Introduction

Rural development is a foundational pillar of Karnataka’s development architecture, encompassing systematic, multi-dimensional interventions aimed at enhancing the quality of life and economic well-being of the state’s rural population. Despite accelerating urbanisation, nearly 61 per cent of Karnataka’s residents continue to reside in rural areas. Although the rural share of the population has gradually declined over time and at a pace faster than the national average, the state, like India as a whole, continues to retain the essential characteristics of a predominantly rural and agrarian economy. Over the past two decades, economic growth has facilitated a structural transformation marked by the progressive movement of labour from agriculture to non-agricultural sectors. Yet, the persistence of rural demographic predominance underscores the continued relevance of targeted rural development strategies. In this context, a focused and integrated approach to rural development remains indispensable for achieving sustained economic growth alongside inclusive and equitable human development. Decentralised planning, aligned with effective implementation of rural development programmes, plays a transformative role in strengthening service delivery and deepening grassroots democracy. Karnataka’s Panchayat Raj system represents one of the most extensive and institutionally evolved decentralised governance frameworks in the country, comprising 5,946 Grama Panchayats at the lower level, 239 Taluk Panchayats at the intermediate tier, and 31 Zilla Panchayats at the district level. Following the 73rd Constitutional Amendment, Karnataka became the first state in India to enact comprehensive enabling legislation, the Karnataka Panchayat Raj Act, 1993. This legislative framework conferred constitutional status upon Panchayat Raj Institutions (PRIs), formally recognising them as institutions of self-government entrusted with the preparation and implementation of development plans that foster economic growth while ensuring social justice through equitable distribution of developmental benefits.

§ 4.1Rural Development Programmes: Foundations and Institutional Imperatives

Rural development programmes in Karnataka are designed to promote dignified and sustainable living conditions in rural areas by ensuring access to essential public services through safe drinking water, sanitation, street lighting, primary healthcare, elementary education, and reliable transport connectivity. These foundational amenities not only improve quality of life but also enhance agricultural productivity, support allied rural enterprises, and promote efficient management of natural and financial resources. Accordingly, rural development interventions emphasise housing, water supply, sanitation, road infrastructure, and employment generation, recognising that infrastructure and livelihoods must advance together to achieve sustainable progress. The effectiveness of these programmes depends significantly on the institutional capacity of Panchayat Raj Institutions (PRIs). Despite their constitutional status, Panchayats continue to face constraints such as limited financial autonomy, inadequate devolution of authority, insufficient women, youth participation, and political interference. Addressing these challenges requires meaningful devolution of funds, functions, and functionaries, the “three Fs” central to genuine decentralisation. Greater fiscal empowerment, clearly defined responsibilities, and adequate staffing would enable Panchayats to undertake responsive and contextspecific planning. Expanding their role into areas like renewable energy promotion, rural electrification, skill development, small-scale industries, and vocational education would further align local governance with evolving rural needs.

§ 4.1.1Strengthening Accountability and Institutional Capacity

Sustained rural development also requires robust accountability mechanisms. Effective utilisation of Finance Commission grants, particularly for water supply, sanitation, sewage, and solid waste management, demands systematic monitoring and regular statutory audits at the local level. Transparent audit practices can strengthen financial discipline and public trust. Simultaneously, structured capacity-building initiatives are essential to enhance the effectiveness of PRIs. Training in the preparation and implementation of Grama Panchayat Development Plans (GPDPs) would promote evidence-based and participatory planning. The recruitment of adequate technical and support staff at the village level would further improve administrative efficiency. Together, financial devolution, functional strengthening, rigorous oversight, and institutional capacity-building form the cornerstone of accountable and effective rural governance in Karnataka.

§ 4.1.2Budgetary Allocation

For the financial year 2025–26, the department has been allocated a total budget of Rs.26,735.74 crore to implement its various programmes and initiatives. Out of this allocation, Rs.8,894.46 crore has been released so far. An amount of Rs.7,910.03 crore has been utilised up to the end of December 2025, including expenditure met from the opening balance, reflecting the ongoing implementation of schemes across sectors.

§ 4.2The Details of Some of the Good Programs Undertaken by the Department Are as Follows.

§ 4.2.1Arivu Kendra

  • An order has been issued to upgrade the Gram Panchayat libraries and information centers to “Arivu Kendra”. There are a total of 5888 Arivu Kendra in the state, which have been upgraded to digital libraries.
  • A separate logo has been designed and released for the awareness centers.
  • A total of 50.92 lakh children are registered in Gram Panchayat libraries.
  • The working hours of Gram Panchayat libraries are fixed at 8 hours every day.
  • It has been ordered on 16-08-2023 to pay the monthly minimum wage and variable dearness allowance (VDA) fixed by the Labour Department to the Library Supervisors.
  • A 6-month certificate course for library supervisors has been launched by the Mahatma Gandhi Rural Development and Panchayat Raj University.
  • With the aim of bringing about qualitative change in Arivu Kendras, following civil society organisations have joined their hands with the department, namely Adhyayan Foundation, Shikshan Foundation, NIOS, Akanksha Charitable Trust, India Literacy Project, Azim Premji Foundation, Nature Conservation Foundation, Rotary District 3191, Science Gallery Bengaluru, Centre for Budget and Policy Studies, The British Council, Indian Institute of Astrophysics, Kalike Tata Trusts, NIELIT, Dementia India Alliance and IDIA.
  • “Darshini” - A program has been launched to distribute assistive devices to Arivu Kendras with the aim of making them specially challenged friendly.
  • 6599 new libraries are being started in the state of Karnataka under the “Children and Adolescents Libraries and Digital Infrastucture” program of the Central Government’s “Scheme for Special Assistance to States for Capital Investment” For each new library, 06 copies of 340 Kannada books and 03 copies of 209 English books have been purchased and supplied to a total of 6599 libraries, at a cost of Rs. 2.00 lakhs per library. Furniture has been purchased for each library at a cost of Rs. 1.00 lakh.

§ 4.2.2Transfer through Counseling

  • For the first time in the history of the department, online counseling for transfer of Panchayat Development Officer, Gram Panchayat Secretary and Account Assistant has been conducted from 08-09-2025 to 24- 09-2025. Officers who have served for more than 05 years in the same place have been compulsorily transferred. 1574 Panchayat Development Officers, 894 Secretaries and 402 Second Division Account Assistants have been transferred through counseling.

§ 4.2.3Tax Collection

  • In the financial year 2024-25, for the first time in the history of the department, the Gram Panchayats have collected a tax amount of more than Rs.1270.00 crore in tax. So far in the current year, Rs. 996.76 crore tax amount has been collected, and the target is to collect more tax than last year.

§ 4.2.4Kayak Gram (Gram Panchayat Adoption Program)

  • As announced in the Budget 2025-26, the Hon’ble Minister of Rural Development and Panchayat Raj launched the “Kayaka Gram” program on 30-10-2025.
  • The objective of the program is to comprehensively develop the Grama Panchayats that are lagging behind in the Grama Panchayath Performance Ranking prepared by the e-Governance Division of the Department, by adopting them by the state-level officers, Zilla Panchayat and Taluk Panchayat officers, including effective implementation of central and state government programs, Panchayat functioning, regular organization of various meetings, and tax collection.
  • As per the guidelines of the program, State level officers, Zilla Panchayat Chief Executive Officers, Deputy Secretary (Development), Deputy Secretary (Administration), Project Directors, Chief Accounts Officer and Chief Planning Officers, Taluk Panchayat Executive Officers, Assistant Directors (Panchayat Raj) and Assistant Directors (Rural Employment) have adopted a total of 1308 Gram Panchayats that were ranked last in the Grama Panchyath Ranking report for September-2025.

§ 4.2.5Constitution Literacy Program (Arivu Yatra Abhiyan)

As announced in the budget for the year 2025-26, on 26th November, as part of Constitution Day, the Hon’ble Minister of Rural Development and Panchayat Raj launched the Constitution Literacy Program under the name of “Arivu Yatra Abhiyan”. Officers of District, Taluk and Gram Panchayats, people’s representatives, library supervisors participated in the program. The objective of the campaign is to create awareness among the rural people about the values of the Constitution, strengthen the spirit of equality, justice and fraternity and empower citizens to actively participate in local democracy and governance in collaboration with various departments.

§ 4.2.6Soically Responsive Local Governance Monitoring Cell

To transform Gram Panchayats into socially conscious, responsive and efficient village governments, a Monitoring Cell has been established in the Karnataka Panchayat Raj Commission and one subject expert and two young professionals have been appointed. Through this cell, the implementation of ambitious projects of the Rural Development and Panchayat Raj Department such as Arivu Kendra, Koosina Mane - Childcare Center, Solid Waste Management, etc. is being monitored and information management is being done.

§ 4.2.7Rehabilitation of bonded labourers

  • An order has been issued to increase the monthly allowance to Rs. 2000/- for the rehabilitation of workers released from bonded labour system. An order has been issued notifying field level officers from each of the line departments like Labour, Home, Women and Child Development, Revenue, Social Welfare, Rural Development and Panchayat Raj as Bonded Labour Prohibition Officers.

§ 4.2.8Metering of Street Lights

For systematic metering of street lights in 200 selected Gram Panchayats of the State, Rs. 9.97 crores have been released. Currently metering works in 70 Gram Panchayats are being taken up. Metering works have been completed in 33 Gram Panchayats and works are in progress in 37 Gram Panchayats.

§ 4.2.9Rural Health (Grama Arogya)

The “Gram Arogya” campaign has been launched with the aim of preventing non-communicable diseases at the early stage and health kits have been distributed to Grama Panchayaths in all 31 districts. Health checkups such as blood pressure, diabetes tests have been conducted during the current year.

§ 4.3Housing

Housing is a basic and very important need for every citizen. Housing not only provides social security to human beings but it also provides status in the society. Housing has evolved as a prime component over the period of time not only in providing shelter but also for providing employment opportunities and in development of localities. To meet the growing demand for housing, the State Government has been pro-active in its housing policies. Housing for the poor and down-trodden assumes greater importance in the State. Every successive Government has given greater attention to the problem of housing scarcity and increased the budgetary allocation year after year.

§ 4.3.1Rajiv Gandhi Housing Corporation Limited

This Corporation has been established by the State Government on 20.04.2000, to implement all the State and Central Government sponsored housing schemes for economically and socially weaker sections of the Society both in rural and urban areas. The main objectives of the Company are:

  • To provide houses to the Socially and Economically Weaker sections of the society.
  • Speedy implementation of schemes.
  • Transparency in implementation.
  • Smooth flow of funds to ensure that the funds reach the ultimate beneficiaries in time.
  • To encourage cost effective technology in construction through District Nirmithi Kendras.
  • Strengthening of Nirmithi Kendras.

Various housing schemes implemented in rural areas are Rural Ashraya /Basava Vasathi yojane, Devraj Urs Housing yojane, Dr. B. R Ambedkar Nivas yojane and Pradhan Mantri Awas yojane (Gramin). The unit cost under different rural housing schemes in the year 2025-26 is as mentioned below.

Table
YearRural Ashraya/Basava Vasathi YojaneDr.B.R.Ambedkar Nivasa YojaneDevraj Urs Vasathi YojanePradhan Mantri Awas Yojane -Gramin
2021-22Gen1,20,000SC/ST2,00,000Gen1,20,000Gen1,20,000
SC/ST1,50,000SC/ST1,75,000
Survey, p. 148

From 2000-01 to 2025-26 (up to end of December-2025) in rural Karnataka the Company has built 47,60,879 houses under various housing schemes and 1,40,749 sites have been distributed. The details of scheme-wise houses completed and sites distributed are given in Table 4.1.

Table 4.1Houses completed under rural housing schemes and sites distributed from 2000-01 to 2025-26 up to
YearRural Ashraya /Basava VasathiRural AmbedkarDevraj Urs HousingDr. B.R. Ambedkar NivasIAY/ PMAY (G)PM-JanmanTotal Houses constructedHouse Sites distributed
2000-01 to 2019-20250272816672043357192350117961904084774121304
2020-216165102896270141153601030972217
2021-225672404800296701338901045831829
2022-23852060109793540717577014916910110
2023-248723107741334732002201484671235
2024-256300005775257722923824123809484
2025-26**208750199597051433372469803570
Total2877415166720775433533911285714964760879140749
** up to the end of December 2025. · Survey, p. 149

The houseless and siteless survey conducted by the Government identified family living in kaccha houses and rented houses as houseless. There are 24,18,922 houseless and siteless in the state in which 17,14,946 are houseless and 7,03,976 are siteless. Expenditure incurred by RGHCL on Social Housing Schemes in Karnataka from 2000-01 to 2025-26 given in Table 4.2.

Table 4.2Expenditure incurred by RGHCL on Social Housing Schemes in Karnataka from 2000-01 to 2025-26. (Rs. in Crores)
YearRural Ashraya/ Basava Vasathi YojaneRural AmbedkarD. Devraj Urs Housing SchemeDr. B.R. Ambedkar Nivasa YojaneIAY/ PMAY(G)PM JANMANTotal
2000-134,692.49386.50--2,876.76-7,955.75
2013-141,303.9522.130.50-509.46-1,836.04
2014-151,340.118.456.15-1,155.34-2,510.05
2015-161,010.525.4182.45-1,179.25-2,277.63
2016-171,557.23-222.28552.391,187.82-3,519.72
2017-181,804.720.44172.601,535.87879.72-4,393.35
2018-191,935.750.0989.791,016.44660.79-3,702.86
2019-20799.660.0441.54404.08158.62-1,403.94
2020-21614.65-40.64440.3795.53-1,191.19
2021-22475.35-83.38360.55114.88-1,034.16
2022-231,014.17-137.83557.167.11-1,776.21
2023-24835.18-66.93657.56525.875.732,091.26
2024-25393.65-38.39394.19560.170.871387.27
2025-26479.58-23.06427.61628.990.001559.24
Total18257.01423.061005.546346.1610600.316.6036638.67
* up to the end of December-2025 · Survey, p. 149

During last 5 years the Government has spent a total of Rs.31.06 crores under Rural Houses Sites. Details are given in Table 4.3.

Table 4.3: Expenditure incurred under Rural Houses Sites from 2020-21 to 2025-26 (upto December 2025)

(Rs. in Crores)

Scheme2020-212021-222022-232023-242024-252025-26Total
Amount spent on Rural Houses Sites3.357.535.192.305.657.0331.06
Survey, p. 150

House constructed under Rural housing Scheme from 2020-21 to 2025-26 (upto December 2025) under various schemes are given Table 4.4.

Table 4.4Targets and achievements of Rural Housing Schemes from 2020-21 to 2025-26 (upto December 2025)
Financial yearBasava VasathiDevraj Urs HousingDr. B.R Ambedkar NivasaPMAY(G) & PM-JanmanTotal
TargetCompletedTargetCompletedTargetCompletedTargetCompletedTargetCompleted
2020-2150000616512500289640000270144100011536133500103097
2021-2270000567248000480030000296702000013389128000104583
2022-231300008520685201097933000354074000017577211520149169
2023-24125000872319000774145000334732000020022199000148467
2024-25114000630008000577542000257725100029262215000123809
2025-26**350002087540001995150009705575001440511150046980
Total5240003746874002034186205000161041229500106191998520676105
**up to the end of December 2025. · Survey, p. 150

New initiatives

  • “Spandana” –Call Center.
  • Developed a new website to ensure the transparency in the implementation and beneficiary-wise information made available to the public in the Company’s website http://ashraya.karnataka.gov.in.
  • Letters and Files are maintained in E-office.
  • Usage of ‘Vasathi Vigil’ mobile app used under Housing Schemes.
  • Based on GPS based physical progress the fund is released through Aadhar based account.
  • Aadhar linking, Ration card & caste and Income certificate are made mandatory to avoid bogus/ duplication.
  • The documents of various department are verified through web service.
  • The beneficiary list is approved through online using Digital Signature.
  • The SMS is sent to the Implementing Officers and beneficiaries at every stage i.e. after approval of the list, Opening of bank account, release of funds etc.
  • Using Fast Tract Technology in Housing Projects.
  • Under CM One Lakh Housing Scheme, online applications are received.

§ 4.4Rural Infrastructure

§ 4.4.1Karnataka Rural Infrastructure Development Ltd (KRIDL)

The Karnataka Rural Infrastructure Development Limited (Formerly known as Karnataka Land Army Corporation Limited) is having an objective to undertake and carry out all types of rural development work either entrusted to it by Government, Government Departments, Local Bodies, Undertakings, Institutions, Individuals etc., or on its own, and to provide assistance, advice and services therefore, including capital resource and technical, managerial and other services. The objective is to concentrate on labour intensive infrastructure works which are vital for development by providing employment opportunities to rural unemployed and under employed to improve their economic conditions and to undertake all rural development construction works directly by eliminating middlemen i.e., Contractors, to avoid exploitation of the rural poor, thereby passing on the full worth of money to the people. To attain the main object of the Company, the Company undertakes civil construction of tanks, irrigation works, low-cost housing, roads, culverts and buildings etc., in rural areas employing rural youth. The works are being executed directly at Government Scheduled Rates without the involvement of contractors. The Organization is a designed agency of the State Government for the purpose of departmental execution of works.

§ 4.4.2Quality Policy

KRIDL is committed for enhancing its success with services and responsiveness that set industry standards for not only quality and value, but for efficiency as well. The Company relentlessly strive to be the best in every aspect of the Company’s business, fostering a culture of high expectations and accurate delivery-at quick turn-around times. Credibility is everything, trust is inherent and responsibility lies with each individual. Transparent processes guarantee progression and efficient delivery controls reputation. During 2024-25, KRIDL has achieved turnover of Rs. Rs.2872.67 Crores with a net profit of Rs.292.42 crores. During the year 2025-26, the agency has achieved a progress of Rs.2193.15 crores (provisional) and profit is Rs. 231.81 crores up to end of December 2025.

§ 4.515th FINANCE COMMISSION

The 15th Finance Commission has allocated a grant of Rs. 2572.00 crore for rural local bodies for the year 2025-26, out of which Rs. 2186.20 crore (85%), Rs. 257.20 crore (10%) and Rs. 128.60 crore (5%) have been allocated to Gram Panchayats, Taluk Panchayats and Zilla Panchayats respectively. Rs. 607.55 crore has been released to Gram Panchayats for the year 2025-26.

§ 4.6Rural Water Supply

The Department of Rural Drinking Water and Sanitation is providing safe and adequate drinking water and sanitation facilities to the rural areas. Initially it was aimed to supply 55 LPCD potable water to each person every day and aims to provide household connections in all the habitations through the piped water supply schemes.

§ 4.6.1Jal Jeevan Mission (JJM)

The Central Government has an ambitious project, Jal Jeevan Mission, titled ‘Har Ghar Jal’, to provide clean water to all households in the country. The Jal Jeevan Mission Project is being implemented with the great objective of providing safe drinking water to all households in rural India by 2024 by providing Functional Household Tap Connection (FHTC). In addition to maintaining water sources, grey water management, water conservation, rain water harvesting and water source replenishment are also part of the project. Effective information, education and communication are the highlights of the project, which include a communitybased approach to aquatic life. The Water Life Mission will create a nationwide movement for water and this is everyone’s priority. Out of a total of 101,30,702 households in rural areas of the State, access to drinking water to the households is 24,51,220 before the implementation of the Jal Jeevan Mission and 63,12,480 households have been provided with water supply after the implementation of the Jal Jeevan Mission. 86.51 % of households in the State have water connection. Each of the 6768 villages in the State has the distinction of being 100% FHTCenabled villages with water connections under the Jal Jeevan Mission. In rural areas, the water system is considered to be the responsibility of the women in addition to maintaining the households. Village Water and Sanitation Committees have been set up in more than 28,000 villages across the State, with over 1.5 lakh women taking a leadership role in managing their community water resources, to make them self-sufficient and empowered. Women in rural areas may have greater responsibilities with managing water at home. Water quality surveillance from the local community of women enlightened citizens are essential for the delivery of service, training at least five women in each village to test the quality of potable water using Field Testing Kits (FTK) to test the quality of drinking water and to understand the effects of water-based chemical or bacterial contamination. Their ability to conduct hygiene checks is being developed. Information from women’s inspection is being given priority to take appropriate remedial measures to improve or protect drinking water sources and supply systems. Mason, plumber, electrician, motor mechanic and pump operator are being trained by the department to ensure long-term sustainability of water supply systems. For 2025-26, it is targeted to provide 10.00 lakh FHTCs, 2.39 lakh FHTCs are provided by incurring an expenditure of Rs. 446.15 crore up to the end of December 2025.

§ 4.7Water Quality Monitoring and Surveillance Programme (Wqm&sp)

Under Jal Jeevan Mission (JJM), water quality monitoring has been given utmost importance, as the water quality needs to be monitored on a regular basis to ensure potable water gets supplied to the rural households. There are about 2,20,000 rural public drinking water sources established in the State. At present, there are 31 District/ division level water quality testing laboratories and 47 Sub-divisional/Taluka level water quality testing laboratories in the state. Out of these 28 District/division level laboratories are NABL accredited & 46 Sub-divisional/Taluka level are recognized by NABL. These laboratories undertake analysis of totally 16 physio-chemical and microbiological parameters for the drinking water sources. Field water testing kits have been distributed to all the 5946 Gram Panchayaths to test the water during preand post-monsoon seasons. Training is also imparted to village water and sanitation committee (VWSC) for testing water quality using the kits.

§ 4.8Multi Village Scheme

Drinking water supply schemes under Jal Jeevan Mission (JJM) have been formulated in rural areas with surface water as source to tackle water quality problem. Habitations having ground water chemical contamination like Arsenic, Fluoride, TDS, Nitrate and Iron, the drinking water, will be supplied from nearest sustainable surface source after treatment. A total of 160 MVS schemes are taken up with an estimated cost of Rs. 37,561.36 Crores, of which 136 MVS schemes are under progress with an estimated cost of Rs. 35,836.79 Crores and 1 MVS scheme is yet to be awarded, remaining 23 MVS schemes are under administrative approval.

§ 4.9Rural Sanitation

§ 4.9.1Swachh Bharat Mission (SBM)-Gramin

As per the baseline survey conducted during the year 2012, it was reported that there were 70.26 lakh households, out of which 24.84 lakhs households had toilets and 45.42 lakh households were without toilets. Individual Household Latrines (IHHLs) were constructed for all the households that were reported to be without toilets by 19th November 2018 and Rural Karnataka was declared Open Defecation Free on 19th November 2018 on the eve of World Toilet Day. For the year 2025-26, an amount of Rs.383.04 Crores has been allocated in the budget for implementation of SBM-G scheme of which an amount of Rs.140 crores is released. Rs.77.78 crores has been spent at the end of Dec-2025.

§ 4.9.2Objectives of SBM (G) Phase II

The key objective of SBM (G) Phase II is to sustain the ODF status of villages and to improve the levels of cleanliness in rural areas through solid and liquid waste management activities, making villages ODF Plus. The above objective is to be achieved through continued Behaviour Change Communication and Capacity Strengthening at all levels. The biggest challenge of the SBM-G Program is to sustain the Open Defecation Free Status. In this regard, to sustain the Open Defecation Free Status, and to work on ODF-Plus activities, the Ministry of Jal Shakti, Department of Drinking Water and Sanitation has continued the implementation of Swachh Bharat Mission-Gramin (SBM-G) Phase II from 2020-21 to 2025-26. As per the guidelines of the programme, the following ODF-S (Sustainability) and ODF-Plus activities are being undertaken.

  • Construction and usage of Individual Household Latrines (IHHL).
  • Construction of Community Sanitary Complex (CSC).
  • Solid and Liquid Waste Management (SLWM).
  • Material Recovery Facility (MRF).
  • Construction of Faecal Sludge Management (FSM) Unit.
  • Construction of GOBARDHAN Unit.
  • ODF-S and ODF-Plus centric Information, Education and Communication, and Training activities.

The responsibility of implementation of SBM(G) programmes and activities fully vests with the Gram Panchayat institutions. Details of physical and financial progress achieved from the year 2020-21 to 2025-26 under SBM (G) (upto December-2025) is given in Table 4.5.

Table 4.5Physical and financial progress achieved from the year 2020-21 to 2025-26 under SBM (G)

(upto December-2025) (Rs in lakhs)

YearIHHLsCommunity Sanitary ComplexesSolid & Liquid Waste Management (Villages)Release (Central & State)Expenditure (Central & State)
2020-21179188517223103645.4235622.16
2021-2295811263205668861.5636055.01
2022-23139151591986764085.8721440.08
2023-247629235375668246.38163099.27
2024-259472556191326313.0217127.68
2025-26 (end of Dec-2025)57624105490414000.007778.17
Total517555463729019345152.25181122.37
Survey, p. 154

Action taken on the effective implementation of Swachh Bharat Mission (Gramin) are as mentioned below.

  • IEC cell has been established at State level to effectively implement Information, Education and Communication activities.
  • Various Information Education and Communication programs have been organized in all Gram Panchayats of the state to educate the public on cleanliness, usage of toilet and its maintenance, solid and waste management, menstrual hygiene management.
  • As per the 2012 baseline survey it was targeted to construct 1.24 lakh IHHL for the year 2025-26, out of which 0.58 lakh IHHL has been constructed.
  • Solid Waste Management units are operational in 5213 Gram Panchayts.
  • Under Grey Water Management, out of 26292 villages, 26292 DPRs are prepared and works started in 10803 villages.
  • Approval has been given for the construction of 400 community toilet complexes in the Kalyan Karnataka region at a cost of Rs. 25 lakh each, of which 105 units have been completed. Work on 293 units is in progress.
  • A Government order has been issued on 20.09.2023, granting administrative approval for the implementation of Material Recovery Facilities in 27 districts. Out of these, the tender process has already been completed. Work of 27 MRF units is in progress.
  • To achieve ODF sustainability in rural areas through the Faecal Sludge Management (FSM), the project aims to establish 121 model FSM units for scientific treatment and management of faecal sludge, for which Detailed Project Reports have been approved. Out of which 55 units are completed, 66 units are under progress.
  • With the objective of producing bio gas from raw waste, currently 75 Detailed Project Reports have been approved for the construction of bio gas units, of which 72 units have been completed and the work on pending units is in progress.
  • A total of 10950 villages have been declared as ODF Plus Model under the Swachh Bharat Mission (G) scheme. These villages have achieved full progress in open defecation-free sustainability, solid waste management and liquid waste management in accordance with the scheme guidelines.

§ 4.10Rural Energy Programmes

Biofuel Programmes in the State

§ 4.10.1The Karnataka State Bioenergy Development Board (KSBDB)

The Karnataka State Bioenergy Development Board was constituted by the State Government in 2010 to implement the ‘Karnataka State Biofuel Policy-2009’ announced by the Government to create awareness about bioenergy in the State of Karnataka. The main objectives of the Bioenergy Programme of Karnataka State Bioenergy Development Board are as follows: a) Under the Mahatma Gandhi National Rural Employment Guarantee Scheme and other forestry schemes biofuel plantation activities were taken up forest, common and farmers lands. During 2024-25 about 14.60 lakhs biofuel seedlings planted under the above scheme by the Forest Department. b) The KSBDB has set up 34 Bioenergy Research, Information and Demonstration Centres (BRIDCs) in all the district across the state. These centers collect seeds from farmers, processing, value addition, marketing, training, awareness, R&D activities on bioenergy. During the year 2025-26, total 14,694 litres biodiesel produced and utilized. c) 04 biofuel parks are established at Madenur, Hassan (UAS, Bengaluru), Tinthini, Yadagiri dist. (UAS, Raichur), Dharwad (UAS,Dharwad) and Keladi Shivappa Nayaka Agricultural and Horticulture University, Shivamogga (KSA&HUS). These parks are providing the training, processing, formation of farmers groups, development of high oil yield seedlings, R&D works etc.,. d) Clonal Orchards have been established at 9 locations in 3 forest ranges in collaboration with Forest Department( Research and Utilization wing) for the development of high quality yielding biofuel seedlings. e) KSBDB established the Laboratory at University of Agricultural Sciences, Bengaluru. This Laboratory has taken up research activities, testing of the quality parameters of raw material, finished and other value added products. This Laboratory is Accredited by National Accreditation Board for Testing and Calibration Laboratories (NABL). f) The Biofuel programme in Karnatakra is designed to bring about total participation of the farming community, landless labourers, Self Help Groups. The board involved 12 NGOs in 12 Districts to create awareness and increase their participation in all bioenergy activities. g) Encouraged Engineering Colleges, Universities and Premier Institutions for taking up research projects under Students Projects Programme (SPP) in association with Karnataka State Council for Science & Technology (KSCST) For the available amount of Rs. 376.75 lakhs (Rs.300.00 lakhs + OB of Rs.76.75 lakhs) for the year 2025-26, the expenditure incurred is Rs. Rs 264.46 lakhs as per approved action plan till December 2025.

  • Implementation of ‘Karnataka State Biofuel Policy- 2009’ for the development of biofuel resources for consistent supply chain and environment protection.
  • Identifiction of various suitable species and lands for different geo-climatic conditions to develop block plantations.
  • Motivation to farmers to grow various type of biofuel species an agro forestry model and generating rural employment.
  • Design technologies and value additions for the development of biofuels.
  • Invite private investors, formation of partnerships, taxation on trading, simplify in use of bio-ethanol and biodiesel blended fuel.

§ 4.10.2Implementation of Bioenergy Development Programme

§ 4.10.3Institutional support for Rural Energy Development

Mahatma Gandhi Institute of Rural Energy and Development (MGIRED)

Mahatma Gandhi Institute of Rural Energy and development is primarily providing awareness and skill development training to elected representatives of rural local bodies, officers of RDPR & other related departments, School & College students, women NGO, SHGs, General Public etc., on renewable energy, Energy Conservation, Solid waste management, Environment Protection, Rain Water Harvesting, Forestry and Leadership etc. For the financial year 2024–25, an amount of Rs. 450.00 lakh was allocated, and including the opening balance of Rs. 165.00 lakh, a total of Rs. 615.00 lakh was available. During the year, a total of 447 training programmes were organized, through which 23,026 participants were provided training. An amount of Rs. 555.00 lakh was expended towards administrative and training activities. In the budget for the financial year 2025–26, an amount of Rs. 450.00 lakh was allocated. As of 31-12- 2025, Rs. 337.50 lakh has been released by the Government. Including the opening balance of Rs. 60.00 lakh, a total amount of Rs. 397.50 lakh is available. Utilizing the above funds, the institution conducted 251 training programmes, through which 13,719 participants were trained up to 31-12-2025. In addition to these training activities, the institution actively participated in several important state-level public outreach events. The institution showcased a tableau (Reg-Renewable energy and Solid waste management) in the Mysuru Dasara procession and participated in exhibitions organized by the Government on the occasion of World Environment Day. Further, the institution also took part in the Agricultural Fair organized at the Gandhi KrishiVigyana Kendra (GKVK), Bengaluru.

§ 4.11Rural Communications

The total length of rural roads in Karnataka as on 31.12.2025 is 1,98,496 kms. Improvements of rural roads and their maintenance are being taken up under Pradhana Manthri Gram Sadak yojana (PMGSY), Namma Grama Namma Raste Yojane (NGNRY) and Mukhya Mantri Gramina Raste Abhivruddi Yojane (CMGSY).

§ 4.11.1Pradhana Manthri Gram Sadak Yojana (PMGSY)

PMGSY was launched with an objective to provide rural connectivity by way of all weather roads to eligible habitations having a population of 500 and above. Under this programme for the FY 2025-26 Rs 156.60 crore has been allocated, of which Rs. 22.85 crore has been spent towards 22.834 kms of road works. For the maintenance of roads Rs. 59.08 crore has been allocated, of which Rs.19.77 crore has been spent for maintaining of 3270.49 kms of road length up to the end of November 2025.

§ 4.11.2Mukhya Mantri Gramina Raste Abhivruddi Yojane

During 2025-26, an amount of Rs.1000.00 crore has been allocated of which Rs.750.00 crore has been released. An expenditure of Rs 644.00 crores has been incurred up to the end of December 2025.

§ 4.11.3Kalyana Patha

“Under the Kalyan Path Scheme, a total of 1150.00 km of roads will be developed in 38 rural assembly constituencies of Kalyan Karnataka under the Pradhan Mantri Gram Sadak Yojana model at a cost of Rs. 1000.00 crores.”

  • 1150.00 km of rural roads will be implemented in the Kalyan-Karnataka areas of Bidar, Kalaburagi, Yadgir, Koppal, Raichur, Bellary and Vijayanagara.
  • As per PMGSY norms, the Kalyan Path project works will be undertaken with a 3-stage quality control system to develop good quality roads and the annual maintenance of the said works for 5 years and the re-asphalting work in the 6th year will be carried out by the original contractor. The Progress of the scheme as on December 2025 is as detailed in Table 4.6.
Table 4.6Progress of the Kalyan Path Scheme as on December 2025
Number of Vidana Sabha ConstituencyTotal Number of PackageTotal number of worksLength (km)Total Estimated Cost (Rs.in Crores)Completed Works Length (km)Total Expenditure (Rs.in Crores)
38632861124.911000.00168.37208.56
Survey, p. 157

§ 4.11.4Pragathi Patha

  • Approval has been given by the Government on 12-03-2024 to develop 7,110.00 km of rural roads under the Gati Path Scheme at a cost of Rs. 5,190.00 crores.
  • Under the current scheme, 5,400.00 kms of rural roads have been developed at a cost of Rs. 3,936.06 crores, allocated by the government to the Legislative Assembly constituencies.
  • Accordingly, the Legislative Assembly has identified 1353 roads, prepared a priority list and sent it to the ADB team for review. Out of these, 189 roads were objected to as they passed through biologically sensitive zones and protected forests. Appropriate adjustments have been made to them and details have been submitted. Accordingly, the ADB team conducted a review and approved the alignment of 141 roads and additional information was requested for the remaining roads. Additional information was provided by 16.01.2026 and the ADB team’s opinion is awaited.
  • Pragati Path DPR. The DPR process of the consultants has been completed and currently for 18 roads and 14 bridges consultants have been instructed to prepare and submit DPRs as per ADB norms. Out of this, DPRs of 191 roads have been submitted to the Sub-Divisional and DPRs of 30 roads to the Divisional Office and the said DPRs are under scrutiny. 13 sample DPRs have been sent to the ADB team for review.
  • The review of the Tender Document survey report by the ADB team is in the final stage and a final meeting was held on 13-01-2026 to discuss the amendments made so far.

§ 4.12Wage Employment Programmes

§ 4.12.1Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS)

Mahatma Gandhi National Rural Employment Guarantee Act is being implemented in all the districts with an objective to enhance livelihood security in rural areas by providing 100 days of guaranteed wage employment in a financial year to every household whose adult members volunteered to do unskilled manual work as per demand, resulting in evaluation of productive assets of prescribed quality and durability, Strengthening the livelihood resource base of the poor, Pro actively ensuring social inclusion and strengthening of PRIs. Funds will be shared between the GoI & GoK in the ratio of 90:10 Labour and material ratio shall be maintained at 60:40. For 2025-26, an amount of Rs.3404.13 crores has been released as against the outlay of Rs. 5800.0 crores (including wage component), of which Rs.2918.97 crores has been utilized to generate 680.35 lakh mandays up to Dec 2025. About 21.5 lakhs households have been provided employment as against the demand of 45.28 lakh during the current year. 8.93 lakh works have been undertaken of which 2.94 lakh works are completed and the remaining 5.99 lakhs works are under progress.

§ 4.13Rural Governance

Rajiv Gandhi Panchayat Raj Fellowship

  • Under the Rajiv Gandhi Panchayat Raj Fellowship Programme, in order to strengthen local governance in Bidar, Kalaburgi, Yadgir, Raichur, Koppal, Bellary and Vijayanagar districts of Kalyana Karnataka division, an order has been issued on 08-09-2023 to select 51 fellows, one from each taluka, on a monthly fellowship payment basis of Rs. 60,000/- for a period of 24 months.
  • Programme Management Unit has been established at Karnataka Panchayath Raj Commissionerate, Bengaluru to oversee the Rajiv Gandhi Panchayat Raj Fellowship Prgramme.
  • 51 fellows have been selected and are trained by Abdul Nazir Saab State Rural Development and Panchayat Raj Institute, Mysuru and assigned to the taluks of Kalyan Karnataka Division.
  • Rajiv Gandhi Panchayat Raj Fellows are responsible for qualitative change in the implementation of key government programmes by persuading the Gram Panchayats.

§ 4.14Responsibility Map

As part of the 30th anniversary of the Karnataka Gram Swaraj and Panchayat Raj Act, 1993, a responsibility map has been scientifically formulated to strengthen the decentralization system and to transfer the functions allocated to the Gram Panchayats under the 73rd Amendment to the Constitution. The Notification has been issued for fixing the responsibility of the programmes/activities among the Panchayath Raj Institutions of the following departments namely, Scheduled Tribes Welfare, Health and Family Welfare, Backward Classes Welfare, Agriculture, Watershed Development, Sericulture, Minority Welfare, Scheduled Castes Welfare, Animal Husbandry and Veterinary Services, Energy and Horticulture.

§ 4.15Vision Plan

The 73rd Amendment to the Constitution has transferred 29 functions to Panchayat Raj Institutions and Karnataka has made significant progress in strengthening these institutions along with empowering the community. The provisions of the Karnataka Gram Swaraj and Panchayat Raj Act have provided a good opportunity in this direction. An important provision as per Section 309(B) of this Act relates to the preparation of vision plans of Gram Panchayats after the elections. Apart from involving the community through Participatory Rural Appraisal (PRA), it should be prepared keeping in mind the state and local goals. Karnataka has taken up this initiative. The State has considered local sustainable development goals in the process of preparing the vision plan and the Panchayat Raj institutions, especially the Gram Panchayats are the focal points for these achievements. The state has identified the following areas namely, Poverty, livelihood and skill development, Health, Education, Women and child development, Environment and natural resources, Socially Secured Panchayats, Infrastructure self-sufficient Gram Panchayats and Good governance for preparing the Gram Panchayat Vision Plan. For each of the above areas, indicators have been identified for the purpose of setting targets and the Gram Panchayats have collected the relevant data with the support of officials from other development departments. The following process has been adopted for preparing the plan at the Gram Panchayat level: Step –1: Formation of Gram Panchayat and Village Planning Committees Step –2: Secondary Data collection Step –3: Focussed group discussions and participatory rural appraisal Step –4: Organizing meetings of habitation and ward sabha Step –5: Preparation of draft perspective plan analysing the situation Step –6: Organizing a meeting of Gram Panchayat Standing Committee on Finance, Audit and Planning. Step –7: Gram Panchayat Meetings Step–8: Organising Grama Sabhas Step–9: Consolidation of Gram Panchayat perspective Plan Step–10: Uploading the perspective plan in Panchatantra 2.0 portal. All the Gram Panchayats have their perspective Plan. The Integrated Participatory Annual Action plan - Gram Panchayat development plan is prepared on the basis of Gram Panchayat Perspective plan

§ 4.16Koosina Mane

  • Under the Mahatma Gandhi NREGA scheme, a target has been set to start 4000 child care centers under the name of “Koosina Mane” in the Gram Panchayats that have created the highest number of man-days and the program has been launched on 17.09.2023. So far, 3887 child care centers have been started.
  • 55415 children are registered in the Koosina Mane and 32843 children are receiving care daily.
  • 29005 caretakers have been trained for child care in Koosina Mane.
  • The government has released Rs. 1.21 lakh for each Koosina Mane in the year 2023-24, Rs. 1.00 lakh in the year 2024-25 and Rs. 75,000 in the year 2025-26 for nutritious food and caretaker remuneration expenses.
  • Children are being provided nutritious food in the daycare centers as per the local diet.
  • Monitoring committees have been formed at the state, district, taluk and gram panchayat levels to monitor the Koosina Mane.

§ 4.17e-GOVERNANCE

§ 4.17.1eSwathu 2.0

The Rural Development and Panchayat Raj (RDPR) Department manages approximately 1.5 crore property records (Khatas), which were traditionally maintained in manual registers at the Gram Panchayat level. Citizens were previously required to physically visit Gram Panchayat offices to avail Khata-related services. To modernize and streamline property administration, the Government of Karnataka has mandated eKhata for all property registrations with effect from October 2024. Further, pursuant to the Karnataka Gram Swaraj and Panchayat Raj (Amendment) Act, 2025, the Department is shifting from a demand-driven model to a campaign-based initiative. In line with the above statutory amendments, the Department has notified the Karnataka Gram Swaraj and Panchayat Raj (Taxes, Rates and Fees of Gram Panchayats) Rules, 2025. Under these Rules, the Department shall facilitate the issuance of eKhatas for over 95 lakh digitized properties available on the Panchatantra 2.0 platform, enabling citizens to obtain their eKhatas completely through online mode, without the need to visit the Gram Panchayat office through eSwathu 2.0 Application.

§ 4.17.2Panchmitra Portal

A single platform called “Panchamitra” has been developed and implemented by the Department of Rural Development and Panchayat Raj to provide information and details of all the Gram Panchayats in the state under the Department of Rural Development and Panchayat Raj, to apply online for services related to Gram Panchayats, to check the status of applications submitted and to register grievances related to Gram Panchayats.

§ 4.17.3Panchamitra Whatsapp Chatbot

Whatsapp Chatbot is developed and implemented for the first time in the country to get various information and details of all the Gram Panchayats of the state, to apply the services related to Gram Panchayats online, to check the status of applications and to register grievances related to Gram Panchayats. So far, 1,70,659 users have used Panchamitra Whatsapp Chatbot and 7,136 grievances have been registered through Panchamitra Whatsapp Chatbot.

§ 4.17.4Promotion of digital payments in Gram Panchayats

Android PoS machines have been provided by the government to all 5946 Gram Panchayats of the State. Property tax collection of Rs.1,313/- crore has been done from Date:24.04.2023 through the said machines.

§ 4.17.5Services of Atalji Janasnehi Kendras

44 Atalji Janasnehi Kendra (Nadakcheri) services have been provided at the Bapuji Seva Kendras of the Gram Panchayats.

§ 4.17.6eOffice Implementation in Gram Panchayats

The department intends to implement e-Office in Gram Panchayats and so far e-Office has been implemented in 994 Gram Panchayats.