuter Convenience Award
- YBlugreen Awards 2025: Certification of Recognition under Energy and transportation sector by Climate Action Cell (BBMP).
- BMTC Honored by ELCITA as ‘Most Valuable Partner’ for Contributions to Sustainable Public Transport.
- 19th National Digital Transformation Awards 2025 under the category Digital Inclusion & Accessibility Award for its pioneering initiative, “OnBoard” Technology in BMTC Buses. Silver Award at the Motoring World Green Mobility Awards 2025 under the category “Best City for EV Bus Adoption.”
Challenges
- The average diesel price which was Rs.55.80 per litre during 2017-18, has been increased to Rs 87.16 in 2025-26. The increase in fuel cost is additional financial burden to the Corporation.
- There is considerable decline in passengers travelling in BMTC buses due to increase in Ola/Uber/Other 4 wheeler and 2 wheeler taxi services and public commuters opting for personalized mode of transport such as bikes and cars resulted in Revenue loss to BMTC.
- The average passengers carried per day in BMTC buses is 2015-16 was 51 lakh and the same is decreased to 42.98 lakh in 2025-26(upto Dec).
III. North Western Karnataka Road Transport Corporation
NWKRTC has Corporate Office at Hubballi, which covers six Districts, 59 talukas and 4610 villages in its jurisdiction. Corporation is serving 4565 villages out of 4610 villages in its jurisdiction (98.9%). The Corporation has 9 Divisional Offices, 56 depots, 176 bus stations, 1 Regional Workshop and 1 Regional Training Institute at Hubli and 1 driving and mechanical training institute at Shiggaon. Physical Progress : During the year 2025-26 (up toDec-2025) the Corporation operated 4962 schedules by utilizing 5218 vehicles. 11 new vehicles have been added to the fleet and 136 old vehicles have been scrapped. From April-2025 to December-2025 transport facility provided to 26.48 lakhs passengers daily by covering 16.93 lakh Kms and earned average revenue of Rs. 8.54 Crore daily. The percentage of fleet utilization stood at 92.8. Financial Progress : During the current year 2025-26 (up to December-2025) Corporation has earned a profit of Rs 285.24 Crores as against Rs. 83.76 crores loss sustained during the corresponding period of previous year. After excluding the non-reimbursement of Shakti Revenue from Government of Karnataka the Loss Works out to Rs.198.66 Crores and the loss during the corresponding period of previous year was Rs. 189.11 Crores.
- YPurchase of New buses
- During the year 2024-25, a total of 560 buses consisting of 433 Moffussil, 125 City, 02 Volvo Ambari Utsav (AC Sleeper) buses have been purchased and they are in operation.
- An amount of Rs. 123.53 crores is released to the NWKRTC, and orders have been issued for the purchase of 330 vehicles.
- Under PMe BUS SEWA, a total of 200 electrical vehicles have been sanctioned for the cities of Belgaum & Hubli-Dharwad by NWKRTC for the year 2025-26.
- During 2025-26, from internal resources of Rs. 23.00 crores, 11 City buses have already been purchased and they are in operation. Procurement of 14 air-conditioned sleeper coaches (Rs. 8.00 crore) and 20 non-air-conditioned sleeper coaches (Rs. 10.00 Crore) and 11 city buses (Rs. 5.00 crore) is in progress.
- YRecruitment
- During 2025-26 (up to December-2025), 45 candidates have been appointed on compassionate grounds and for appointment of 2000 Drivers and Driver cum Conductors posts direct recruitment has been made.
- Recruitment for the posts of 19 Assistant Traffic Inspector Grade-3 and 33 Grade-2 is under progress.
- YDevelopmental Works
- From the capital expenditure of the government, reconstruction of the old bus stand at Sirsi at the cost of Rs. 6.78 crore and reconstruction of the new bus stand at Shiggaon at the cost of Rs. 8.00 crore and the construction of a driving and mechanic training center at Shiggaon at an cost of Rs. 20.00 crore has been completed and inaugurated.
- NWKRTC, in Coordination with DULT, upgradation work of Central Bus Station at Gokul Road Hubballi at a cost of Rs. 23.48 crore and the reconstruction work of new City bus station at Dharwad at an cost of Rs. 13.11 crore has been completed and inaugurated.
- YLabour Welfare Measures : The following personal accident insurance schemes have been implemented with the aim of providing maximum financial benefits to employees and the dependents of their family Members, in case of death/accident of an employee while in service.
- )STATE BANK OF INDIA CSP Plan: Corporate Salary Package (CSP) of Rs. 50.00 lakhs with State Bank of India (SBI) has been revised with effect from 23-12-2024 to cover Rs. 1.00 crores for Personal Accident Insurance and Rs.6.00 lakhs Group Term Life Insurance plan in case of natural death. Since the implementation of scheme, a total of Rs.6.76 crore has been paid to the dependents of 20 employees.
- )CANARA BANK - SPP : Special Payroll Package (SPP) of Rs.1.00 crore with Canara Bank for Personal Accident Insurance and a maximum of Rs. 5.00 lakhs Group Term Life Insurance plan on salary basis in case of natural death has been implemented on 14-11-2024.
- )Bank of Baroda SGSP Plan : A maximum insurance of Rs. 1.25 crores for employees who expired while in on duty and Rs. 1.00 crores in the case of employees who expired in an accident while in off duty has been implemented from 15-08-2025.
Implementatin of new IT Softwares(2025-26)
- YPassenger Feedback System: In order to provide cash prizes and award certificates to well-managed bus stands under the theme ‘’£ÀªÀÄä §¸ï ¤¯ÁÝt, ¸ÀéZÀÑ ¤¯ÁÝt’’ (“Our Bus Station, Clean Station”), a QR code based Passenger Feedback System software has been developed and implemented internally to get the evaluation from the passengers in the first phase. So far, more than 1500 feedbacks have been received from the passengers.
- YDeployment of recruited crew and other staff software: A software has been developed to assign newly recruited crew and other staff to their desired place through counselling based on the availability of vacancies. A new dashboard has been developed so that the staff present during the current counselling process can get information about the vacancies available at that time.
- YSoftware for managing commercial shop licenses : For the first time, software has been developed for managing commercial shops of the Corporation, income from shops, rentals, advertising displays, etc.
- Y“Land Beat” App: In the “Land Beat” App, out of the 255 properties under the jurisdiction of the NWKRTC, 143 properties have a survey number from the Revenue Department, out of which 109 properties have been surveyed and the boundaries of the properties have been identified, making the Land Beat App work digitalized for the first time in the state. The work of digitizing the remaining properties is in progress.
- YCash Pickup facility from SBI: An agreement to collect cash directly by SBI’s from Dharwad Moffussil Depot on a pilot basis has been signed on 07-11-2025.
IV. Kalyana Karnataka Road Transport Corporation (KKRTC)
Kalyana Karnataka Road Transport Corporation (KKRTC) has jurisdiction over 8 revenue districts viz., Kalaburagi, Bidar, Yadgiri, Raichuru, Bellari, Koppala, Vijayapura and Vijayangar. It has 9-operating Divisions, 53-Bus Depots, 165-Bus stands, 9-Divisional Workshop, 1-Regional Workshop, 2- Training Institutes. (Humnabad and Hagari bommanalli) Physical performance: During the year 2025-26(up to December-25), the Corporation operated 4692 schedules utilizing 5018 vehicles. It is operating 16.26 lakh kms, and earning daily gross revenue of Rs. 7.65 Crore. The percentage fleet utilization stood at 92.8. 105 old vehicles were scrapped. Financial Performance: During the current year 2025-26 (upto December 2025), the Corporation, earned profit of Rs. 158.73 Crore on total revenue as against the previous year period profit of Rs. 38.32 Crore. The profit of the Corporation is increased by Rs. 120.41 crore, as compared with the margin of the previous year period.
New Initiatives
- YNew Vehicle induction:- During the year 2025–2026 (up to the end of December 2025), it is planned to induct 750 vehicles, of which 146(142 city suburban and 4 Non-AC Sleeper)are being inducted. Further process is in progress to procure 56(20 non-AC sleeper 20 AC sleeper and 16 AC seater) new vehicles.
- YRecruitment: The recruitment process to appoint 300 supervisors and 16 assistant Accountants through Karnataka examination Authority is under progress.
- YInternal Group Insurance Scheme: In case of death of the employees prematurely, their dependents will get Rs 10.00 lakh through IGIS.
- YSBI Insurance Plan: KKRTC has entered into an agreement with State Bank of India under the Corporate Salary Package with effect from 2.12.2022 and an insurance scheme of Rs. 50.00 lakhs was implemented for the dependents of the deceased in case of death of the employees while in on-duty accident and private accident. Under this scheme, Rs. 7.00 crore has been distributed to 14 dependents of the deceased at the rate of Rs. 50 lakhs to each dependent.
- Further, KKRTC has revised the Corporate Salary Package Insurance Scheme with State Bank of India from Rs. 50.00 lakhs to Rs. 1.00 crores has been implemented and it will be provided to the dependents of the deceased in case of death of the employees while in on-duty and private accident. In addition, in case of natural death of employees, an insurance scheme of Rs. 5.00 lakh and other facilities have been provided for the dependents.
- YUnion Bank USSA Insurance Plan(Union Super Salary Account) and CANARA BANK PPS Insurance Plan (PayRoll Package): Under this plan, Rs. 1.00 crore for the dependents of the deceased in case of death of the employees while in on duty or in a private accident and Rs. 6.00 lakh in case of natural death is provided.
- YHealth Service agreement with Sri Jayadeva Heart Science and Research Institute: As a precautionary measure, to prevent all heart-related diseases, a health service agreement has been signed with the Sri Jayadeva Institute of Cardiology and Research to provide cashless screening/examination for all employees.
- YNon-Communicable Diseases (NCD) Screening Camp for Corporation Staff: As a precautionary measure, in collaboration with the District Health Department, camps are being organized for all the corporation’s employees in all Divisions to check non-communicable diseases such as heart disease, cancer and eye check-ups.
- YOperation of conductorless services: KKRTC has operated 461 conductor less services.
- YHeay Driving and Technical training institute in Telkur: Heavy driving and technical training institute is established in 20 acres of land with the cost of Rs.15.00 Crore in Telkur of Sedum Taluk.
D. Devaraj Urs Truck Terminals Ltd.
- It is established with the objectives of Establishment of Truck Terminals for the benefit of Lorry/Truck Transporters at National Highways in Bengaluru and other Cities of the State to avoid Traffic Congestion, to control Road Accidents, Air Pollution, Facilities for Loading and Unloading the Goods and providing infrastructure facilities to crew members.It has constructed Truck Terminals in Bengaluru, Mysuru and Dharwad. These Truck Terminals are operational.
- The construction of Truck Terminal in an area of 13.28 acres at Dasanapura Village of Bangaluru North Taluk is completed. It is intended to complete the work of construction of CC approach road to Truck Terminal this year.
- Construction of Truck Terminal Phase-1 at Amaravathi Village, Hospet Taluk, Vijayanagar District in an area of 37.82 acres is under completion stage.
- Land to an extent of 56.13 acres allotted by the Govt. of Karnataka was purchased by DDUTTL at Anchatgeri Village, Hubli Taluk, Dharwad District to develop Logistic Park/Truck Terminal nearby NH-63.
- 3.00 acres land was purchased at a cost of Rs.11.15 lakhs for Construction of Truck Terminal at Dandeli Village, Uttara Kannada District. Rs:198.00 lakh amount utilized to provide basic facilities and minimum repair works at Truck Terminal.
- 15.00 acres of land has been allocated by the Revenue Department for the construction of a truck terminal in Chikkathuppur village, Gundlupet taluk, Chamarajanagar district. To construct a compound wall around the truck terminal premises and to undertake other development works, a grant of Rs.1.99 crore has been released from the Karnataka State Central Habitat.
- 10.00 acres of land in Yaramaras village of Raichur taluk, has been handed over to D. Devaraja urs Truck Terminal Ltd. by the Revenue Department. A grant of Rs. 2.00 crore has been released for development under the Kalyana Karnataka Development Scheme.
- In a total of 9 Truck Terminal areas in the state of Karnataka, the Truck Terminal area at the beginning and end of the Terminal premises has been constructed by the Karnataka State Central Habitat with a grant of about 85.00 lakhs to make the truck drivers to visible and to help the truck drivers to know the location and direction of the Truck Terminal area of the total 9 Truck Terminal premises in the state. At every 5 km from the premises, 2 km and at Truck Terminals about 70 number of direction name Boards have been installed in the Truck Terminal premises with a grant of about 28.00 lakhs by the Karnataka State Habitat Centre.
Way Forward
- To construct Truck Terminal/Logistic Parks/Highway amenities in Bengaluru, Mangalore, Raichur, Chitradurga, Gadag, Bijapur, Hassan, Bidar, Belgavi and other districts of Karnataka, the Deputy Commissioners of the concerned districts have been requested for allotment of required lands.
§ 10.2.3Infrastructure Development, Ports and Inland Water Transport
An amount of Rs 1008.33 crores is allocated for the Infrastructure Development Ports and Inland Water Transport for 2025-26, of which an amount of Rs.661.77 crores is released upto 15th January 2026. The expenditure incurred is Rs.657.45 crores (Avalokana).
I. Airport Projects
Karnataka State Industrial & Infrastructure Development Corporation Limited (KSIIDC)
KSIIDC continued its proactive role in the promotion of infrastructure projects on Public Private Partnership basis, as a nodal agency for Bengaluru International Airport Project. Considering the initiatives taken up by KSIIDC in the infrastructure sector, its name was changed to “Karnataka State Industrial and Infrastructure Development Corporation Limited” with effect from November 22, 2010. Major developmental activities undertaken by the corporation during the year are as follows:
a. Kempegowda International Airport, Bengaluru
Kempegowda International Airport, Bengaluru (KIAB), the 3rd busiest airport in the country in terms of the passenger traffic, handled 41.88 million passengers during 2024-25. Domestic passenger traffic saw a 10% growth, reaching 36.05 million, while international passenger numbers surged by 25%, exceeding 5.83 million during 2024-25. The airport also processed over 5,00,000 metric tons of cargo during FY 2024-25 compared to 4,39,495 metric tons in FY 2023-24, representing a growth of over 14%. During 2025, KIAB received the prestigious 5-Star Airport Terminal Rating from Skytrax, a UK-based organization evaluating airports based on quality and passenger experience. This makes Terminal 2 the first and only airport terminal in India to achieve this recognition. It was also named the best regional airport in India and South Asia. As per the stand alone audited financial figures, Kempegowda International Airport Limited earned total revenue of Rs. 3732 Cr and achieved a profit after tax of Rs. 510 Cr for FY 2024-25 mainly due to the increase in passenger and expansion of operations at Terminal 2. This Increase in passenger growth has translated into higher revenues across all non-aero revenues reflecting a higher spend per passenger. b. Aviation Development including development of Airports & Heliports: KSIIDC is the Nodal Agency for the development of airports, airstrips, heliports, and water aerodromes across the State. It has undertaken the following aviation projects.
- KSIIDC facilitated the completion and commissioning of the Kalaburagi Airport. The Airport Authority of India (AAI) has since taken over the operation and maintenance of the airport.
- The Civil Enclave at the Defence Airport in Bidar has been handed over to M/s GMR Hyderabad International Airport Limited (GHIAL) for operation and maintenance.
- The Shivamogga Airport, commercial flight operations commenced on 31.08.2023. IndiGo Airlines currently operates four commercial flights on the Bengaluru–Shivamogga sector. M/s Star Air commenced commercial operations on 15.11.2023 on three routes: Shivamogga–Hyderabad, Shivamogga–Goa, and Shivamogga–Tirupati, Furthermore, M/s SpiceJet launched commercial flights on 16.09.2024 in two routes: Hyderabad–Shivamogga–Chennai and Chennai–Shivamogga–Hyderabad.
- Construction of the Vijayapura Airport is designed for the operation of Airbus A320 and equivalent aircraft. Estimated cost of Package–1, Package–2 and Package–3 are Rs.222.92 crore, Rs.86.24 crore and Rs.19.39 crore respectively. All Civil & Electrical works were completed on 31.05.2025, expect testing and commissioning of equipments. Physical and financial progress is 99.70% and 99.60% respectively.
- An airport is being developed by the Indian Navy under the Sea Bird Project at Karwar, designed to accommodate Airbus A320 and equivalent aircraft. Additionally, 97.10 acres of land are being acquired for the runway extension and development of the Civil Enclave at an estimated cost of Rs.98.24 crore. A consultant was appointed to oversee the runway extension and airside works, which have since been completed.
- Hassan Airport is being developed about 536 acres of land near Bhuvanahalli Village in Hassan Taluk and is designed to accommodate aircraft equivalent to ATR-72. KSIIDC is executing development of Hassan Airport on EPC mode at a total estimated cost of Rs.193.65 Cr. The physical and financial progress of the project is 70.2 and 64.2 percent respectively and it is expected to be completed by March 2026.
- The Raichur Airport is being developed to accommodate ATR-72 and equivalent aircraft, with a total estimated cost of Rs. 219 crore. The project has achieved 16.85% physical progress and 12.10% financial progress, the project is expected to be completed by December 2026.
- On the basis of feasibility and detailed project reports submitted by the Pawan Hans Limited, KSIIDC has submitted a proposal to Govt along with the estimate of Rs.41 crore for the development of two heliports at Hampi and Kodagu, on 20.08.2025 for administrative approval.
c. Development of Balepura Land
KSIIDC owns 11 acres and 23 guntas of land at Balepura Village, Bangalore Rural District, which is designated for airport-related development activities. In principle, it is approved to utilize approximately 10 acres of land. Tender process is in progress.
d. Development of land Situated at Hubballi-Dharward
KSIIDC owns a land parcel measuring 1 acre and 10 guntas, located at Rayapura Village, Dharwad District. KSIIDC entrusted M/s KPMG’s PMU team for conducting a pre-feasibility study and market demand assessment for the site. Based on the findings in the Market Demand Assessment Survey Report, the proposal was made to develop the site under a Mixed-Use Development model, combining retail and commercial usage by KSIIDC Based on the survey report of Revenue Department, the designs have been submitted by the consultants.
e. TRUMPET LAND –Development of Land Parcels on NH 44 at Devanahalli
KSIIDC owns 13 acres of land adjacent to National Highway (NH 44) – Bengaluru to Hyderabad / Trumpet Interchange near Kempegowda International Airport. Government has accorded in-principle approval to monetize these land parcels for the mixed use development. RFP document for “Selection of Consultant for Providing Transaction Advisory Services for Development Of Land Parcels Located On NH44 At Devanahalli, Bengaluru On PPP Mode” has been floated through KPP Portal on 24.04.2025. M/s Cushman & Wakefield India Ltd., have been appointed as Transaction Advisors. Agreement executed on 28.07.2025 and Feasibility Report is submitted.
f. Access Flyover
The State has approved the construction of a 2+2 lane access flyover at the Bengaluru Signature Business Park crossing to the existing NH-44 with an estimated project cost is Rs.184.16 crores, of which Rs.100 crores is from the State govt. and Rs.84.16 crores is the own resources of KSIIDC. The work is in progress and expected to be completed by 31.12.2026
g. Establishment of 66/11kV Substations for main Power supply to BSBP
The power supply arrangement for BSBP is planned under Phase-1, Package-2, involving the establishment of 2 nos. 66/11kV, 2x20 MVA Substations at BSBP with incoming power supplied through 66kV underground cables. KSIIDC decided to undertake the establishment of these substations on a self-execution basis. The letters of award(LOAS) were issued to M/s Mahaveer Electro-Mech Pvt. Ltd. for a total contract value of Rs. 126.08 crores. Construction works of 2 nos.66/11kV Substations at BSBP, laying of incoming power 66Kv underground cable from BIAL Substation to BSBP have been completed.
II. Railways Projects
To create an accessible, efficient, and integrated railway system that enhances connectivity, promotes balanced economic growth, strengthens freight and logistics efficiency, and enables seamless multimodal integration—positioning railways as the backbone of sustainable mobility and development in the State. An amount of Rs.600 crores has been allotted for these projects during 2025-26, of which Rs.463.47 crores has been released as on 31-12-2025. The expenditure incurred is Rs. 463.47 crores. Land acquisition process and construction works are under progress.
Achievements of Railway Projects
1) K-RIDE-ROB/RUB Project
The State Government has approved the construction of road flyovers/under bridges in the ratio of 50:50 basis with the Ministry of Railways for the removal of railway LC gates with a traffic count of more than 1 lakh TVUs. 51 works are in progress, with a total estimated cost of Rs.1375.40 crores, of which the State Government’s share is Rs. 803.39 crores. So far, Rs.671.49 crores have been released. An amount of Rs.50 crore is provided for 2025-26 to implement ROB/RUB Projects in the State, of which an amount of Rs.25.91 crores has been released upto Dec 2025 to construct ROB and RUBs. The expenditure incurred is Rs.25.91 crores.
2) Cost Sharing Railway Projects
An amount of Rs.350 crore is provided for 2025-26 to implement Railway Projects in State on 50:50 cost sharing basis with Ministry of Railways. Out of Rs.350 crore, amount of Rs.250 crores is released by GOK and expenditure incurred is Rs.250 crores up to Dec 2025. At present 9 New Railway line are under implementation. These Projects would accelerate the industrial and economic development of respective regions and provide much needed rail connectivity to the farmers, industrialists, traders and tourists. These projects are also helpful in goods transportation and services. Details are given in Appendix 10.3.
2) Cost sharing Railway projects- Acquisition of land
In 2025-26 Budget, Government of Karnataka has been provided a sum of Rs.250.00 crore to implement Railway Projects in State on 50:50 Cost sharing basis with Ministry of Railways and also to provide required land at free of cost to Railways by State Government. Out of Rs.250 crore, an amount of Rs.187.56 crore has been released by GOK and expenditure incurred is Rs.187.56 crore upto December 2025. At present the following 7 New Railway line are under implementation. Details are given in Appendix 10.4. Bengaluru Suburban Railway Project: Bengaluru Suburban Railway Project is being implemented through the joint collaboration of Government of Karnataka and the Ministry of Railways at an estimated cost of Rs.15767 crore. It is intended to build a 148 km long railway network with 57 railway stations. BSRP aims to connect Bengaluru city to its suburbs and satellite townships and will carry about 9.84 lakhs passengers per day upon completion. Thus, decongesting the road traffic of Bengaluru city. BSRP is the first project in India which is being implemented under National Suburban Rail Policy, 2018. Project was sanctioned by the Govt of India through Ministry of Railways on 21st Oct 2020. Details are given in Table 10.23.
| Corridors | Project | Length (in Kms) |
|---|---|---|
| 1 | Bengaluru - Devanahalli + Airport Connectivity | 41.40 |
| 2 | Baiyappanahalli – Chikkabanawara | 25.01 |
| 3 | Kengeri – Whitefield | 35.52 |
| 4 | Heelalige – Rajanukunte | 46.24 |
| Total | 148.17 |
Administrative approval has been given for the works of Corridor-2 and Corridor-4 at a revised estimated cost of Rs. 16,876.00 crores. The tender process for Corridor-2 is in the final stage and the works are scheduled to be completed by December 2028. The tender process for Corridor-4 is in progress and is scheduled to be completed by March 2029. This project will also include railway doubling project. For Corridor-1 and Corridor-2, the process of land acquisition is in progress.
- YProgress in the Corridor-2 & 4
a. Corridor-2: Chikkabanawara to Baiyappanahalli (25.2 km) awarded on26.08.2022. Railway land leased to KRIDE, 70% of land acquisition is completed. 30% Physical progress is achieved. b. Corridor-4: Heelalige to Rajanukunte (46.22 km) awarded on 30.12.2023. Pre- Construction activities such as Survey, utility shifting, alignment, designs, geotechnical works, minor bridges, retaining wall etc are taken up. 12% Physical progress is achieved. The amount released by the MoR and GoK is Rs.2255.42 (MoR: Rs.500 Cr & GoK: Rs.1755.42 Cr) and the entire amount is utilized as on on 31.12.2025 is Rs.2255.42 crore. Railway Doubling Projects: Yeshwantpur-Channasandra and Baiyappanahalli-Hosur being single line was the primary impediment to operate additional sub-urban train services from Yeshwanthpur and Bengaluru railway station. State Government is trying to resolve this problem by doubling these lines duly sharing the cost of this project with railways on 50:50 ratio. These works are being implemented by K-RIDE, a joint venture between the Government of Karnataka and the Indian Railways. 1) Bayappanahalli-Hosur Doubling Project (42 km): The estimated cost of the project is Rs.498.73 crore, of which the State Government’s share is Rs.249.36 crore.The revised estimate of Baiyappanahalli-Hosur Doubling project at total cost of Rs.1,160.77 Cr has been submitted to SWR (South Western Railway) for sanction. Work is in progress and expected to be completed by the end of Feb-2027. Financial and physical progress of the project as on 31-12-2025 is 88% and 90%. 2) Yeshwanthpur-Channasandra Doubling Project (22 km): The estimated cost of the project is Rs.314.10 crore of which the State Government’s share of Rs.157.05 crore. The revised estimate of Yeshwanthpurchannasandra Doubling project at a total cost of Rs.683.57 Cr has been submitted to SWR for sanction. Work on the project is in progress and expected to be completed by the end of the year Mar-2027. Financial and physical progress of the project as on 31-12-2025 is 45% and 52%. Way forward
- Infrastructure Expansion & Modernisation - Enhance network capacity and connectivity by commissioning new rail lines, undertaking gauge conversions, doubling and electrifying high-density routes—including the Ramanagaram–Mysuru section—and introducing new passenger services, including high-speed and semi-high-speed trains, to meet future passenger and freight demand efficiently and sustainably.
- Inter-State & Port Connectivity - Strengthen rail links to ports and neighbouring states to support industrial growth, exports, tourism, and regional economic integration.
- High-Speed Corridor Planning - Identify priority high-speed and semi-high-speed corridors and undertake feasibility studies and Detailed Project Reports (DPRs) for phased implementation.
- Freight & Logistics Growth - Build on record freight loading by strengthening freight corridors, developing logistics parks and private freight terminals, and increasing capacity for cargo wagon utilisation, including alongside passenger train operations.
- Bengaluru Suburban Rail Project (BSRP) - Accelerate implementation of the Bengaluru Suburban Rail Project through close coordination among stakeholders to significantly improve urban and peri-urban mobility.
- Multimodal Integration under PM Gati Shakti - Integrate railway infrastructure with highways, ports, airports, and logistics hubs to enable seamless multimodal connectivity and efficient movement of people and goods.
- Station Redevelopment & Urban Integration - Modernise stations under the Amrit Bharat Station Scheme and promote station-centric development to enhance passenger amenities, accessibility, and urban integration.
- Last-Mile & Rural Connectivity - Improve last-mile rail connectivity to rural, semi-urban, agricultural, and industrial areas through sidings, feeder routes, and improved station access.
- Safety & Operational Modernisation - Enhance safety through elimination of level crossings, construction of ROBs/RUBs, deployment of modern signalling and train protection systems, and fencing in high-density sections.
- Green & Sustainable Railways - Promote energy efficiency and sustainability through electrification, renewable energy adoption, water conservation, and waste management initiatives.
III. Ports and Inland Water Transport
The State of Karnataka possesses an extensive coastline of approximately 320 km, which plays a pivotal role in maritime trade and commercial activities. The State’s maritime infrastructure currently comprises one Major Port and 13 Minor Ports. New Mangalore Port is the sole Major Port in the State and functions under the direct administrative jurisdiction of the Ministry of Shipping, Government of India. A total of 13 Minor Ports are operational under the administrative control of the State Government. Among the 13 Minor Ports, international trade operations (Import and Export cargo handling) are currently restricted to the Karwar and Old Mangalore ports. The remaining Minor Ports are predominantly utilized for fishing-related activities and local maritime requirements.
1. Financial performance and Revenue
The Department of Ports and Inland Water Transport has achieved significant revenue generation through maritime operations and land lease rentals. The performance highlights are as follows:
- YFiscal Year 2024-25: During this financial year, a total of 6.07 lakh Metric Tonnes (MT) of cargo was handled across the State’s Minor Ports. The department remitted a total revenue of Rs.23.80 Crore to the government exchequer, accrued from maritime activities, land leases, and inland water transport services.
- YFiscal Year 2025-26: For the period spanning April 2025 to December 2025, the total cargo handled stood at 4.54 lakh Metric Tonnes. The department remitted a total revenue of Rs.11.35 Crore to the government exchequer, accrued from maritime activities, land leases, and inland water transport services.
2. Developmental works and utilization of grants
The Government has been consistently allocating funds to enhance port infrastructure across the State. The details of the grants provided and their utilization are as follows:
- YDevelopment during 2024-25: In the fiscal year 2024-25, a total grant of Rs.57.50 Crore was earmarked for the infrastructure development of Minor Ports. Out of this allocation, various developmental projects amounting to Rs.20.44 Crore were successfully implemented.
- YProgress during 2025-26 : For the current financial year, a substantial outlay of Rs.74.36 Crore has been provided to further development works. As at the end of December 2025, an expenditure of Rs.10.93 Crore has been incurred towards various projects currently in different stages of execution.
3. Port Development And Karnataka Maritime Development Policy – 2024
To incentivize large-scale investments in the maritime sector and facilitate the creation of advanced infrastructure, the Government promulgated the ‘Karnataka Maritime Development Policy – 2024’ on January 4, 2025.
Vision
- To transform the State of Karnataka into India’s most technologically advanced, sustainable, and competitive Maritime Hub.
- To fortify the Blue Economy through the establishment of world-class infrastructure, thereby driving comprehensive economic growth across the coastal region.
Mission
- Private Sector Participation: To attract capital investments exceeding Rs.4,000 Crore in the maritime sector through the Public-Private Partnership (PPP) model.
- Modernization of Ports: To develop the State’s Minor Ports into Greenfield Ports and significantly augment existing cargo-handling capacities.
- Eco-friendly Transportation: To alleviate pressure on road networks by expanding Water Metro services and reinforcing the inland water transport framework.
- Tourism Infrastructure: To achieve global recognition for coastal tourism by constructing internationalstandard Cruise Terminals and Floating Jetties.
4. Shoreline Management Plan (Smp)
To facilitate coastal protection and ensure sustainable development, the State Government is implementing the Shoreline Management Plan (SMP) based on scientific parameters. The procurement of Coastal Regulation Zone (CRZ) clearance is mandatory for any developmental activities within the coastal tracts. Pursuant to the order passed by the Hon’ble National Green Tribunal (NGT), Chennai Bench, the preparation of a Shoreline Management Plan is an essential prerequisite for granting CRZ clearances. Plan Formulation: The Government of Karnataka, in coordination with the Karnataka State Coastal Zone Management Authority (KSCZMA), entrusted the task of drafting the SMP to the National Centre for Sustainable Coastal Management (NCSCM), Chennai. The NCSCM has since submitted the SMP report to KSCZMA, and Detailed Project Reports (DPRs) are currently being formulated in accordance with the guidelines stipulated in this report. District-wise DPR Preparation and Allocation of Grants: In 2024, administrative approval was accorded for Rs.300.00 Lakh towards consultancy services for the preparation of DPRs for anti-sea erosion and coastal protection works across the following 3 districts. Namely, Dakshina Kannada: Rs.100 Lakh, Udupi: Rs.80 Lakh and Uttara Kannada: Rs.120 Lakh.
Current Progress
- YUdupi and Dakshina Kannada: Consultants have been officially on boarded for these districts. Data acquisition and preliminary technical studies are currently in progress. The finalized DPRs will be submitted to the competent authority shortly.
- YUttara Kannada: The initial tender process for the appointment of consultants did not elicit any bids. Consequently, a re-tendering process has been initiated to secure consultancy services.
5. Development of Karwar Port
As the State’s premier commercial Minor Port, Karwar Port is undergoing significant modernization and capacity augmentation. To ensure the safe navigation of large vessels and facilitate efficient cargo handling, dredging operations have been initiated to maintain a depth of 8.00 meters in the port’s Turning Circle, Basin, and Channels. A total budgetary outlay of Rs.40 Crore has been allocated for this project. Under the Centrally Sponsored Sagarmala Scheme, specialized infrastructure is being developed for the safe handling of ‘Class-B’ petroleum products at Karwar Port. In compliance with the Oil Industry Safety Directorate (OISD)–156 guidelines, the installation of advanced fire-fighting equipment has been physically completed at an estimated cost of Rs.19.00 Crore. The project has secured the mandatory ‘No Objection Certificate’ (NOC) from the Petroleum and Explosives Safety Organization (PESO) on November 25, 2025. An expenditure of Rs.14.40 Crore has been incurred to date, demonstrating steady financial progress in line with project milestones. To safeguard the maritime environment from potential oil spills and pollution, a project for the Operation and Maintenance (O&M) of existing oil pollution control equipment has been commissioned. This initiative, valued at Rs.6.50 Crore, covers a service period of three years. 6. Public-Private Partnership (PPP) Projects To optimize the economic potential of the State’s coastline and attract substantial capital investments, several landmark projects have been initiated under the Public-Private Partnership (PPP) framework. a. Keni Port Development: This project involves the development of a state-of-the-art Greenfield Port at Ankola in the Uttara Kannada district. The port is being developed at a total cost of Rs.4,118.00 Crore with a projected cargo-handling capacity of 30 MTPA (Million Tonnes Per Annum). Preliminary studies are currently in progress. A Public Hearing was successfully conducted on August 22, 2025, and the final Environmental Impact Assessment (EIA) report is currently awaited. b. Pavinakurve Port Development: A Greenfield port with a capacity of 14 MTPA was originally envisioned at Pavinakurve with an estimated investment of Rs.3,047.00 Crore under the PPP model. Despite inviting tenders on three occasions, the process did not elicit any bids. Consequently, the project is now being transitioned to the New Mangalore Port Authority (NMPA) to be developed as an independent port. c. Manki Port Development: A Feasibility Report for the comprehensive development of Manki Port has been prepared by IIT Madras. To enhance operational efficiency, a dedicated rail link is essential; in this regard, the Konkan Railway Corporation Limited (KRCL) is currently preparing a Detailed Project Report (DPR) for rail connectivity. d. Jalmetro (Water Metro) Services: To modernize the urban transportation network of Mangaluru and leverage its riverine routes, Jalmetro services are proposed for the Gurupura and Netravati rivers. A Transaction Advisor has been appointed for the project, and the draft report submitted by them is currently under review. e. Management of Port Berths – ROMT Model: The Government has accorded approval to manage berths at selected ports under the PPP model on a Rehabilitation, Operation, Maintenance, and Transfer (ROMT) basis. Identified Ports are: (i) Karwar, (ii) Old Mangalore(Bendre Side), (iii) Old Mangalore (City Side), and (iv) Malpe. Necessary administrative measures are being taken to appoint Concessionaires through a competitive tendering process. f. Comprehensive Development of Islands: Strategic steps have been initiated to develop islands in the Uttara Kannada district to bolster coastal tourism. Seven major islands have been identified for development, and a Geographic Information System (GIS)-based Master Plan has been finalized. A Transaction Advisor has been on boarded. Action is being taken to present the TFER, RFP(Request for proposal), and DCA(Draft Concession Agreement) reports before the PPP Appraisal Committee (PPAC). g. International Cruise and Tourism Port (ICTP): An International Cruise and Tourism Port of global standards is proposed for development in the Dakshina Kannada district. IIT Madras has submitted the draft feasibility report, and subsequent proceedings are being initiated based on the recommendations therein. 7. Centrally Sponsored Sagarmala Project To augment infrastructure at major and minor ports, promote maritime cargo and passenger transport, and develop national waterways, the Ministry of Shipping, Government of India, has implemented the Centrally Sponsored Scheme (CSS) under the Sagarmala program. In the State of Karnataka, a total of 26 projects with an aggregate outlay of Rs.1085.16 Crore have been approved by the Union Ministry of Shipping. The details of the key projects are as follows: 1. Construction of a 350-meter Coastal Berth at Old Mangalore Port: Estimated Cost of the project is Rs.65.00 Crore. The project has achieved 90% physical completion. Key components including the deck slab, overhead tank, warehouse, and approach roads are finished. Cumulative expenditure stands at Rs.57.79 Crore, with a target completion date of March 2026. 2. Installation of Fire-Fighting Equipment at Karwar Port: Estimated Cost of the project is Rs.19 Crore. The project is physically completed. The mandatory NOC from PESO (Petroleum and Explosives Safety Organisation) was obtained on November 25, 2025. Total expenditure incurred is Rs.14.40 Crore. 3. Development of Kali River Waterway (NW-52): Estimated Cost of the project is Rs.14.46 Crore. Under the first phase, a floating jetty has been installed near Sadashivgad at a cost of Rs.2.70 Cr. Phase-2 has received approval under Sagarmala; the process to obtain CRZ and Environmental Clearances is currently in progress. 4. Development of Tadadi-Aghanashini Ferry Service: Estimated Cost of the project is Rs.24.10 Crore. Civil works commenced on December 26, 2024, and are currently in the execution stage. 5. Construction of Modern Fishing Harbour at Majali: Estimated Cost of the project is Rs.250 Crore (under Pradhan Mantri Matsya Sampada Yojana - PMMSY).The Detailed Project Report (DPR) has been formally submitted to the National Fisheries Development Board (NFDB) for approval. 6. Development of Cargo & Cruise Terminal at Old Mangalore Port: Estimated Cost of the project is Rs.75.75 Crore (inclusive of a dedicated jetty for Lakshadweep). An Environmental Public Hearing was successfully conducted on December 10, 2025. 7. Other Key Sagarmala Projects
- Bengre Beach Development: CRZ (Coastal Regulation Zone) clearance has been obtained for this Rs.10.00 Crore project; implementation is expected to commence shortly.
- Gurupura Nadugudde Island Development: Estimates for eco-friendly floating jetties (outlay Rs.8.50 Crore) are currently being revised.
- Gurupura-Netravati Waterway: The environmental hearing for this Rs.29.62 Crore project is completed.
- Almatti-Bagalkot Waterway: The land transfer process for this Rs.13.85 Crore project is currently underway.
- Floating Jetties: Out of 11 sanctioned jetties, administrative measures have been initiated for the execution of 8 units.
Sea Erosion Protection Works
To mitigate the impact of severe sea erosion across the coastal districts of Dakshina Kannada, Udupi, and Uttara Kannada, and to safeguard human settlements and vital infrastructure, the Department is implementing various scientific protection measures. During the financial year 2024-25, a total of 2,285 meters of sea erosion protection walls were successfully constructed at highly vulnerable locations across the three coastal districts incurring an Expenditure of Rs.28.57 Crores. An amount of Rs.15.00 Crore has been allocated for these works d uring financial year 2025-26 (Up to December 2025). Construction of 600 meters of sea erosion protection walls has been completed during the current fiscal year as of the end of the third quarter incurring an expenditure of Rs.7.50 Crores upto Dec-2025. National Disaster Response Fund (NDRF) and National Disaster Mitigation Fund (NDMF): In accordance with the recommendations of the 15th Finance Commission, specialized financial mechanisms National Disaster Response Fund (NDRF) & National Disaster Mitigation Fund (NDMF) have been operationalized for the scientific and long-term resolution of sea erosion. To initiate permanent remedial measures in high-risk zones, Detailed Project Reports (DPRs) have been prepared and submitted for administrative processing:
- YDakshina Kannada and Udupi Districts
- Urgent intervention works under Phase-1 have been prioritized.
- An allocation of Rs.100 Crore each has been earmarked for these districts, and comprehensive DPRs have been finalized.
- The DPRs have been formally submitted to the Karnataka State Disaster Management Authority (KSDMA) through the respective District Administrations for necessary approval and implementation.
- YUttara Kannada District
- A rough estimate amounting to Rs.100 Crore has been prepared for Phase-1 emergency works.
- The proposal has been submitted via the District Administration to the KSDMA for further administrative clearance and execution.
Inland Water Transport Ferry Services: To facilitate seamless public transit across the State’s rivers and backwater regions, ferry services are being effectively managed and operated under the Inland Water Transport (IWT) framework. Currently, a total of 67 ferry and boating service points are operational across the State. A total of 09 ferry services are directly managed by the Department through the deployment of departmental mechanized vessels. 28 ferry services are operated through a public auction and lease process, functioning under the technical supervision and regulatory oversight of the Department. The remaining 30 ferry points are managed and operated by Zilla Panchayats, the Department of Tourism, the Forest Department, and various private organizations. Inventory of Vessels: To ensure efficient and safe operations across various ferry points, the Department maintains and deploys a diverse fleet of vessels(Landing Craft Tank (LCT), Mini LCT Fiberglass, Mechanized Boat Mechanized Steel Boat, Wooden Dumb Boat, OBM (Outboard Motor), Fiberglass Boat and Aluminium Boat). Revenue Performance: For the current financial year 2025-26 (from April 2025 to December 2025), the Karnataka Maritime Board has collected a total revenue of Rs.0.65 Crore from ferry service operations.
Bangalore Metro Rail Corporation Limited (BMRCL)
In order to augment to the public transportation in Bengaluru and also to reduce the pressure of traffic, Metro Rail has come up in Bengaluru. It is a vital component of the transformation of the urban transport scenario. With urban population continuously growing, there is a need for green solutions. Mass Rapid Transit Systems are fast, safe and comfortable to travel. This alone will encourage people to switch over from personalized vehicles to public transport. Bangalore Metro Rail Project Phase-1 having a total track length of 42.3 Kms, is already running from 2011. East to West from Bayyappanahalli to Mysuru Road (18.10 Kms) and North to South from Nagasandra to Yelachenahalli (24.20 Kms). Bangalore Metro Rail Project Phase-2 consists of Extensions to 4 existing lines of Phase-1 and 2 New Lines. The total length of Phase-2 is 75.06 Kms with 61 stations (49 Elevated and 12 Underground). The estimated project cost is Rs. 30,695 Cr. Presently, 53.80 Kms is completed and commissioned. 7.50 Kms length of elevated section in Reach-6 from Kalena Agrahara to Tavarekere is scheduled to be opened in May-2026. 13.76 Kms Underground section in Reach-6 is scheduled to be opened in December-2026. Physical and Financial progress as on December-2025 is 95.10% & 92.99% respectively.
Bangalore Metro Rail Project Phase-2A and 2B
Phase-2A and 2B from Central Silk Board to Kempegowda International Airport is having a length of 58.19 Kms with 29 Stations. GoI has approved the project on 07.06.2021 with an estimated cost of Rs. 14,788.10 Cr. As on Dec-2025, combined Financial progress for Phase 2A & 2B is 62.98% and Physical progress of Phase- 2A is 80.00% & Phase-2B is 54.00%. The Project Phase-2A having a length of 19.75 Kms is programmed to be completed by December-2026 and Phase-2B having a length of 38.44 is programmed to complete in two stages, 27.44 Kms from Hebbal to Airport in June-2027 and 11.00 Kms from Krishnarajapura to Hebbal in December-2027.
Bangalore Metro Rail Project Phase-3
Phase-3 is having a length of 44.65 Kms with 31 Stations, this phase comprises of J.P. Nagar 4th Phase to Kempapura (32.15 Kms with 22 Stations) and Hosahalli to Kadabagere (12.50 Kms with 9 Stations). GoI has approved the project on 13.09.2024 with an estimated cost of Rs. 15,611 Cr. This Phase is having a Double Decker with elevated 4-lane road at level-1 & Metro at level-2. GoK has approved the Double Decker project on 10.09.2025 with a total project cost of Rs.9700 Cr. for 37.121 Kms. Presently, preliminary works like Land acquisition, Trees clearances, Utilities Shifting are under progress and Civil Tenders will be floated shortly.
Proposed Project
Bangalore Metro Rail Project Phase-3A
Sarjapura has developed very fast with lot of residential layouts and industries coming around Sarjapura. To address the travel needs of this area, 36.59 Kms (22.14 Kms Elevated & 14.45 Kms UG) of Metro is being planned from Sarjapura to Hebbal along Agara, Kormangala, Dairy Circle and Mekhri Circle. DPR is approved by GoK on 10.01.2025 and submitted to GoI for approval.
§ 10.2.4Telecommunication
The telecommunication system in the State is operated by both private and public sector undertakings. Apart from BSNL, a number of private companies like Vodafone Idea Ltd., Reliance Jio Infocom Ltd., Bharati Airtel Ltd, MTNL, Reliance Communications Ltd/Reliance Telecom Ltd etc. are providing the wireless and wireline phones. The wireless (Mobile) teledensity (both BSNL and private cellular operators) in the southern states is presented in Table 10.24. Karnataka stands in 1st position among the southern states in Urban tele density.
| Service Area | Total Teledensity | Rural Teledensity | Urban Teledensity |
|---|---|---|---|
| Andhra Pradesh | 79.23 | 71.01 | 92.62 |
| Karnataka | 101.69 | 70.69 | 138.60 |
| Kerala | 115.61 | 258.65 | 81.11 |
| Tamil Nadu | 99.03 | 69.11 | 123.68 |
| Telangana | 104.45 | 83.21 | 125.87 |
| All India | 82.53 | 58.47 | 125.19 |
The number of Internet subscribers in southern states(in million) is presented in Table 10.25.
| Southern states | Rural | Urban | Total |
|---|---|---|---|
| Andhra Pradesh | 18.28 | 18.67 | 36.95 |
| Karnataka | 22.32 | 41.78 | 64.10 |
| Kerala | 17.99 | 19.80 | 37.79 |
| Tamil Nadu incl. Chennai | 19.07 | 46.90 | 65.97 |
| Telangana | 13.34 | 23.91 | 37.25 |
The number of landline connections and telephone exchanges has declined significantly. The decline in landlines can be partly attributed due to increased private participation in the mobile telephony sector and switchover to mobile phones.
§ 10.3Banking and Finance Including Cooperatives- 2025-26
§ 10.3.1Introduction
Karnataka State has a fairly well-developed financial infrastructure. The State has pioneered in establishment of many leading commercial banks and is home to a wide network of commercial bank branches in the country. Currently, 12 Public Sector Banks, 21 Private Commercial Banks, 1 Regional Rural Bank, 1 Apex Cooperative Bank, 21 DCC Banks, 1 KSCARD Bank, 1 KSFC, 8 Small Finance Banks, 3 Payment’s Banks and 1 Local Area Bank are operating in the State. Disbursement of credit in rural areas takes place through these banks. National Bank for Agriculture and Rural Development (NABARD), as an apex level financial institution, plays a lead role in the promotion of agriculture and rural development, by preparing Potential Linked Credit Plans (PLPs) and annual action plans at the grass root level. A major portion of NABARD’s refinance and developmental initiatives are channelized through the banking sector.
§ 10.3.2Karnataka- Banking Scenario
An overview of the position of the banking network and ATM network in Karnataka during the previous years is shown below Table 10.26.
| Category | Branch Network | ATM Network | ||||||
|---|---|---|---|---|---|---|---|---|
| March 2023 | March 2024 | March 2025 | Sept. 2025 | March 2023 | March 2024 | March 2025 | Sept. 2025 | |
| Rural | 4293 | 4341 | 4417 | 4449 | 2169 | 2117 | 2116 | 1949 |
| Semi Urban | 2731 | 2806 | 2856 | 2885 | 3401 | 3383 | 3401 | 3210 |
| Urban (including Metro/PT) | 4977 | 5114 | 5262 | 5325 | 11408 | 11562 | 10927 | 10239 |
| Total | 12001 | 12261 | 12535 | 12659 | 16978 | 17062 | 16444 | 15398 |
§ 10.3.3Details of Unbanked Villages
Currently there are no unbanked villages in the state. The Department of Financial Services (DFS), GoI has identified two villages with populations over 3000 within 5 km, Madhawar in Gurmitkal Taluk and Kadakol in Shirahatti Taluk, as potential locations for opening Brick and Mortar branches. Category wise branch network across Karnataka over the past three years is shown in Table 10.27.
| Bank / Branch | March’ 2023 | March’ 2024 | March’ 2025 | Sept’ 2025 |
|---|---|---|---|---|
| Commercial Banks (33) | 8611 | 8767 | 8957 | 9054 |
| Regional Rural Banks (1) | 1750 | 1751 | 1751 | 1750 |
| KASCARD (1) | 205 | 203 | 209 | 209 |
| DCC Bank (K.S.co-op Apex Bk) (21) | 921 | 941 | 999 | 1010 |
| Karnataka Industrial Co-operative Bank (KICB)] (1) | *(38) | *(38) | *(38) | *(38) |
| Small Finance Banks (8) | 437 | 522 | 545 | 562 |
| Payment Banks (3) | 31 | 31 | 31 | 31 |
| Local Area Bank (LAB)(1) | 13 | 13 | 13 | 13 |
| KSFC (1) | 33 | 33 | 30 | 30 |
| Total | 12001 | 12261 | 12535 | 12659 |
§ 10.3.4Deposits and Advances
The category wise aggregate deposits and advances in the State along with the C-D Ratio (Credit-Deposit Ratio) is shown in the Table 10.28.
| Bank Category | Deposits | Advances | C-D Ratio | ||||||
|---|---|---|---|---|---|---|---|---|---|
| 2023-24 (March) | 2024-25 (March) | Sept. 2025 | 2023-24 (March) | 2024-25 (March) | Sept. 2025 | 2023-24 (March) | 2024-25 (March) | Sept. 2025 | |
| Commercial Banks | 1478805 | 1636774 | 1672765 | 1133629 | 1240833 | 1300249 | 76.65 | 75.81 | 77.73 |
| Regional Rural Bank | 54316 | 56069 | 54490 | 45270 | 48581 | 49874 | 83.34 | 86.64 | 91.53 |
| Cooperative Banks, small finance banks & payment banks | 69734 | 80270 | 77590 | 74312 | 80260 | 83054 | 106.56 | 99.99 | 107.04 |
| Total | 1602855 | 1773113 | 1804845 | 1253212 | 1369674 | 1433178 | 78.19 | 77.25 | 79.41 |
| Name of the District | As on March, 2023 | As on March, 2024 | As on March, 2025 | As on Sept, 2025 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Deposits | Advances | CD Ratio | Deposits | Advances | CD Ratio | Deposits | Advances | CD Ratio | Deposits | Advances | CD Ratio | |
| Utat ra Kannada | 20789 | 9003 | 43.31 | 22487 | 10139 | 45 | 24315 | 11322 | 47 | 24989 | 11619 | 47 |
| Udupi | 35260 | 16243 | 46.07 | 39108 | 18358 | 47 | 42593 | 20309 | 48 | 44610 | 21690 | 49 |
The main reasons for low CD (Credit-Deposit) ratio in Uttara Kannada district are 1.Limited Scope for Industrial Activities: CRZ Restrictions and Forest Area Restrictions hindering the industrial growth in Uttara Kannada District 2. Out of Total Geographical Area in the district, around 40% area is covered by Forest and 15% areas is under barren or unavailable for cultivation.
| Type of Banks | As on 30/9/2024 | As on 30/9/2025 | ||
|---|---|---|---|---|
| No. of Accounts | Amount | No. of Accounts | Amount | |
| Commercial | 1373367 | 41341.67 | 2134437 | 38299.56 |
| RRBs | 363122 | 5778.76 | 371877 | 6198.10 |
| Cooperatives/KSFC/KaSCARD | 43511 | 5371.69 | 391261 | 8867.96 |
| Total | 1780000 | 52492.12 | 2897575 | 53365.62 |
| Name of Bank | No. of Accounts | Amount |
|---|---|---|
| Total Agriculture (PS) | 1823777 | 21890.22 |
| Total MSMEs (PS) | 410120 | 10605.18 |
| Education (PS) | 15721 | 353.80 |
| Housing (PS) | 12596 | 673.88 |
| Other Priority (Export credit, Social Infrastructure, Renewable Energy, Other Priority Sector) | 182788 | 1366.69 |
| Total Priority Sector | 2445002 | 34889.76 |
| Total Non Priority Sector | 452573 | 18475.82 |
| Grand Total (Priority Sector + Non Priority Sector) | 2897575 | 53365.58 |
§ 10.3.5Aggregate Bank Deposits and Gross Credit in all States and UTs upto Sept. 2025
As per RBI quarterly statistics statement, Karnataka stands in 3rd position in terms of Aggregate Deposits and 4th in Gross Credit in India as shown in Table 10.32.
| State or UTs | Aggregrate Deposit | Rank | Gross Credit | Rank |
|---|---|---|---|---|
| Maharashtra | 53,39,965 | 1 | 52,39,373 | 1 |
| NCT of Delhi | 21,19,637 | 2 | 18,07,133 | 2 |
| Karnataka | 19,04,001 | 3 | 12,85,718 | 4 |
| Utat r Pradesh | 18,39,258 | 4 | 9,33,818 | 6 |
| Tamil Nadu | 15,16,416 | 5 | 17,63,000 | 3 |
§ 10.3.6Distribution of Priority Sector Advances
Advances made under various priority sectors in the State during the last three years is shown in Table 10.33.
| Indicator | March’ 2023 | March’ 2024 | March’ 2025 | September’ 2025 | ||||
|---|---|---|---|---|---|---|---|---|
| Advances | % to Total Advances | Advances | % to Total Advances | Advances | % to Total Advances | Advances | % to Total Advances | |
| Total advances | 1038003 | - | 1253213 | - | 1369674 | - | 1433178 | - |
| Total Priority Sector(PSA) * | 392945 | 43.91 | 449826 | 43.34 | 480994 | 38.38 | 529534 | 40.28 |
| Agriculture* | 192268 | 21.48 | 224055 | 21.59 | 238280 | 19.01 | 247080 | 18.80 |
| MSMEs | 143047 | 15.98 | 168990 | 16.28 | 188187 | 15.02 | 210368 | 16.00 |
| Weaker Sections | 139388 | 15.58 | 166212 | 16.01 | 171556 | 13.69 | 153842 | 11.70 |
§ 10.3.7Ground Level Credit Flow for Agriculture
Performance under Annual Credit Plan (ACP) during last 5 years is shown in Table 10.34.
| Particulars | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| Target | Ach. | Target | Ach. | Target | Ach. | Target | Ach. | Target | Ach. | |
| Crop Loan | 66018 | 69910 | 71923 | 61774 | 81896 | 79157 | 97995 | 111064 | 114625 | 126696 |
| Term Loan | 46181 | 56547 | 54069 | 57845 | 58977 | 80595 | 79474 | 72801 | 77576 | 74237 |
| Total Agri. | 112199 | 126457 | 125992 | 119619 | 140873 | 159752 | 177469 | 183865 | 192201 | 200933 |
| Percentage : Achievement to target | ||||||||||
| Crop Loan | 105.90 | 85.89 | 96.66 | 113.34 | 111.00 | |||||
| Term Loan | 122.45 | 106.98 | 136.65 | 91.60 | 96.00 | |||||
| Overall | 112.71 | 94.94 | 113.40 | 103.60 | 105.00 | |||||
Agricultural crop loan lending has shown resilience and improvement, with significant achievement levels reaching over 111% in 2024-25. Term loans contribute to stability, and the overall agricultural achievement has remained strong, exceeding 100% in four out of five years.
Annual Credit Plan 2025-26 and performance as on 30 September 2025
Considering the projections made by NABARD in the district-wise Potential Linked Credit Plans, budgetary formulations and on the basis of the ground level disbursements, the Annual Credit Plan (ACP) for agriculture for the year 2025-26, for the State of Karnataka has been fixed by SLBC at Rs. 222203 crore. Of the ACP target 2025-26, crop loan has been fixed at Rs.140108 crore and agriculture term loan at Rs. 82095 crore. As of 30 September 2025, crop loan disbursements stood at Rs.66,350 crore, representing 47% of the annual target. Disbursements under Agri Term Loans amounted to Rs.31,279 crore, achieving 61% of the annual target as shown in below Table 10.35.
| Sector | Annual target 2024-25 | Disbursement as on 31.03.2025 | % Ach | Annual target 2025-26 | ||||
|---|---|---|---|---|---|---|---|---|
| Comm. banks | RRBs | Coop Banks | Others | Total | ||||
| Agri and Allied | 192201 | 145004.58 | 28533.96 | 23989.01 | 3405.07 | 200932.63 | 104.54 | 222203 |
| MSME | 174242 | 152871.96 | 1876.32 | 2545.78 | 3202.34 | 160496.40 | 92.11 | 190890 |
| Export credit | 617 | 122.33 | 0 | 0 | 0 | 122.33 | 19.83 | 176 |
| Education | 1516 | 1482.65 | 96.72 | 2.78 | 0.28 | 1582.43 | 104.38 | 2222 |
| Housing | 7312 | 5012.11 | 151.72 | 234.90 | 458.92 | 5857.65 | 80.11 | 11678 |
| Social Infrastructure | 132 | 80.87 | 0 | 63.06 | 0 | 143.93 | 109.38 | 223 |
| Renewable Energy | 77 | 466.88 | 2.9 | 0.2 | 0 | 469.98 | 606.9 | 1005 |
| Others | 12279 | 2864.25 | 286.72 | 4112.24 | 1372.05 | 8635.26 | 70.33 | 9619 |
| Total | 388376 | 307905.64 | 30948.34 | 30947.96 | 8438.67 | 378240.60 | 97.39 | 438015 |
A. Refinance Support: NABARD offers short-term refinance to State Cooperative Banks, Regional Rural Banks, and approved financial institutions for activities related to agriculture, rural development, and small industries, including artisan and cottage industries. The various products through which NABARD extends this refinance is as follows: NABARD extends refinance to Cooperative Banks and Regional Rural Banks at a concessional rate of 4.5%. It also extends refinance to Scheduled Commercial Banks at the same rate for the ceded PACS. Additional Short Term Seasonal Agricultural Operations at a competitive rate has been introduced to address severe liquidity problems in cooperative banks. B. Short Term Credit for purposes other than crop production: NABARD provides Short Term refinance to Cooperative Banks and RRBs to meet various short-term credit needs of farmers, including crop marketing, fisheries support, and working capital for economic activities. It also extends Short Term refinance for handloom weavers and related organizations. C. Interest Subvention Scheme of the Government of India: NABARD implements the Government of India’s Interest Subvention Scheme for RRBs and Cooperative Banks, offering a 1.5% interest subvention on crop loans up to Rs. 3 lakh at a rate of 7% per annum along with a 3% incentive for promptly repaying farmers. D. The KCC Scheme, introduced in 1998-99 is a step towards providing hassle free, adequate and timely credit to the farmers from the banking sector. Progress under Kisan Credit Card Scheme in Karnataka is shown in Table 10.36.
| Name of the Agency | No. of KCCs as on 30.09.2025 | Amount (in crores) |
|---|---|---|
| Karnataka Grameena Bank | 930523 | 19341 |
| Cooperative Banks | 3000675 | 23735 |
| Grand Total* | 5073080 | 72961 |
E. NABARD acts as the Nodal Bank for the DFPD (Department of Food and Public Distribution) managing interest subvention to financially support projects aimed at boosting ethanol distillation capacity or setting up distilleries for 1st Generation (1G) ethanol production from feed stocks such as cereals and sugarcane. F. Investment Credit for Agriculture: NABARD offers long-term refinancing to banks to boost credit for farmers and rural artisans, supporting both agricultural and non-agricultural sectors. This facilitates capital formation and rural employment, while also meeting the credit needs of Joint Liability Groups (JLGs), Self-Help Groups (SHGs), and government subsidy schemes. G. Resources for Capital formation / Term Lending in Agriculture: NABARD assists banks and eligible agencies by refinancing credit for agricultural capital formation. The agency-wise details of term loan refinance in Karnataka over the last 5 years shown in Table 10.37.
| Agency/ Year | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 |
|---|---|---|---|---|---|
| Coop. Banks/KSCARDB | 1,745.01 | 1841.83 | 2816.30 | 2954.33 | 1676.59 |
| RRBs | 1,916.20 | 1452.83 | 2303.00 | 2322.34 | 1171.17 |
| NBFC/NBFC-MFI | 1078.01 | 1188.73 | 544.06 | 350.00 | 250.00 |
| Total | 4739.22 | 4483.39 | 5663.36 | 5626.67 | 3097.76 |
H. Apart from regular refinancing support, NABARD has innovatively revitalized the rural economy during the Covid-19 pandemic. Some of the special refinance schemes are as follows. i) Special Refinance Facility for World’s Largest Grain Storage: This initiative focuses on improving food grain storage and minimizing waste by evolving Primary Agricultural Credit Societies (PACS) into multifunctional entities. It enhances food security and boosts farmers’ pricing power, with the first phase successfully completed at Ekamba PACS in Karnataka and the second phase currently in progress. ii) Special Refinance Scheme under the PM Formalisation of Micro Food Processing Enterprises (PMFME): This scheme aims to enhance credit access for rural micro-food processing businesses, modernizing family-run enterprises and aiding their formal sector transition. It promotes sustainable livelihoods and women’s employment, offering long-term refinance at a concessional 4% interest rate through the Automatic Refinance Facility (ARF). iii) Special Refinance Scheme on Aspirational Districts and Credit Starved Districts: Under this scheme Raichur and Yadgir districts are eligible for special refinance of upto Rs. 1,000 Crore to RRBs & Cooperative Banks with 100 bps less than the prevailing interest rate. iv) Special Refinance Scheme on Deendayal Antyodava Yojana : National Rural Livelihoods Mission (DAY- NRLM): The interest rate on refinance is @4% for loans given to all women SHGs upto Rs.3 lakh with maximum interest rate of 7% p.a. and @3% for loans given from Rs.3 lakh to Rs. 5 lakh with maximum interest rate of 10% p.a. v) Special Refinance Scheme for Animal Husbandry Infrastructure Development: This scheme, implemented from 24 June 2020, offers a rate of interest 50 bps points lower than the prevailing rates for RRB and Cooperative Banks. It aims to address infrastructure gaps and mobilize investment in Animal Husbandry Infrastructure through the Animal Husbandry Infrastructure Development Fund (AHIDF) by the Department of Animal Husbandry & Dairying, Ministry of Fisheries, Animal Husbandry and Dairying, GoI. vi) Special Refinance Scheme for Rural Home Loans bundled with Solar Roof Top (SRT) with 0.5% rebate on prevailing interest for prompt repayment of principal & interest. vii) NABARD provides long-term loans to State Governments for contributing to the share capital of cooperative credit institutions including StCBs, DCCBs, PACS/FSS/LAMPS, SCARDBs, and PCARDBs. These loans are reimbursed at an interest rate of 5.80% per annum set by NABARD. viii) NABARD provides relief to farmers affected by natural disasters by converting short-term agricultural loans into medium-term loans and providing refinancing options. This support is available for damaged crops at an interest rate of 8.10% per annum. ix) Direct Refinance Assistance to DCCBs: During the FY current FY 2025-26, an amount of Rs.2100 crore has been sanctioned & Rs. 1702 crore has been disbursed till 19 December 2025.
§ 10.3.8RIDF assistance to Govt. of Karnataka
Rural Infrastructure Development Fund (RIDF), established in 1995-96 with an initial corpus of Rs. 2,000 crore, has expanded over 30 years to encompass 39 activities focused on rural infrastructure across three sectors: Agriculture and allied activities, Social Infrastructure, and Rural Connectivity. In Karnataka, 44,612 projects have been sanctioned under RIDF tranches I to XXXI, totaling Rs. 24,563.73 crore, with Rs. 19,800.70 crore disbursed to the State Government as of December 24, 2025 as shown in Table 10.38.
| Name of the Sector | No. of projects | Total Financial Outlay | Loan Sanctioned | Amount Disbursed |
|---|---|---|---|---|
| Agriculture and allied projects | 5522 | 3378.75 | 3271.76 | 1976.94 |
| Social sector projects | 21036 | 10591.11 | 6772.2 | 5684.89 |
| Irrigation projects | 5353 | 10006.37 | 7168.48 | 5646.67 |
| Rural roads and bridges | 12701 | 7227.60 | 7351.29 | 6492.21 |
| Total | 44612 | 31203.83 | 24563.73 | 19800.70 |
- The agriculture and allied sectors, rural connectivity, and social sector received 43%, 30%, and 27% respectively of the RIDF loans.
- In FY 2024-25, 299 projects were sanctioned with RIDF assistance of Rs. 2242.11 crore, exceeding the normative allocation of Rs. 2060.00 crore, and by March 31, 2025, Rs. 2408.11 crore was disbursed to the State.
- Under RIDF XXXI, as of December 24, 2025, 180 projects has been sanctioned with Rs. 1351.59 crore against a normative allocation of Rs. 1650.00 crore, with Rs. 583.34 crore disbursed.
§ 10.3.9Impact of RIDF in the State
Some of the outcomes under RIDF Projects in the state are increasing the state’s irrigation potential to 5.64 lakh hectares. Enhancement of Rural connectivity through strengthening and improvement of 45,972 km of rural roads and the construction of 58,874 meters of rural bridges. Development of 2,030 veterinary institutions, 262 rural godowns, 925 rural market infrastructures, 317 Raita Sampark Kendras, 33 fish jetties, and 12 fish farms/ponds in the agriculture and allied sector. Additionally, the social sector has seen support for 13,501 rural educational institutions and improvements in 345 public health institutions.
§ 10.3.10Micro Irrigation Fund (MIF)
Micro Irrigation Fund (MIF), initiated in the FY2020 Union Budget with a total corpus of Rs.10,000 crore, aims to enhance micro-irrigation coverage. It includes a 3% interest subvention by the GoI and additional state resources beyond the Pradhan Mantri Krishi Sinchayee Yojana —Per Drop More Crop. So far, Rs.290 crore in loan assistance has been sanctioned with Rs.257.06 crore disbursed thus benefiting 2.63 lakh farmers, including 1.97 lakh small and marginal farmers (75%).
§ 10.3.11NABARD Infrastructure Development Assistance (NIDA)
NIDA, a new credit support initiative by NABARD has allocated Rs. 2671.12 crore to support Jaladhare projects in four districts: Raichur, Dharwad, Vijayapura, and Mandya. This funding aims to benefit 3636 habitations, serving a population of approximately 71.87 lakh, by ensuring safe and sustainable drinking water at the household level. As of December 26, 2025, Rs. 2619.19 crore has been released to the Government of Karnataka for project execution.
§ 10.3.12Other Developmental Initiatives
- YFarmers Producers Organization (FPOs): Since 2014-15, NABARD Karnataka Regional Office has established 388 FPOs(387 registered) across 31 districts, supported by over 60 NGOs. 230,256 farmers participated in these FPOs, which have received Rs.76.23 crore in grants and mobilized Rs.23.95 crore in share capital. The FPOs focus on agri-horticultural production and marketing with some branching into high-value crops like chia seeds, coffee, tender coconuts, mango, turmeric, pepper etc. Additionally, NABARD collaborates with ONDC to enhance market linkages and promote e-commerce in agriculture.
- YTribal Resilience Initiative for Building Environmentally Sustainable livelihoods (TRIBES) : NABARD has been implementing integrated tribal development projects using the wadi model (small orchards up to one acre)in tribal areas since establishing the Tribal Development Fund in 2003-04. In Karnataka, 40 projects have been sanctioned with financial assistance of Rs.132.67 crore, benefiting 22,664 tribal families across 14 districts and covering 22,464 acres.
- YWatershed Development Fund: To combat drought in Karnataka, NABARD has sanctioned 356 Watershed Development(350 regular, 3 Springshed, 3 non-watershed standalone projects) & 3 JIVA projects Projects with Rs.276.37 crore in funding across 3.33 lakh hectares. This includes 35 ongoing projects aimed at improving groundwater levels, agricultural productivity and promoting modern farming practices. Additional 2 new projects are set to be sanctioned in January 2026. 2 watershed projects (Full Implementation Phase) and 1 springshed project (Project Implementation Phase) were sanctioned in December 2025.
- YStandalone Soil & Water Conservation Projects: Designed to share knowledge on soil and water conservation, sustainable farming, and climate change adaptation and risk mitigation in vulnerable districts, this initiative aims for the adoption of innovative conservation technologies and climateresilient practices. Additionally, three projects under non-watershed activities have been sanctioned with a financial assistance of Rs.59.39 lakh.
- YFarm sector Promotion Fund : Under the Farm Sector Promotion Fund (FSPF), NABARD implemented initiatives in the Kalyana Karnataka region from 2024-2025 to promote farmer-led value addition and market integration. This included establishing Farmers’ Training and Common Facility Centres (FT-CFCs) in all seven districts, with support from MPLADS. The efforts were focussed on district-specific processing, focusing on chilli in Ballari, pulses in Raichur, millets in Kalaburagi, groundnut in Yadgir, fruits and ginger in Koppal, peanut-based products and tamarind in Vijayanagara and soyabean-based products in Bidar.
- YClimate Change initiatives: NABARD serves as the National Implementing Entity for the Green Climate Fund, the National Adaptation Fund for Climate Change and the Adaptation Fund under UNFCCC. In partnership with EMPRI(Environment Management and Policy Research Institute) it approved a loan of Rs.180 crore for three biogas plants using by-products from the alcohol and sugar industries in Bagalkot and Belgaum districts. Additionally, NABARD financed Rs.2,50,000 for a conference on climate resilience through carbon credits and Rs.5,00,000 for the III Global Summit on Diamond Open Access.
§ 10.3.13Financial Inclusion Initiatives
Financial Inclusion Fund (FIF) has facilitated the development of financial inclusion infrastructure in Karnataka, with all 22 RCBs and 1 RRB now integrated into the CBS platform. This integration supports new payment systems like Aadhaar Pay, UPI, Micro ATM, and PoS. NABARD has also helped RCBs link to the Public Financial Management System (PFMS) for direct beneficiary payments. In FY 2025-26, Rs.785.74 lakh was released under FIF, with allocations including Rs.35 lakh for 613 Financial Literacy programs, Rs.2.08 crore to Cooperative Banks for deploying Micro ATMs and POS systems, Rs.3.08 crore to RRB under rural connectivity projects, and Rs.2.62 crore for 41 Centres for Financial Literacy in Karnataka.
§ 10.3.14Rural MSME initiatives under Gramya Vikas Nidhi (GVN)
i. Marketing Infrastructure : In the last seven years 61 rural marts and 28 rural haats have been set up in 21 districts with an investment of Rs. 549.39 lakh to improve market linkages for farm and off-farm producer organizations and self-help groups (SHGs). ii. Skill Development: Through skill development initiatives, NABARD has invested Rs. 339.06 lakh in this sector since last 6 years to upskill over 4300 individuals, primarily youth and women in various areas including weaving, solar panel installation, health care, computer-based skills, farm machinery repair and maintenance, banking, financial services, insurance, panchakarma therapy, yoga fundamentals. Approximately 80% of trainees have secured jobs or started their own businesses. iii. Collectivisation- Off Farm Producer Organisations (OFPOs): Since 2021, NABARD has provided grant support of Rs.394.63 lakh for the establishment of five OFPOs benefiting 1550 artisans in Handloom (Fabric Weaving and Natural Dye) and Handicrafts (Kasuti Work, Channapatna Toys, Kolhapuri Leather Footwear, and Aari embroidery) across Shimoga, Dharwad, Ramanagara and Belgaum districts. Three of these OFPOs focus on GI tagged products including Channapatna toys, Kasuti, and Kolhapuri chappals. iv. Infrastructure through the DPR Scheme: Initiated in 2021-22 by NABARD. This scheme aims to support location-specific developmental projects in the off-farm sector. NABARD has approved two projects under this scheme providing a total financial assistance of Rs. 41.76 lakh for Gulbarga and Uttara Kannada districts. v. Interventions under Geographical Indication (GI): Interventions for the Geographical Indication (GI) registration of various products including Kari Ishad Mango. Hoysala-style Stone Art, Tiptur Coconut, Sanikatta Salt, and Kumbi Mudli Tuber have received Rs.8.36 lakh in approval from NABARD. An additional Rs.9.13 lakh has been granted for post-GI actions such as organizing exposure visits for GI-tagged Ilkal Saree and Guledagudda Khana craftsmen, registering authorized users and developing a website for GItagged Udupi sarees.
§ 10.3.15Status of SHG and JLG in Karnataka
Karnataka has been a key participant in the SHG Bank Linkage Programme implementing the National Rural Livelihood Mission (NRLM) as the Karnataka State Rural Livelihood Mission (KSRLM). This initiative aims to create sustainable livelihoods for the rural poor living below the poverty line within 5 to 7 years. Key components of the program include regular savings, book keeping, internal lending and bank credit support. As on 31 March 2025, a total no of 9,24,321 SHGs were saving linked with Rs.3049.67 crore. During 2024-25, 6,31,007 SHGs were credit linked in tune of Rs.22143.59 crore.
§ 10.3.16Activities undertaken by NABARD
Micro Entrepreneurs Development Programme (MEDP) for SHG members, Livelihood Enterprises Development Programme for SHGs for income generation, grant support to Banks and NGOs for formation and credit linkage of SHGs and JLGs, sanctioning of mobile rural mart (mobile van) to FPOs in Ballary, Vijayapura, Raichur, Koppal and Kalaburagi districts.
§ 10.3.17Institutional Development
(i) NABARD holds quarterly High-Level Committee meetings led by the Secretary of the Department of Cooperation, Government of Karnataka, to assess the financial health of rural cooperative institutions, focusing on key parameters like NPA, Share Capital, weak bank positions, capital Infusion, supervisory concerns, fraud incidents and governance issues in RCBs.During 2025-26, two HLC meetings were held on 31st July 2025 & on 25th November 2025 and also District Level Monitoring and Review Committee (DLMRC) were held at quarterly intervals. (ii) NABARD provides various support through the Cooperative Development Fund, including capacity building for cooperative staff, training via institutes like BIRD (Bankers’ Institute of Rural Development), exposure visits and grants for establishing innovation and product diversification Cells. PACS (Primary Agricultural Credi Societies) as MSC (Multi Service Centre) - In 2025-26, NABARD allocated Rs.27.14 lakh to 15 PACS in Haveri District under KCCB Dharwad, supporting a range of activities such as pre-survey, DPR preparation, technology adoption, and capacity building as part of enhancing PACS as member-oriented institutions offering credit-plus services. SOFTCOB (Scheme of Financial Assistance for Training of Cooperative Banks Personnel) - During 2025-26, NABARD has sanctioned 112 programs to 3 Cooperative Training Institutes (CTIs) like ACSTI, SAHARDA and NIRB to extend training and capacity building of the staff of PACS, DCCBs and Apex Bank. An amount of Rs.78.24 lakh has been reimbursed towards conduct of 25 programs and Capital expenditure in these institutes during 2025-26. (iii) Initiatives for PACS/Cooperative Sector: In line with the National Plan formulated by the Ministry of Cooperation (MoC), Karnataka showed strong momentum in formation of MPACS. Against the target of 218 till FY 25-26, 233 MPACS were formed as on 19 Dec 2025. (iv) Interventions by NABARD: NABARD assesses district-level potential to identify potential GPs for M-PACS formation, liquidation of defunct PACS, encouraging DCCBs to act as Resource Support Agencies (RSAs) and appoint Resource persons (RPs) to facilitate formation and effective functioning of MPACS. The newly formed MPACS have disbursed Rs.44.16 crore till date (19 December 2025). (v) `Regional Rural Banks (RRBs): NABARD has taken several initiatives to ensure the smooth amalgamation of RRBs into Karnataka Grameena Bank (KGB) with effect from 01 May 2025 and to strengthen its functioning.
§ 10.3.18NABARD’S initiatives for RRB
NABARD conducted 8 State Level Monitoring Committee meetings to oversee the amalgamation and IT integration process, launching a unified logo for all Regional Rural Banks (RRBs). The Jan Sethu Portal was introduced as a digital platform for rural credit providing various loan options. As of May 1, 2025, the bank reported a CRAR (Capital to Risk Weighted Assets Ratio) of 8.26% and Net Profit earned as on 01 May 2025 during FY 25-26 (i.e. in the period between 01 April 2025 and 01 May 2025) is Rs.15.78 crore. After adjusting the accumulated losses of previous years and the net profit earned during FY 25-26, the Net accumulated losses as on 01 May 2025 stands at Rs. 255.57 crore. RRB performance in terms of ACP, NPAs, and financing activities is reviewed in Empowered Committee meetings by the RBI, with the 91st meeting held on June 25, 2025, and the 92nd on December 2, 2025.
§ 10.3.19Initiatives for PACS/Cooperative Sector
1. PACS Computerisation: Primary Agricultural Credit Societies (PACS) are integral to the 3-tier Short Term Cooperative Credit Structure which comprises District Cooperative Central Banks and State Cooperative Banks. A budget of Rs. 175.26 crore has been allocated for the computerization of 5,491 PACS with Rs. 70.10 crore provided by the State. Currently, 3,535 PACS are operational, 3,425 reaching day end stage and an additional 403 PACS are scheduled for computerization in the next phase. This initiative seeks to enhance PACS efficiency, reflecting the vision of ‘Sahakar Se Sammridhi’. 2. ARDB Computeriszation: Under this scheme, 207 units of KSCARDB/PCARDBs will be computerized with a total budget of Rs.11.70 crore, funded by the Government of India, State Government, and KSCARDB.
§ 10.3.20Supervision of RRBs, StCB and DCCBs
The Statutory inspections of Regional Rural Banks, State Cooperative Banks, and Central Cooperative Banks are conducted by NABARD under Section 35(6) of the Banking Regulation Act of 1949. The inspections aim to protect depositor interests, ensure proper business conduct and adherence to regulations. The assessment of banks financial, operational and managerial soundness is done using the CAMELSC(Capital Adequacy, Asset Quality, Management, Earnings, Liquidity, Systems and Compliance) approach. Annual inspections are conducted for Banks with a business volume of Rs. 3000 crore or more as of the previous year’s March 31. CCBs rated “C” or “D” are also inspected annually, while those rated “A”, “B+”, or “B” are inspected biennially.
§ 10.3.21Process of Supervision of StCBs, DCCBs, RRBs
The supervision of StCBs, DCCBs, and RRBs involves on-site inspections and off-site surveillance by NABARD, focusing on financial compliance and risk identification. They utilize tools like the Vulnerability Index for Cyber Security and the Fraud Vulnerability Index. In Karnataka, all cooperative banks met the 9% CRAR requirement except Bidar DCCB, which stands at 2.32%. NABARD intends to inspect 20 DCCBs in 2025-26. Additionally, two RRBs namely Karnataka Vikas Grameena Bank (KVGB) and Karnataka Grameena Bank (KGB) have been merged to create a single entity named Karnataka Grameena Bank (KGB) with Headquarters in Ballari and with assets of Rs.68703.09 crore and accumulated losses of Rs.255.57 crore while the CRAR is 8.26% as of May 1, 2025.
§ 10.3.22Urban Infrastructure Development Fund (UIDF)
This scheme was announced in Union Budget 2023-24 with an initial Rs.10,000 crore corpus supports public agencies in creating infrastructure in Tier-2 (population 50,000 to < 1 lakh) and Tier-3 (1 lakh to < 10 lakh) . Managed by the National Housing Bank (NHB), key Aspects of the UIDF Scheme includes supplementing state govt. in developing mid-sized cities in areas focusing on water supply, sanitation, sewerage, and solid waste management. Projects are implemented by State/Public Agencies, Municipal Corporations, and Urban Local Bodies. The present rate of interest is 1.5% less than the bank rate i.e 4.5%. The Department of Muncipal Administration(DMA), KUWSDB (Karnataka Under Water Supply and Drainage Board) are the implementing departments under this scheme. In 2023-24, under Tranche-I, works worth Rs.898.57 Cr were sanctioned against a Normative Allocation of Rs.640.11 Cr with Rs.193.47 Cr reimbursed. In 2024-25, under Tranche-II, 265 works totaling Rs.678.48 Cr have been submitted so far against the Normative allocation with no disbursements so far. Under Tranche-III against a Normative Allocation of Rs.640.11 Cr, projects worth Rs.870.09 Cr are anticipated to be submitted by DMA to NHB.
§ 10.3.23State Term Lending Institutions
Karnataka State Financial Corporation (KSFC) is a state level financial institution established by the state government in the year 1959 under the provisions of SFCs Act,1951 to cater to the long term financial needs of Micro, Small & Medium Enterprises(MSMEs) in the state. Details of sanctions and disbursements are shown in the Table 10.39.
| Particulars | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 (April 2025 to Dec.2025 |
|---|---|---|---|---|---|
| Sanction | 493.25 | 901.10 | 827.13 | 901.65 | 619.14 |
| Disbursements | 386.46 | 445.81 | 613.04 | 671.06 | 474.14 |
§ 10.3.24Karnataka State Industrial Infrastructure & Development Corporation (KSIIDC)
KSIIDC, established in 1964, has been greatly instrumental in the industrialization of the State, especially in the large and medium sector. KSIIDC has stopped financial lending activity since October 2002 onwards. At present, recovery of the past lending/advances and loans and disinvestment of Equity are the main activity. However, certain Investments as per the directions of Government of Karnataka are being made from time to time. KSIIDC continued its proactive role in the promotion of infrastructure projects on Public Private Partnership model and its role as nodal agency for Bangalore International Airport Project. Duly noting the initiatives taken up by KSIIDC in the infrastructure sector, the name was changed to “Karnataka State Industrial and Infrastructure Development Corporation Limited” with effect from November 22, 2010. Vision & Mission of KSIIDC: “To implement industrial infrastructure & civil aviation infrastructure in the State of Karnataka”.
Way forward
As the nodal agency of the State Government, KSIIDC has initiated activities for the development of the following projects which will be pursued for completion during next coming years.
a) Development of Major Infrastructure Projects as Nodal Agency for GoK
The Government of Karnataka has appointed KSIIDC as the Nodal Agency for various infrastructure projects undertaken by the state. In this capacity, KSIIDC has implemented and is currently implementing the following projects on behalf of the Government of Karnataka. KSIIDC as the Nodal Agency for various infrastructure projects undertaken by the state and is currently implementing the following projects on behalf of the Government of Karnataka
- Kempegowda International Airport (KIA)
- Aviation Development including development of Airports & Heliports
- Assisting Government regarding PPP Projects
- Tadadi Eco Tourism Project
- Development of Dash Board (Project Monitoring Software)
- Bengaluru Signature Business Project (BSBP)
The status of various airport and infrastructure projects in Karnataka includes: KSIIDC, the nodal agency for Kempegowda International Airport (KIAB) in Bengaluru, which received a 5-Star rating from Skytrax in 2025 and was named ‘Best Regional Airport in India and South Asia. KSIIDC is also tasked with developing other airports and airstrips, such as Kalaburagi Airport, the Civil Enclave at the Defence Airport in Bidar, construction of Airport by the Indian Navy under the Sea Bird Project at Karwar, Vijayapura Airport (99.70% physical, 99.60% financial progress), Shivamogga Airport, and Hassan Airport (70.20% physical, 64.16% financial progress) being anticipated for completion by March 2026 at an estimated cost of Rs.193.65 crores. Raichur Airport (16.85% physical and 12.10% financial progress) projected to completed by December 2026 at Rs. 219 Cr. Additionally, proposals for development of heliports at Hampi & Kodagu at Rs. 41 crore has been submitted for administrative approval. In FY 2023-24, KSIIDC assisted 14 government departments with project preparations. Furthermore, KSIIDC is leading the development of a sea port at Tadadi and eco-tourism initiatives in Uttara Kannada, as well as airport-related activities in Bangalore Rural and Dharwad Districts, all under a PPP model. KSIIDC also serves as the Nodal Agency for the State Government, managing specified projects. Additionally, it handles infrastructure activities, settling outstanding loan accounts under a new OTS policy.The sanctions, disbursements & recovery are shown in Table 10.40.
(Amount. in Crores)
| Programme/Scheme | 2021-22 | 2022-23 | 2023-24 | 2024-25 | Up to 31.12.2025 |
|---|---|---|---|---|---|
| I. SANCTIONS | |||||
| a) Loan | 0 | 0 | 0 | 0 | 0 |
| b) Equity | 0 | 0 | 0 | 0 | 0 |
| c) Others* | 0 | 5 | 5 | 5 | 0 |
| II. DISBURSEMENTS: | |||||
| a) Loan | 0 | 0 | 0 | 0 | 0 |
| b) Equity | 0 | 0 | 0 | 0 | 0 |
| c) Others* | 0 | 1.2 | 1.24 | 2.76 | 0.90 |
| III. RECOVERY | 9.48 | 20.08 | 10.24 | 27.03 | 2.20 |
§ 10.3.25Co-operative Credit
The Cooperative Credit System in Karnataka is crucial for credit delivery in rural and urban regions. It includes Urban Cooperative Banks and Primary Agricultural Cooperative Societies/Banks, which significantly contribute to rural credit. Karnataka uniquely features two types of Cooperative Credit Institutions, one for short-term and medium-term credit, and other for long-term credit. a. Short Term and MediumTerm Credit Co-operative Structure (STCCS): The Karnataka State Cooperative Apex Bank, alongside its 21 District Central Cooperative Banks (DCCBs-with 879 branches) and 6,302 Primary Agricultural Cooperative Societies (PACS) offers short-term credit to farmers and has initiated a Business Development Plan (BDP) under NABARD guidelines. An MoU signed in June 1995 with NABARD and the State Government has been extended periodically. As of March 31, 2024, the DCCBs’ working capital was Rs.42,870.17 crore it increased to Rs.45,889.50 crore (7.04% growth) by March 31, 2025. With 19 of the 21 DCCBs reporting profits in 2024–25 from diverse credit services to PACS, other societies and individual borrowers as shown in Table 10.41.
| Particulars | 2022-23 | 2023-24 | 2024-25 | 2025-26(Sept) |
|---|---|---|---|---|
| No of DCCBs | 21 | 21 | 21 | 21 |
| Total share capital | 2610.34 | 2802.34 | 3020.87 | 2653.03 |
| States’ share capital | 33.57 | 33.59 | 33.67 | 33.68 |
| Share of state share capital % | 1.28 | 1.20 | 1.11 | 1.27 |
| Deposits | 40048.60 | 42870.17 | 45889.50 | 41616.31 |
| Borrowings | 17615.72 | 17994.18 | 19240.14 | 19784.71 |
| Loans &Advances Outstanding | 44613.26 | 48011.18 | 52022.54 | 50669.43 |
| Banks showing profit | 20 | 19 | 19 | 10 |
b. Long Term Credit Cooperative Credit Structure (LTCCS): There are 177 Karnataka State Cooperative Agriculture and Rural Development Bank (KASCARD) at the State level and Primary Cooperative Agriculture and Rural Development Bank at taluk level catering to Long Term credit needs. NABARD provides refinance to the KASCARD Bank. c. Agriculture Loan Disbursement: the performance under term wise is shown in Table 10.42.
| Year | Type of Loan | Yearly Target | Achievement | Percent to Amount | ||
|---|---|---|---|---|---|---|
| Number of Farmers | Amount disbursed | Numbers of Farmers | Amount disbursed | |||
| 2022-23 | Short term | 3235987 | 22337 | 2957134 | 21868.40 | 97.90 |
| Medium term | 31929 | 1131 | 41344 | 1365.66 | 120.75 | |
| Long term | 32084 | 532 | 12920 | 295.64 | 55.57 | |
| 2023-24 | Short term | 3400000 | 23000 | 2926910 | 22982.10 | 99.92 |
| Medium term | 45000 | 1200 | 34517 | 1180.51 | 98.38 | |
| Long term | 15000 | 400 | 19738 | 337.26 | 84.32 | |
| 2024-25 | Short term | 3510000 | 25000 | 2920084 | 24078.20 | 96.31 |
| Medium term | 70000 | 1600 | 32207 | 1312.37 | 82.02 | |
| Long term | 20000 | 400 | 23307 | 548.52 | 137.13 | |
| 2025-26 ( Dec ) | Short term | 3630789 | 25925 | 2210628 | 17069.24 | 65.84 |
| Medium term | 42211 | 1424 | 25064 | 1003.6 | 70.47 | |
| Long term | 27000 | 650 | 16992 | 358.78 | 55.20 |
d. Recovery of Loans: The comparative position of recovery of short, medium and long-term loans under the Cooperative Credit System in the state for the period from 2021–22 to 2025–26 is presented in Table 10.43.
| Type of loan | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-2026 (Dec) |
|---|---|---|---|---|---|
| Short term | 96.65 | 96.01 | 95.77 | 95.72 | 95.82 |
| Medium term | 88.25 | 89.29 | 96.73 | 89.74 | 89.93 |
| Long term | 58.04 | 58.54 | 74.46 | 68.88 | 31.15 |
e. Subsidised Agriculture Loans to farmers @ 0 and 1 per cent : Agricultural loans were given to the farmers at 6 % from 01.04.2004 through Agricultural Cooperative Credit Institutions in the state. During 2013-14 Govt. reduced the interest rate to 0% up to 2.00 lakhs and 1% for upto 3 lakhs of short term agricultural loans. The medium term and long-term agricultural loans up to Rs.10.00 lakhs are being disbursed to farmers at 3%. During the year 2021-22, 24,81,359 farmers were given Rs.1022.90 crore and in 2022-23 Rs. 1078.02 crore was released to 25,67,520 farmers. During the year 2023-24 Rs 1178.22 crore was released to 30.38 lakh farmers. In 2024-25, Rs. 1416.91 crores of budget provision was made and till now, an amount of Rs.1041.16 crores have been released to 33.08 lakhs farmers. In 2025–26, a budgetary provision of Rs.1,591.74 crore was made of which Rs.946.29 crore has so far been released to cooperative societies on behalf of 19.02 lakh farmers. f. Interest waiver scheme on Medium and long term Agricultural loans: Under this scheme, interest will be borne by the Government for farmers repaying overdue principal on agricultural loans due by March 2024. As of now, 36,146 farmers repaid Rs.287.98 crore, leading to an interest waiver of Rs.239.26 crore. In 2024–25, KASCARD Bank provided Rs.10.13 crore under this scheme. With a subsidy of Rs.229.13 crore in 2025–26, loan recovery improved which supported cooperative financial stability. g. Interest subsidy to Self Help Groups : The scheme of advancing loans to Self Help Groups in Karnataka at 4 % is being implemented from 01-04-2007. During 2017–18 to 2020–21, Women Self Help Groups (SHGs) received loans at a net interest rate of 0%, whereas Men SHGs at4% as part of NRLM/NULM schemes. In 2021–22, the Kayaka scheme merged with the SHG scheme, allowing loans up to Rs.5 lakh for women at 0% interest and for men at 4%. Loans between Rs.5 lakh and Rs.10 lakh for self-employment continued at a 4% interest rate, extending into 2024–25. In the financial years 2022-23 and 2023-24, a total of 50,013 and 24,875 groups received loans of Rs.2,206.96 crore and Rs.1,010.05 crore respectively, with outstanding amounts of Rs.2,650.54 crore and Rs.2,146.47 crore. In 2022-23, Rs.96.61 crore in interest subsidies was released to 85,025 groups, while a budget of Rs.99.00 crore for 2023-24 was fully utilized. For the financial year 2024-25, by March, loans of Rs.936.91 crore were disbursed to 20,067 self-help groups (SHGs), with outstanding loans reaching Rs.1,825.33 crore from 91,531 SHGs. A budget of Rs.124.80 crore was allocated for recoveries. In the 2025-26 period, as of December Rs.512.61 crore was disbursed to 11,640 SHGs, with outstanding loans of Rs.1,881.76 crore with 90,214 SHGs and a budget provision of Rs.108.26 crore for recoveries was made. h. The Central Government has initiated measures to strengthen Primary Agricultural Cooperative Societies (PACS) to improve service delivery in rural areas 1. National Co-operative Database developed by the Ministry of Co-operation includes data from 46,986 cooperative societies aiming to enhance the cooperative sector’s development. 2. PACS plans to establish at least 5 Jan Aushadhi Kendras in each district to offer affordable generic medicines to the rural population. So far, 213 PACS have committed to opening these centers, with 27 already operational. 3. Under the GRAMA One model, PACS functions as Common Service Centres (CSCs) offering approximately 300 Central and State e-services such as money transfer, ticket booking, and Aadhaar services. Currently, 4,701 PACS are enrolled as CSC centres to facilitate these services. 4. As of now, 167 PACS have been registered as Organic Societies, 232 as Export Societies, and 650 under the National Bheej Sahakari Samiti offering services to farmers. Additionally, PACS operate as Fertilizer Distribution Centres, providing fertilizers, seeds, pesticides, and organic fertilizers in 2,280 societies.
| Sl. No. | Particulars | KSRTC | BMTC | NWKRTC | KKRTC | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | ||
| 1 | No. of buses as at the end of the year | 8977 | 8966 | -0.1 | -- | -- | -- | 5302 | 5218 | -1.6 | - | - | - |
| 2 | % over aged buses | 44 | 53.4 | - | -- | -- | -- | 63.2 | 67.2 | - | - | - | - |
| 3 | Routes operated at the end of the year (No.) | 5968 | 6003 | 0.6 | 1748 | 1826 | 4.46 | 4710 | 4970 | 5.5 | 4493 | 4568 | 1.7 |
| 4 | Route length at the end of the year. (in kms) | 83.1 | 83.45 | 0.4 | 26 | 26.6 | 2.31 | 3.7 | 3.94 | 6.4 | 4.4 | 4.31 | -2 |
| 5 | Avg. ef.f Kms. operated /day ( in lakh) | 28.68 | 29.95 | 4.4 | 11.24 | 12.07 | 7.38 | 15.52 | 16.93 | 9.1 | 15.92 | 16.26 | 2.1 |
| 6 | Avg. pass. carried/ day (in lakh) | 34.34 | 34.81 | 1.4 | 40.12 | 42.98 | 7.13 | 24.48 | 26.48 | 8.2 | 17.04 | 16.87 | -1 |
| 7 | Avg. number of buses held | 8823.4 | 8853.3 | 0.3 | 6243.2 | 6965.4 | 11.6 | 5065.4 | 5273.4 | 4.1 | 5021.9 | 4939.4 | -1.6 |
| 8 | Avg. number of buses on road | 7898.9 | 8098.7 | 2.5 | 5440.1 | 5872.8 | 7.95 | 4576.1 | 4895.4 | 7 | 4504 | 4581.6 | 1.7 |
| 9 | Percentage of Fleet utilization | 89.5 | 91.5 | 2.2 | 87.1 | 84.3 | -3.21 | 90.3 | 92.8 | 2.77 | 89.7 | 92.8 | 3.4 |
| 10 | Avg. vehicle utilization (in kms.) | 363 | 370 | 1.9 | 206.7 | 205.5 | -0.58 | 339 | 346 | 2 | 353 | 355 | 0.6 |
| 11 | Total Gross receipts (Rs. in crores) | 3762.3 | 3947.83 | 4.9 | 1626.84 | 2011.25 | 23.6% | 1913.64 | 2348.41 | 22.7 | 1877.43 | 2104.52 | 12.1 |
| 12 | Avg. seating capacity | 50.3 | 50.3 | - | 58.9 | 58.6 | -0.51 | 48 | 48 | 0 | 47 | 49 | 4.3 |
| 13 | Percentage of Load factor | 91.3 | 88.7 | -2.8 | 82.4 | 82.1 | -0.36 | 101.7 | 101.8 | 0.1 | 97.4 | 89.1 | -8.5 |
| 14 | Bus staff ratio (on sch.) | 4.12 | 4.15 | 0.7 | 4.81 | 4.65 | -3.3 | 3.87 | 4.05 | 4.6 | 4.28 | 4.11 | -4 |
(in crores)
| Sl. No. | Particulars | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) | 2024-25 (upto 31-12-24) | 2025-26 (upto 31-12-25) | % Change in 2025-26 to 2024-25 (upto Dec.) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KSRTC | BMTC | NWKRTC | KKRTC | ||||||||||
| 1 | Total receipts | 3762.30 | 3947.83 | +4.9 | 1889.10 | 2396.60 | 26.9 | 2157.81 | 2602.69 | 20.6 | 2089.30 | 2323.14 | 11.17 |
| 2 | Total expenses (Excl. taxes) | 3785.88 | 3750.68 | 2409.21 | 2585.50 | 7.3 | 2138.29 | 2191.16 | 2.4 | 1951.36 | 2052.01 | 5.16 | |
| a) Operating expenses | 3590.79 | 3709.07 | 3.3 | - | - | - | 2093.40 | 2155.81 | 3.0 | 1497.48 | 1558.71 | 4.09 | |
| b) Non-Operating expenses | 195.81 | 241.61 | 23.4 | - | - | - | 44.89 | 35.35 | -21.3 | 453.88 | 493.30 | 8.69 | |
| 3 | Profit/loss before taxes | -24.30 | -2.85 | -- | - | - | 19.52 | 411.53 | 138.29 | 271.13 | 96.07 | ||
| 4 | Total taxes | 198.14 | 229.09 | 15.6 | 90.29 | 111.62 | 23.6 | 103.28 | 126.29 | 99.97 | 112.40 | 12.44 | |
| a) Passenger tax | -- | 0 | 0 | 0.00 | 0.00 | 0.00 | |||||||
| b) Motor vehicle & other taxes | 198.14 | 229.09 | 15.6 | 90.29 | 111.62 | 23.6 | 103.28 | 126.29 | 22.3 | 99.97 | 112.40 | 12.44 | |
| 5 | Total expenses | 3984.74 | 4179.77 | 4.9 | 2499.50 | 2697.12 | 7.9 | 2241.57 | 2317.45 | 3.4 | 2051.33 | 2164.41 | 5.51 |
| 6 | Net profit /loss | -222.44 | -231.94 | -- | -- | -- | -83.76 | 285.24 | 38.32 | 158.73 | |||
| 7 | Total Profit /Loss | -222.44 | -231.94 | -610.40 | -300.52 | -83.76 | 285.24 | 38.32 | 158.73 |
(Rs. in Crores)
| Sl. No. | Name of the project | Length of Railway line sanctioned | Estimated Cost | Amount released by GOK uto Dec 2025 | Expenditure incurred upto Dec 2025 | Status of the projects |
|---|---|---|---|---|---|---|
| 1 | Munirabad – Mehaboobanagar (Raichur) | 170 | 2560.09 | 1028.54 | 1028.54 | Ginigera - Karatagi (66) - Commissioned in 3 phases during 2017, 2019 & 2020 |
| Karatagi - Sindhanur (18) - Commissioned in 2024 | ||||||
| Sindhanur-Hirekotengal (33) - 100% land handed over - TDC (Targeted date of completion) for commissioning - Dec-26 | ||||||
| Hirekotengal - Raichur (48) - 100% land handed over in July 2024 - TDC for commissioning - Dec-27 | ||||||
| 2 | TumkurRayadurga | 102 | 1452.55 | 520.54 | 520.54 | Tumkur - Urukere (11) - Work in progress - TDC for commissioning - Dec-25 |
| Urukere - Koratagere (18) - Tender opened on 14.11.2025 and is under finalization – TDC –Feb 28 | ||||||
| Koratagere - Madhugiri (21) & Madhugiri - Madakasira (35) - Tender invited on 09.11.2025 with opening on 05.12.2025 – TDC Feb-28 | ||||||
| Madakasira - Pavagada (22) - Contract awarded on 31.12.2024. Appointed Date 22.05.2025 – TDC 2026 | ||||||
| Pavagada - Doddahalli (16) - Work is in progress – TDC 2026 | ||||||
| Doddahalli - Rayadurga (83) - Commissioned in 2 phases during 2016-17 and 2022-23(8km in Karnataka and 75 km in Andhra Pradesh. | ||||||
| 3 | Chickamagalur-Belur | 46 | 290.9 | 271.87 | 271.87 | Chikmagalur - Hadihalli (9.1) - CRS (Commission of Railway safety) inspection completed on 29.03.2025 |
| Hadihalli - Belur (12.9) - Work in progress - May 2026 | ||||||
| 4 | Kudchi – Bagalkot | 142 | 1530.09 | 787.7 | 787.7 | Bagalkot - Khajjidhoni (30) - Commissioned in 2017 |
| Kajjidoni - Lokapur (7.3) Work completed - Commissioned on 03.04.2025 | ||||||
| Lokapur - Yadwad (23) - 100% land is handed over, Work in progress – TDC Sep-26 | ||||||
| Yadwad - Jamkhandi (25) - Work in progress only at 7km -In balance locations, farmers objecting to commence the works due to various issues - TDC Mar-27 | ||||||
| Jamkhandi - Jagdal (20), Jagdal -Harugeri(20) & Harugeri - Kudachi (19) - Miscellaneous Tender called for land issue (one tender is called for ground clearance work to overcome the land/other issues has been awarded and the works are in progress). Once the land issues are resolved the tender will be called – TDC Dec-28 | ||||||
| 5 | Gadag-Wadi New Line | 252.5 | 1922.14 | 1080.26 | 1080.26 | Talkal - Hanumapur (35) - Commissioned in 2 phases during 2021-22 and 2022-23 |
| Hanmapur - Linganbandi (10.7) - Commissioned on 06.02.2024 | ||||||
| Linganbandi-Kushtagi (10.9) - Commissioned on 02.04.2025 | ||||||
| Kushtagi- Jumlapur Road (20) - Work in progress – TDC Nov-2026 | ||||||
| Jumlapur Road- Gurugunta (59) -Tender opened on 11.11.2025, under finalization - June 28 | ||||||
| Gurugunta – Krishna Bridge Rd (15), Krishna Bridge Rd (1.5) & Krishna Bridge Rd- Shorapur (25) - TDC for NIT – Dec 25 | ||||||
| Shorapur - Shahpur (23.4), Shahpur- Biral Buzurg (26) & Biral Buzurg - Wadi (19.3) - Work in progress | ||||||
| 6 | Tumkur -Davanagere- | 200 | 1801 | 1353.5 | 1353.5 | Urukere - Thimmarajanahalli (13.31) - Work in progress – TDC Dec-2025 |
| Thimmarajanahalli - Tavarekere (41.32) - 95% land received in May-25. Tender awarded on 06.03.2025. Work in progress | ||||||
| Tavarekere - Hiriyur (27.52) - 100% land handed over in May 2025. EPC tender floated & bid closed on to 31.10.2025 and under finalization | ||||||
| Hiriyur - Chitradurga (48.32) Tender Schedule under preparation-TDC for commissioning Dec-27 | ||||||
| Chitradurga - Barmasagar (26.26) Balance Land – 36/ 348 A, Tender Awarded on 05.06.2024-TDC for commissioning Feb-27 | ||||||
| Bharmasagar - Hebbalu(9.93) Work in progress-TDC for commissioning Aug-26 | ||||||
| Hebbalu - Tolahunse (15.51)-Work in progress-TDC for commissioning Aug-26 | ||||||
| 7 | Belur-Hasssan | 22 | 462.08 | 85 | 85 | Alur - Belur (27 km)-Tender will be called afet r handing over of land of 509 A - TDC for commissioning Dec- 2027 |
| 8 | Shimoga -Shikaripura-Ranebennur | 103 | 1200.73 | 335.64 | 335.64 | Shimoga (Kotegenguru) - Mallapura (17)-Work in progress-TDC for commissioning Dec-26 |
| Mallapura - Shikaripura (23)-Work in progress TDC for commissioning Dec-26 | ||||||
| Shikaripura -Kitat dahalli (8) LAQ in Progress, Tentative TDC for NIT - Jan 26-TDC for commissioning Dec -27 | ||||||
| Kitat dahalli - Ranebennur(48) LAQ in Progress, Tentative TDC for NIT - Apr 26-TDC for commissioning June -28 | ||||||
| 9 | Dharwad-Kittur-Belagavi | 73 | 927.4 | 68.84 | 68.84 | Kyrakoppa - Tegur (19) LAQ is under progress, afet r which the tender will be called |
| Tegur -Bagewadi (30) LAQ is under progress, afet r which the tender will be called | ||||||
| Bagewadi -Desur (24) LAQ is under progress, afet r which the tender will be called-TDC for commissioning Dec 2029 | ||||||
| Total | 12146.98 | 5531.89 | 5531.89 |
(Rs. In Crores)
| Sl. No. | Name of the project | Length of Railway line sanctioned | Land required in acres | Land acquired in Acres | Balance land to be acquired | Status of balance land |
|---|---|---|---|---|---|---|
| 1 | Munirabad - Mehaboobanagar (Raichur) | 170 | 2425 | 2425 | 0 | Entire land has been handed over |
| 2 | Tumkur Rayadurga | 102 | 1395.34 | 1395.34 | 0 | Entire land has been handed over |
| 3 | Chickamagalur - Belur | 46 | 323.12 | 323.12 | 0 | Entire land has been handed over |
| 4 | Kudchi – Bagalkot | 142 | 2548.22 | 2436.16 | 112.06 | Bagalkot -74.15 acres Award quashed by the High Court. Writ appeal is filled and it is \still pending in High Court, Dharwad |
| Bailahongala 6.36 A – Award Stage | ||||||
| Chikkodi | ||||||
| • 30 A-31 G – SIA Exemption approved. 11(1) notification Done Individually notice has been served and waiting period is (60 days) dated: 30-11-2025 completed. | ||||||
| • Current stage is Section 15 (3) sent to approval to the Govt. through the Deputy Commissioner Belagavi dated: 09-12-2025. | ||||||
| 5 | Gadag-Wadi New Line | 252.5 | 4333.29 | 4066.19 | 267.1 | Gadag-wadi balance land 267.10 |
| • 4-08 JMC Stage (Jewargi & Chitapur Taluka) | ||||||
| • 5-28 JMC Stage Chitapur Taluka Basaveshwarnagar | ||||||
| • 6-02 JMC Stage (Jewargi & Chitapur Taluka) | ||||||
| • Total 15.38 A - JMC Stage, TDC 15.12.2025 | ||||||
| • Only 0.37 acres under payment stage out of acquired land of Rajwal village. | ||||||
| • 20.07 A- JMC Stage | ||||||
| • 11.01 A - Payment stage | ||||||
| • (20.05 A – Payment stage under acquired land out of 1358.19 A) | ||||||
| • Received the additional proposal for 52.02 acres from railway department and sent for 28(1) approval on Dt:19.12.2025 | ||||||
| • A (Kushtagi Taluk)- Pending with SLAO Office | ||||||
| • 11.35 A - 28(4) PAC Completed, Payment under Disbursal | ||||||
| • 17.36 A- 28(4) Approved, PAC Pending | ||||||
| • 39.37 A- 28 (4) Report pending from SLAO | ||||||
| • 97.14 A- 28(1) Completed, JMC under progress | ||||||
| 6 | Tumkur - Davanagere- | 200 | 2426.22 | 2360.2 | 66.02 | Davanagere- Balance land 24.22 acres |
| • Award completed, Handover letet r sent to SWR | ||||||
| • 14.07 A – Award has been approved by the Government on 12.12.2025 Payment of compensation is in progress | ||||||
| • 10.15 A – Section 11(1) Preliminary Notification has been published in Karnataka state gazetet on 20.11.2025 – objections receiving stage. | ||||||
| Tumkur District – 41.20 A | ||||||
| • 11.26 A – Award approval stage. | ||||||
| • 15.31 A – 19(1) Approval Stage | ||||||
| • 13.29 A – 15(3) – Proposal Preparation Stage | ||||||
| • 0.04 A – Kharab land | ||||||
| 7 | Belur-Hasssan | 22 | 509 | 0 | 509 | Hassan District: Alur - Belur (27 km) - Tender will be called afet r handing over of land of 509 A |
| 8 | Shimoga -Shikaripura-Ranebennur | 103 | 1308.4 | 895.31 | 413.1 | Haveri District – 413.10 A |
| • 188.29 A - 28(4) Notification issued | ||||||
| • 89.06 A - 28(4) Submitet d for Approval | ||||||
| • 135.05 A – JMC under progress | ||||||
| 9 | Dharwad-Kittur-Belagavi | 73 | 1355.3 | 0 | 1355.3 | Dharwad District- 329.10 A - Land Acquisition is in Progress |
| Belagavi District – | ||||||
| • 407.28 A – 28 (4) Completed, Payment under disbursal | ||||||
| • 463 A - 28 (4) Completed, PSC pending. | ||||||
| • 155.33 – 28(4) Proposal sent to GoK. | ||||||
| Total | 16738.75 | 13901.32 | 2839.88 |