Urban Development
Every numbered paragraph has its own address. Paragraph 5.10.1 is at /granthalaya/varta/state-economic-surveys/karnataka/2025-26/5#5.10.1; figures, tables, appendix tables and boxes as #chart-…, #table-…, #table-A… and #box-….
§ 5.1Urban Development
Urban development remains a central pillar of Karnataka’s growth strategy, positioning cities as engines of economic dynamism and social inclusion. With rapid urbanisation reshaping demographic and economic patterns, the State is strengthening Urban Local Bodies (ULBs) to deliver sustainable, resilient, and citizencentric services. The Government’s approach integrates fiscal investment, environmental stewardship, and technology-driven governance to enhance liveability, competitiveness, and balanced regional growth. The Urban Development Department, excluding housing and slum development, is responsible for ensuring essential civic amenities, progressive urban planning, infrastructure upgradation, and effective implementation of State and Central schemes. With rapid urbanisation and expanding city boundaries, the Department’s mandate has widened considerably to address growing infrastructural and governance demands. Its core responsibilities include the provision of urban infrastructure, ensuring drinking water supply and sewerage systems, preparation of comprehensive and progressive development plans for sustainable city management, upgrading and reforming basic infrastructure, extending accommodation and support services to vulnerable groups, and implementing State, Central, and other externally supported schemes.
§ 5.2Urban Development: Budgetary Commitment and Infrastructure Focus
For the financial year 2025–26, a budgetary allocation of Rs.18,249.71 crore has been made for Urban Development programmes. Of this, Rs.12,183.58 crore has been expended up to the end of December 2025, reflecting steady progress in implementation. Urban infrastructure encompasses critical services such as drinking water supply, sanitation, sewerage systems, electricity and gas distribution, urban transport, primary health services, and environmental regulation. These services are essential for sustaining economic growth, managing population expansion, and enhancing the quality of urban life. Karnataka is among the water-stressed states in India. Approximately 38 per cent of its population resides in urban areas, compared to the national average of 28 per cent. In this context, effective water resource management and sustainable sanitation systems are indispensable to prevent water scarcity from becoming a constraint on economic development.
§ 5.3Karnataka Urban Water Supply and Drainage Board (Kuws&db)
The Karnataka Urban Water Supply and Drainage Board (KUWS&DB) is a statutory authority and a designated implementing agency responsible for planning and executing drinking water supply schemes and underground drainage (UGD) systems in 316 Urban Local Bodies, excluding areas under the jurisdiction of the Greater Bangalore Authority (Bruhat Bengaluru Mahanagara Palike). The Board’s mandate is to ensure adequate and safe drinking water from assured sources, along with effective sanitation and sewerage services across urban areas of the State. To date, assured and safe surface water– based drinking water projects have been implemented in 259 Urban Local Bodies. Underground sewerage facilities have been provided in 82 Urban Local Bodies. Since its inception, KUWS&DB has completed 639 water supply projects with an investment of Rs.11,253.33 crore and 180 sewerage projects with an investment of Rs.5,180.71 crore, up to the end of December 2025. These interventions collectively strengthen urban water security and sanitation infrastructure across Karnataka.
§ 5.3.1Achievement for the year 2025-26
During the current financial year, the Board has proposed a total of 21 projects with an aggregate estimated cost of Rs.1,833.00 crores and has commissioned 5 projects, with a cumulative estimated cost of Rs.198.00 Crores upto the end of December 2025.
§ 5.3.2Challenges
- Delay in handing over of Government/Private lands required proposed for construction of Different Components in implementation of the projects and Delay in obtaining permission from other departments. This may cause Additional cost/delay in implementation of projects.
- Land clearance issues.
§ 5.3.3Information on Innovation and Best Practices
Board has implemented prestigious challenged Projects in the recent years and received award from the Government of India. Such projects are:- “Drink from Tap” Continuous Water Supply (24x7) in Alnavar Town, Karnataka - A Scalable Model for Small- Town Water Reform: Alnavar, a town in Dharwad District in Karnataka, successfully transitioned from a severely intermittent and inefficient water supply system to a fully metered, 24x7 Drink from Tap (DfT) model. Alnavar stands as the first small town in Karnataka to deliver universal, continuous, and pressurized Drink from Tap (DfT) 24x7 water supply system which can be referred to as ‘A Scalable Model for Small-Town Water Reform’. The Water Supply Scheme to Alnavar Town with an estimated cost of Rs.71.90 crores, with the Kali River as the source was commissioned in July 2022 The Government of India has identified the said project and an Appreciation of Special Mention for Local Solutions in Regional Language in the Urban Learnathon 2023 was given by National Institute of Urban Affairs, Ministry of Housing and Urban Affairs, GoI.
§ 5.3.4Replenishment of Tolanakeri lake using PHYTORID Technology STP for replenishment of Tolanakeri lake, Hubballi city under AMRUT
Recognized by National Water Mission, Ministry of Jal Shakti, Department of Water Resources, Government of India (https://nwm.gov.in/replenishment-tolanakeri-re-using-treated-used-wate)as a BEST PRACTICE under the theme of REUSE OF TREATED WATER during December 2024 and documented on the official National Water Mission portal.
§ 5.3.5Background
Tolanakeri Lake, located in the Akshay Park area of Hubballi city, Dharwad District, Karnataka, usually dried up during the summer, to address this, an alternative water source was established through a decentralized Used Water Treatment Plant (UWTP) near the lake to treat used water collected from surrounding areas via the existing sewer line, in compliance with KSCPB norms. The UWTP was also designed to integrate aesthetically with the lake environment and surrounding landscaping. Accordingly, the Karnataka Urban Water Supply & Drainage Board (KUWS&DB) implemented a 1 MLD Phytorid UWTP under the AMRUT scheme on the upstream side of the lake. The plant draws used water from a nearby sewer trunk main, treats it to tertiary standards, and discharges the treated water into Tolanakeri Lake to replenish and maintain water levels.
§ 5.3.6Objectives
Replenishment of Tolanakeri lake which has a capacity of about 900 ML with the following objectives:
- Maintain water level in the lake at FTL (Full Tank Level) throughout the year.
- Provide alternative source of water to the lake in absence of rains.
- Improve the ground water table.
- Improvements in the bio-diversity of the lake.
- Improvement of recreational activities.
§ 5.3.7Innovation
The construction of a decentralized Used Water Treatment Plant (UWTP) using Phytorid technology in the vicinity of a water body, utilizing sewer mains aligned with the natural topography, represents an innovative approach to providing a sustainable water source for lakes or other water bodies.
§ 5.3.8Outcome
Operational Status and Outcomes of Tolanakeri UWT. The Used Water Treatment Plant (UWTP) was commissioned in May 2020. The implementation of this project has resulted in the following improvements:
- Continuous discharge of approximately 1 MLD of treated used water prevents the lake from drying up, providing an alternative water source in the absence of rainfall.
- Increase in the groundwater table in the surrounding area.
- Enhanced recreational activities in and around the lake.
- Improved aesthetic environment through the cultivation of ornamental and flowering plants.
- Enhancement of the lake’s biodiversity.
§ 5.3.9Phytorid Technology For Used Water Treatment Plant
It is a self-sustaining technology developed by National Environmental Engineering Research Institute (NEERI), CSIR that works on the principle of natural wetland. It has been developed and patented by CSIR- National Environmental Engineering Research Institute (CSIR - NEERI). This technology has also obtained the authorization from Council of Scientific & Industrial Research. PHYTORID system is based on natural treatment methods and has distinctive advantages over conventional treatment plants. In this technology, treatment occurs via natural methods such as filtration, sedimentation, nutrient uptake by plants and microbial action in a constructed system which is filled with filter media. Specifically identified species of plants which are known to have good nutrient uptake are planted in the filter media.
§ 5.4Karnataka Urban Infrastructure Development and Finance Corporation (KUIDFC)
Development of Infrastructure works in ULBs and also to provide technical, financial, consultancy and other assistance, KUIDFC has been established during 1993.
§ 5.4.1Nodal Agency
KUIDFC has been appointed as the Nodal Agency of the State for implementation of various External Aided Project and Central & State Government sponsored urban infrastructure development projects in the state. KUIDFC acts as nodal agency for utilizing funds from Government of Karnataka, Government of India, World Bank, ADB and raise resources from Financial Markets, provides financial and technical assistance to all Urban Local Bodies also provides financial assistance in the form of loans and grants for Urban Infrastructure Projects taken up by the ULBs.
§ 5.5Karnataka Integrated Urban Water Management Investment Program (Kiuwmip)
The Karnataka Integrated Urban Water Management Investment Program (KIUWMIP): KIUWMIP is implementing ADB assisted programme to provide Under Ground Drainage (UGD) facility and continuous water supply to selected Eight (08) towns/cities namely, Davanagere, Harihara, Ranebennur, Byadgi, Mangalore, Udupi, Puttur & Kundapura and also implementing reforms in selected Urban Local Bodies. The cost of the project is of Rs.2607.00 crores (Tranche-1 & 2) and the cumulative expenditure is of Rs.2427.00 crores. This project covers 377 Sq.km area and benefits 1.3 million population. During the current year, an amount of Rs.50.00 crores is allocated in the budget, of which Rs.33.74 crores has been spent up to the end of Nov 2025. Total 28 works are taken up under KIUWMIP. Four (04) UGD works & Eight (08) Water Supply works are taken up in Davanagere, Harihara, Ranebennur and Byadgi towns under Tranche-1, and Eight (08) UGD & eight (08) Water Supply works are taken up in Mangaluru, Puttur, Udupi and Kundapura towns under Tranche-2. Total 21 works, Eleven (11) works in Tranche-1 and Ten (10) works in tranche-2 are completed. Four (04) IT modules of 1) GIS based Billing and Collection 2) Integration with existing Ring-Fenced Accounting system 3) MIS/GIS Reports, NRW accounting, Water Quality & Performance 4) GIS based Asset Management with SCADA are developed in KIUWMIP Project and implemented in Harihara, Ranebennur, Davanagere Puttur & Kundapura cities.
§ 5.5.1The World Bank assisted Karnataka Urban Water Supply Modernization Project (KUWSMP)
Government of Karnataka with World Bank assistance has approved Rs.3740.00 Crores for the implementation of Karnataka Urban Water Supply Modernization Project (KUWSMP) in Hubballi-Dharwad, Belagavi and Kalaburagi under Design-Build-Operate & Transfer (DBOT) model contract to provide 24x7 water supply to the citizens. The project is aimed to provide total 3,12,700 House Service Connections (HSCs) in all the three project cities. Details are as follows:
| Project City | No of House Service Connections |
|---|---|
| Hubballi-Dharwad | 1,45,700 |
| Belagavi | 85,000 |
| Kalaburagi | 82,000 |
| Total | 3,12,700 |
The project period is 12 years including 5 years of Design-Build Period and 7 years of O&M period. Project commenced in June-2020 and proposed to complete implementation (Design & Build) period by June-2025 and O&M period by June-2032. The Design -Build works are under progress.
§ 5.5.2Jalashuddhi Mission (Used Water Management)
KUIDFC is appointed as the Nodal agency for implementation of Used Water Management (UWM) in the ULBs of the state under Swachh Bharat Mission (Urban)-2.0 and National Green Tribunal (NGT) Environment Compensation Fund. The objective of the Government is to undertake construction/upgradation of sewerage system and STP units under the project in order to prevent pollution of rivers/other water sources in the towns. A grant of Rs.3277.28 crores is approved for the towns selected for the said project and the works are under progress. The details are as follows: 110 towns are selected for construction of FSTPs under NGT funds with a grant of Rs.400.24 crores. Currently works are completed in 9 towns and works are under implementation in 101 towns. A grant of Rs.1518.00 crores for 55 cities/towns are approved under NGT Environmental Compensation Fund for construction/upgradation of sewerage system. Currently implementation of works are underway in 35 towns and Letter of Acceptance (LoA) have been issued for 6 works. 6 works are under tender process and DPRs are under preparation for 8 towns. A grant of Rs.1359.04 crore for 268 cities/towns are approved under Swachh Bharat Mission (Urban)-2.0 for construction/upgradation works of Sewerage Treatment Plants (STPs). Currently, implementation of works are underway in 20 towns and Letter of Acceptance (LoA) have been issued for 36 towns. 92 works are under tender process and DPRs are under preparation for 91 towns. 29 towns are dropped under SBM (U) 2.0 as KUWS&DB has already taken up the works.
§ 5.5.3Financial Releases & Expenditure
Rs.101.00 crores is released under NGT Environmental Compensation Fund with an expenditure of Rs. 34.40 crores upto the end of December-2025 and Rs.7.90 crores has been authorized under Swachh Bharat Mission (U)-2.0 & expenditure of Rs. 4.70 crores is incurred upto the end of December-2025.
§ 5.5.4Way Forward
In view of providing City-wide access to a continuous piped water supply in Belagavi, Hubballi-Dharwad and Kalaburagi cities in the state of Karnataka and to strengthen service delivery arrangements at the city level. The key project activities include capital works and services to improve water supply systems in these three cities to meet water demand reduced non-revenue water, network expansion, setting up of City Water Company (CWC) thereby supporting the state in strengthening the urban water sector.
§ 5.5.5New Innovations Initiated under the project
Customer Centric Initiatives
- Simplified House Service Connection procedures (Steps, process, documents and payment options for connection fee and connection cost) to ensure providing connections to all consumers in a time bound manner.
- DMA approach has been adopted to ensure providing connections to all customers/properties in a time bound manner.
- Integration of properties into GIS which will be linked with consumer billing data.
- Service Delivery Improvements initiated.
- Introduced Bulk SMS services in the water supply related issues for the benefit of citizens in project cities.
- Introduced tollfree Numbers to raise water supply related complaints in all three project cities.
- Established 9 Customer Service Centers (for every 20,000 HSCs) in all three project cities to provide quality services to consumers on water supply.
- Established one Community Liaison Cell in each city for addressing water supply related issues of Urban poor.
- Established “Digitized End to End Customer Redressal Management System and Central Control Centre (CCC) in each city, a dedicated centre to receive the calls around the clock (24x7).
§ 5.6Bangalore Water Supply and Sewerage Board
The Bengaluru Water Supply & Sewerage Board (BWSSB) is a statutory body of the Government of Karnataka responsible for providing potable water supply and sewerage services to Bengaluru city and its expanded areas, including newly added villages. The Board manages water sourcing (primarily from the Cauvery River), treatment, transmission, distribution, sewerage networks, sewage treatment plants (STPs), wastewater reuse, billing, and customer services.
§ 5.6.1Vision and Mission
- To ensure sustainable, reliable, and equitable water supply and sewerage services for Bengaluru while protecting water resources and the environment.
- Provide safe and adequate drinking water to all sections of society.
- Achieve comprehensive sewerage coverage and effective wastewater treatment.
- Promote water conservation, reuse, rainwater harvesting, and smart water management through technology and innovation.
§ 5.6.2Projects Status
- Cauvery Water Supply Scheme (including Stage V): Augmentation of water supply to meet the needs of a growing population and newly added areas.
- Sewerage & STPs: Expansion and upgradation of Sewage Treatment Plants with tertiary treatment facilities.
- Treated Water Reuse: Supply of treated wastewater for industrial use, lake rejuvenation, gardening, construction, and groundwater recharge.
- Smart Metering & Digital Initiatives: Pilot implementation of smart water meters for real-time consumption monitoring, leak detection, reduction of non-revenue water, and improved billing efficiency.
- Rainwater Harvesting (RWH): Mandatory RWH systems for buildings as per regulations, along with BWSSB support for awareness and compliance.
§ 5.6.3Achievements
- Improved water supply coverage and enhanced treatment capacity.
- Significant increase in reuse of treated wastewater, reducing dependence on freshwater sources.
- Promotion of RWH leading to groundwater recharge and reduced stormwater runoff.
- Introduction of smart meters improving transparency, demand management, and customer service.
- Citizen-friendly schemes such as Sarala Cauvery for easier household connections.
§ 5.6.4Key Challenges
- Rapid urbanization and rising per capita water demand.
- Dependence on Cauvery water and climate variability.
- Infrastructure aging, leakages, and enforcement of RWH compliance.
- Financial sustainability while maintaining affordability.
§ 5.6.5Way Forward
- Completion of Cauvery Stage V and future augmentation projects.
- Universal sewerage coverage with 100% sewage treatment and maximum reuse.
- Scaling up smart meters, digital dashboards, and data-driven decision-making.
- Strengthening RWH implementation and integration with groundwater recharge systems.
- Enhancing public participation in conservation and efficient water use.
§ 5.6.6Innovations adopted
Smart water meters for consumption analytics and loss reduction.
- Mandatory reuse of treated wastewater for non-potable purposes.
- Large-scale adoption of RWH in residential and commercial buildings.
- Water-saving devices such as aerators and awareness campaigns.
- Tariff rationalization and One-Time Settlement (OTS) schemes.
- Incentives and regulatory measures for treated water use and RWH compliance.
- Enforcement against misuse of potable water and illegal connections.
§ 5.6.7Sanitation
Effective sanitation ensures public health and environmental quality. BWSSB focuses on safe waste collection, treatment, and reuse, contributing to sustainable urban development.
§ 5.7Swachh Bharat Mission- 2.0
The Ministry of Housing and Urban Affairs, Government of India, has implemented the Swachh Bharat Mission (Urban)–2.0, which is in force up to the year 2026. The approved Action Plan amounts to a total of Rs.5,050.28 crore (awaiting for the approval of a revised Action Plan of Rs.98.40 crore), comprising the Central share of Rs.2,245.30 crore, the State share of Rs.1,415.08 crore, and the Urban Local Bodies’ share of Rs.1,389.90 crore (including BBMP). Out of this, an amount of Rs.1,219.68 crore has been allocated to BBMP. Under SBM – 2.0, the following components have been approved for the implementation of the program: i. Solid waste management with the approved cost of Rs. 1969.13 crores. ii. Sanitation with the approved cost of Rs. 177.92 crores. iii. Used water management with the approved cost of Rs. 2252.87 crores. iv. Capacity Building with the approved cost of Rs. 184.58 crores. v. IEC activity with the approved cost of Rs. 367.39 crores.
Solid Waste Management (SWM)
§ 5.7.1Wet Waste Management
In 91 Urban Local Bodies (ULBs), Detailed Project Reports (DPR) with a capital investment of Rs. 51.41 crores for implementation of wet waste management have been approved by the State-Level Technical Committee and the High-Powered Committee. Under this component, a total of 1,073 works have been taken up, out of which 492 works have been completed, 456 works are under progress, and tenders for the remaining 125 works are under process.
§ 5.7.2Dry Waste Management
In 309 ULBs, DPRs for dry waste management units with a capital investment of Rs.258.83 crores have been approved by the State-Level Technical Committee and the High-Powered Committee. Under this component, 2,377 works have been taken up, of which 1,138 works have been completed, 1,081 works are under progress, and tenders for the remaining 158 works are under process.
§ 5.7.3Legacy Waste Management
In 222 ULBs, DPRs for legacy waste remediation with a capital investment of Rs.440.20 crores have been approved by the State-Level Technical Committee and the High-Powered Committee. Under this component, 346 works have been taken up, out of which 99 works have been completed, 167 works are under progress, and tenders for the remaining 80 works are under process.
§ 5.7.4Mechanized Road Sweeping Machines
In 4 ULBs, DPRs with a capital investment of Rs.2.75 crores for procurement of mechanized road sweeping machines have been approved by the State-Level Technical Committee and the High-Powered Committee. Accordingly, 4 Municipal Corporations have procured mechanized road sweeping machines through tender as per KTPP rules.
§ 5.7.5Establishment of Transfer Stations
In 3 ULBs, DPRs with a capital investment of Rs.27.47 crores for establishment of Transfer Station units have been approved by the State-Level Technical Committee and the High-Powered Committee. The works are under progress in all the 3 Municipal Corporations.
§ 5.7.6Construction & Demolition (C&D) Waste Management
DPRs with a capital investment of Rs.18.12 crores have been approved for establishment of C&D waste management units in Kalaburagi, Davanagere, Mysuru, and Hubballi–Dharwad Municipal Corporations. The tender process is under progress in Kalaburagi Municipal Corporation and in the remaining Municipal Corporations the works are under progress.
§ 5.7.7Sanitary Landfill (SLF) Units
In 226 ULBs, DPRs with a capital investment of Rs.30.76 crores for establishment of SLF units have been approved by the State-Level Technical Committee and the High-Powered Committee. Under this component, 226 works have been taken up, of which 129 works have been completed, 72 works are under progress, and tenders for the remaining 25 works are under process.
§ 5.7.8Sustainable Sanitation
Under this component, works have been approved with a capital investment of Rs.164.41 crores for construction of 2,476 public toilets, 1,218 aspirational toilets, 2,452 community toilets, and 2,726 urinals, totalling 8,872 toilet seats. Out of these, 6,838 toilets have been completed, while 2,034 toilets are under progress.
§ 5.7.9Used Water Management
An amount of Rs.2,252.87 crores has been allocated for used water management. The details are as follows:
§ 5.7.10Sewage Treatment Plants (STPs)
In 268 ULBs, approval has been accorded for construction of STPs with a total capacity of 927.26 MLD at a capital cost of Rs.1,359.04 crores. Among these, works have commenced in 20 ULBs, work orders have been issued in 37 ULBs, the tender process is under progress in 14 ULBs, and the remaining 197 ULBs are in the preparation stage of DPR.
§ 5.7.11Interception & Diversion (I&D)
A PDMC team has been appointed for preparation of DPRs for I&D works, and the DPR preparation process is under progress.
§ 5.7.12Cesspool Vehicles & Sewerage Cleaning Vehicles
The procurement of cesspool vehicles and sewerage cleaning vehicles has been approved by the High- Powered Committee, Government Orders have been issued, and the tender process is under progress.
§ 5.7.13Information, Education and Communication & Capacity Building (IEC & CB)
For implementation of IEC & Capacity Building activities across all ULBs in the State, action plans have been prepared and approved by the State-Level Technical Committee and the High-Powered Committee. Accordingly, ULBs have prepared their respective action plans and have initiated implementation of IEC and Capacity Building activities at the ULB level.
§ 5.8Atal Mission for Rejuvenation and Urban Transformation (Amrut)-2.0
Under the AMRUT-2.0 scheme, 616 projects have been approved with a total project cost of Rs. 10258.46 crores (including O&M). An amount of Rs.3407.58 crores has been released and Rs.3227.17 crores of expenditure has been incurred since inception of the program. The scheme is being implemented in urban local bodies of the state with the aim of making cities “water secure” and providing functional water tap connections to all Households. The project components includes Water Supply, Rejuvenation of Water bodies & Development of Greenspaces & Parks.
- Water supply Projects are being implemented by the Karnataka Urban Water Supply and Sewerage Board and KUIDFC.
- Water bodies Rejuvenation and Development of green spaces and parks projects are being implemented by the urban local bodies. Contract has been awarded for 40 projects of Development of green spaces and parks (Rs. 17.77 crores) and 01 project of water body rejuvenation (Rs. 9.20 crore), while the remaining works are in the tender process.
§ 5.8.1AMRUT Mitra
740 proposals from several districts of the state and including Greater Bengaluru have been approved for Rs.56.29 crores for engaging women self-help groups in the maintenance of parks and playgrounds, water quality testing and maintenance of gardens/parks around water purification/treatment plants, wastewater management plants/pump houses in the state. Capacity building/training has been provided to 150 proposed women self-help groups in various activities.
§ 5.9Urban Transport
§ 5.9.1Directorate of Urban Land Transport
The Directorate of Urban Land Transport has implemented several initiatives including service level benchmarking in Bengaluru, preparation of policies on parking, preparation of comprehensive mobility plans for 16 cities; feasibility studies for mass transit systems (Suburban Rail Projects) etc. It is also working in tandem with BBMP and other city corporations on Non-Motorized Transport (NMT) initiatives. The Bus Rapid Transit (BRT) system between the twin cities of Hubballi and Dharwad, taken up by Directorate of Urban Land Transport has been completed and commissioned for public use. DULT is also spearheading the implementation of Suburban Rail Projects in Bengaluru through K-RIDE. To improvise Public Transport in the State, DULT has closely collaborated with state transport undertakings for the development of infrastructure like terminals, workshops, depots etc.
§ 5.9.2Bengaluru Suburban Rail Project
| Corridors | Section | Length in Kms. |
|---|---|---|
| Corridor -1 | Bengaluru-Devanahalli | 41.40 |
| Corridor -2 | Byappanahalli-Chikkabanavara | 25.01 |
| Corridor -3 | Kengeri-Bengaluru Cantonment | 35.52 |
| Corridor -4 | Heelalige-Rajanukunte | 46.24 |
| Total | 148.17 |
Bengaluru Sub-Urban Rail Project at a revised completion cost of Rs. 23,103 Crores has been taken up for implementation through a joint venture company K-RIDE. Under the project a total rail route of 148.17 kms will be constructed in four Sub-Urban Rail Corridors as detailed below; The project’s implementation will be completed in 6 years and is expected to provide affordable and sustainable transport to around 8.9 lakh commuters daily and boost transit-oriented development. Civil work for corridor–II of 25 km from Byappanahalli to Chikkabanavara has been awarded to L&T with a completion period of 27 months from Aug 2022. Civil works like casting of piers, girders, bridge construction are in progress. Civil work – elevated and at grade for Corridor-4 (Heelalige to Rajanukunte – 46.2 km) also has been awarded to L&T Company at a cost of Rs.1040.51 crores with a completion period of 30 months from Dec. 2023. Construction of 8 station out of 12 in corridor-II have been awarded to M/s NCC Ltd at a cost of Rs.501.25 crores with a completion period of 24 months and the remaining 4 station in corridor II have been awarded to M/s. ITD Cem Ltd at a cost of Rs. 525.50 Crores with a completion period of 24 months. Constructions of 9 stations in Corridor – IV have been awarded to M/s. RVNL – RPPL JV with a contract value of Rs. 554 crores and balance 9 stations to M/s. NCC with a contract value of Rs.580.75Crores. Government of India has released Rs.500 crores equity amount and the State Government has released Rs.1755.42 crores towards equity and land acquisition. Loan agreement has been signed by GoI-GoK for borrowing external loan assistance from KFW and EIB for 800 million Euro and loan agreement with KFW for 500 million Euro and EIB for 300 million Euro.
§ 5.9.3State Urban Transport Fund
The State Urban Transport Fund has been leveraged to promote DULT’s mandate across cities in Karnataka. The fund has been used to provide assistance for introduction of Public Transport System in cities of Karnataka, assistance for construction of Transit Infrastructure in cities, implementation of Non-Motorised Transport systems and development of projects/feasibility study reports etc. Over a period of 12 years from 2012 to 2024, 93 projects have been completed. The completed projects include projects such as construction of bus terminals, bus depots, tyre re-treading workshops, bus-only flyovers, introduction of public transport in the 16 cities for the first time and in 8 cities augmentation of city bus services enhancing the existing Public Transport services by the agencies (BMTC, KSRTC, NEKRTC, NWKRTC). All the completed projects have been commissioned for public use. About Rs.837.31 crores have been provided as financial assistance under SUTF over these years. There are 56 urban transport projects implemented through Road Transport Corporations for which Rs.424.67 crores financial assistance under the SUTF is made and Rs.246.94 Crores has been released. During 2025-26, an amount of Rs.102.76 crores is allocated in the Budget, of which Rs.77.07 crore has been released and Rs.69.50 crore has been Spent up to the end of December 2025.
§ 5.9.4Advance Traffic Information and Management System (ATIMS)
DULT has implemented automatic traffic control signals at 28 junctions in central areas of Bengaluru and traffic information system at several locations across the city with grant-in-aid assistance of Rs.78.00 crores. from Government of Japan. The project implementation is completed and has been commissioned for public use. Operation and Management of the ATIMS system is being carried out by DULT and Bengaluru Traffic Police.
§ 5.9.5Planning for Transit Oriented Development (TOD)
The Directorate of Urban Land Transport (DULT) and Bangalore Metro Rail Corporation Limited (BMRCL) have prepared plans for Transit Oriented Development around six upcoming metro stations along corridors 2A and 2B with Technical Assistance from Asian Development Bank (ADB). Currently, draft zonal regulations for TOD and the TOD plans for 6 station area of metro phase-2A & 2B have been prepared. The TOD plans under zonal regulations are shared with Greater Bengaluru Authority for incorporating the Master Plan have been prepared. Under this exercise, multi-modal Integration plans for the 30 stations along metro corridors 2A and 2B is also taken up. Plans for multi-modal integration for 20 other metro stations that are currently operational have been developed. In addition, DULT has also taken up preparation of TOD plans around upcoming suburban railway stations in a phased manner. Also, technical support is provided to K-RIDE to incorporate physical integration components of MMI in the station area design for 12 stations of suburban rail network.
§ 5.9.6Public Bicycle Sharing System in Bengaluru
The public bicycle sharing system in Bengaluru is a dock-less model, where multiple private bicycle sharing operators will offer their services in various parts of the city. The cycles can be located and unlocked using a mobile phone application provided by the service provider and the user will be charged based on the duration of usage. M/s YULU Bikes Pvt. Ltd., has been issued permits to operate 100 PBS and 7000 SMMS vehicles for the implementation of new Public Bicycle Sharing – Shared Micro Mobility System.
§ 5.9.7Public Bicycle Sharing System in Mysuru
With an intent to upgrade the existing PBS system and expand to larger area in Mysuru, PBS system in Mysuru is being revamped by introducing 1000 new pedal assisted bicycles spread across 100 stations. The system provides an alternative. Currently, the system is operationalized with 500 pedal assisted electric bicycles, by the successful bidder. The revamped system shall also improve the sustainability of the PBS projects.
§ 5.9.8ASPIRE 2.0
“ASPIRE” is DULT’s annual research program under Center for Research and Innovation (CERI) to identify priority research areas in urban mobility, encompassing both technological and policy-focused studies. After the successful completion of 1st edition of ASPIRE program, which funded six research projects on diverse urban mobility topics, 2nd edition of ASPIRE program was launched in 2025. DULT received 50 applications for five research statements from academic institutions, consultants and individual researchers across the country. After detailed examination of proposals with the assistance of an expert committee, 5 research entities were selected and the research study for all the topics are underway.
§ 5.9.9City Logistics Plans
The DULT has completed the preparation of City Logistic Plan for Bengaluru with focus on three sectors namely; Perishable Goods, Garments, Cement with technical assistance from GiZ. Similarly, preparation of City Logistics Plans for other cities viz. Tumkuru, Shivamogga, Mangalore, Hubballi-Dharwad, Kalaburagi, Mysuru and Davangere has been initiated.
§ 5.9.10Pedal Shale 2.0
Under this scheme DULT is implementing Cycle training to the school children of middle class. During the year 60 students from 2 selected BBMP schools are being provided training facilities on a pilot basis at a cost of Rs.1.00 lakh.
§ 5.10Bengaluru Metro Rail Corporation Limited (BMRCL)
The objective of BMRCL is to provide fast, comfortable, safe and affordable mass transportation system. In order to augment to the public transportation in Bengaluru and also to reduce the pressure of traffic, Metro Rail has come up in Bengaluru. It is a vital component of the transformation of the urban transport scenario. With urban population continuously growing, there is a need for green solutions. Mass Rapid Transit Systems are fast, safe and comfortable to travel. This alone will encourage people to switch over from personalized vehicles to public transport.
5.10.1 Bangalore Metro Rail Project Phase-2 consists of Extensions to 4 existing lines of Phase-1 and 2 New Lines. The total length of Phase-2 is 75.06 Kms with 61 stations (49 Elevated and 12 Underground). The estimated project cost is Rs. 30,695 crores. Presently, 53.80 Kms is completed and commissioned. 7.50 Kms length of elevated section in Reach-6 from Kalena Agrahara to Tavarekere is scheduled to be opened in May- 2026. 13.76 Kms Underground section in Reach-6 is scheduled to be opened in December-2026.
§ 5.10.2Bangalore Metro Rail Project Phase-2A and 2B
Phase-2A and 2B from Central Silk Board to Kempegowda International Airport is having a length of 58.19 Kms with 29 Stations. GoI has approved the project with an estimated cost of Rs. 14,788.10 Crores. The work is under progress. The Project Phase-2A having a length of 19.75 Kms is programmed to be completed by December-2026 and Phase-2B having a length of 38.44 km is programmed to complete in two stages, 27.44 Kms from Hebbal to Airport in June-2027 and 11.00 Kms from Krishnarajapura to Hebbal in December-2027.
§ 5.10.3Bangalore Metro Rail Project Phase-3
Phase-3 is having a length of 44.65 Kms with 31 Stations, comprises of J.P. Nagar 4th Phase to Kempapura (32.15 Kms with 22 Stations) and Hosahalli to Kadabagere (12.50 Kms with 9 Stations). GoI has approved the project with an estimated cost of Rs. 15,611 crores. This Phase 3 is having a Double Decker with elevated 4-lane road at level-1 & Metro at level-2. The Double Decker project with a total project cost of Rs. 9700 Crores for 37.121 Kms has been approved by the State Government. Presently, preliminary works of Land acquisition, Trees clearances, Utilities Shifting are under progress.
§ 5.10.4Proposed Project: Bangalore Metro Rail Project Phase-3A
Sarjapura has developed very fast with lot of residential layouts and industries coming around Sarjapura. To address the travel needs of this area, 36.59 Kms (22.14 Kms Elevated & 14.45 Kms UG) of Metro is being planned from Sarjapura to Hebbal along Agara, Koramangala, Dairy Circle and Mekhri Circle. DPR has been approved by GoK and submitted to GoI for approval.
§ 5.11Greater Bengaluru Authority (GBA)
The Greater Bengaluru Authority (GBA) has been established with the objective of ensuring integrated metropolitan governance, coordinated planning, and uniform service delivery across the Bengaluru metropolitan area. To effectively address the city’s rapidly growing needs related to infrastructure, mobility, environment, and service delivery, GBA provides strategic oversight, policy direction, and coordination among the five Corporations and other parastatal agencies. The five Corporations function as, the primary urban local bodies which is responsible for the implementation and operation of civic services within their respective jurisdictions. These services include roads, storm water drains, footpaths, solid waste management, public health, and local infrastructure development. GBA acts as a unified platform to ensure standardisation, efficiency, and accountability across all Corporations.
§ 5.11.1Vision and Mission of the GBA
To develop Bengaluru into a sustainable, safe, inclusive, and globally competitive metropolitan city through integrated planning, high-quality infrastructure, and governance that is responsive to citizens’ needs and his Mission is to improve the quality of infrastructure and public services, and to make city governance more efficient, transparent, and citizen-centric.
§ 5.11.2Ongoing Programmes / Schemes, Current Status
- Cabinet has approved proposed construction of vehicular tunnel corridors in two directions: a North– South corridor of 16.75 km at an estimated cost of Rs.16,980.00 crores, and East–West corridor of 23.00 km at an estimated cost of Rs.23,500.00 crores. As the first phase, the Detailed Project Report (DPR) for the 16.75 km long North–South vehicular tunnel corridor has been prepared and the project is presently under the tender process. For the second phase, preparation of the DPR for the 23.00 km long East–West vehicular tunnel corridor is under progress.
- Preparation of the Detailed Project Report (DPR) is in progress for construction of 13 elevated corridors with a total length of 126.44 km, at an estimated cost of Rs 23,500.00 crores.
- To prevent monsoon-related disasters in Bengaluru, works are being taken up with World Bank assistance at an estimated cost of Rs 2,000.00 crores for construction of 173 new major storm water drains (Raja Kaluves) and upgradation of 80 existing Raja Kaluves, including permanent protective structures. The projects are presently at various stages of the tender process.
- Under the Special Infrastructure Support Scheme, an amount of Rs 1,241.57 crores has been sanctioned for asphalting of arterial and sub-arterial roads within the jurisdiction of the Greater Bengaluru Authority (GBA), and the tender process for execution of the works is in progress at various stages.
§ 5.11.3Way Forward
- Complete and operationalise dashboard called RIMS (Road Infrastructure Management System) as a single, reliable source of information.
- Expand pedestrian-first initiatives and road safety programmes across the city.
- Strengthen coordination mechanisms among various departments and agencies.
- Increase the use of GIS, data analytics, and digital dashboards Provide continuous training and capacity building for engineering and planning staff.
§ 5.11.4Innovation, Best Practices and Success Stories
The establishment of GBA and the coordinated functioning of the Corporations represent a significant shift towards integrated metropolitan governance. Under GBA, metropolitan-level centralised planning is being implemented, along with data-driven monitoring of road works and road safety interventions. The reforms and initiatives currently being undertaken with in an aim to improve the quality of infrastructure, safety, sustainability, and service delivery. These efforts support Bengaluru’s long-term economic growth and enhance the overall liveability of the city.
§ 5.12Bengaluru Development Authority (BDA)
The Bengaluru Development Authority is a Planning Authority and also under takes major infrastructure works for development of Bengaluru City. The following are the activities of BDA:-
- Preparation of Comprehensive Development Plan (CDP) / Master plan for Bangalore city.
- Preparation of Development Plan for BDA.
- Approval of Development Plan for group housing and layout plan.
- Approval of building license plan within the jurisdiction of the Authority.
- Implementation of other statutory authority functions under Karnataka Urban and Rural Planning Act.
- Construction of PRR- project to alleviate traffic congestion and to facilitate smooth and safe public transport in the city.
- Rejuvenation of lakes to restore to its original possession and increase ground recharge.
- Construction of grade separators to make signal free roads.
In addition to planning and Zonal regulation Bangalore Development Authority also under takes construction activities like:
- Development of layout and formation of residential and commercial sites, Civic Amenity sites & Park / Open Space/Play ground
- Construction of commercial complexes for general public.
- Construction of flats/housing for the economically backward / lower income groups / middle income groups / high income groups.
- Providing basic infrastructure facilities to the public.
§ 5.12.1Housing Schemes
The Bangalore Development Authority, so far has completed the construction of 13,118 flats under 30 housing schemes across the city. Out of these, more than 10,153 flats have already been allotted to the general public. An online facility has been enabled to allow the public to choose flats of their preference. At present, the following completed units are open for public allotment:
- Hunnigere Village:
- 314 numbers of 1 BHK flats
- 215 numbers of 3 and 4 BHK villas
- Kommghatta: 1,066 numbers of 2 and 3 BHK flats
- Kaniminike: 392 numbers of 3 BHK flats
- Aluru Village: 464 numbers of 1 BHK flats
- Tippasandra Village: 68 numbers of 1 BHK flats
- Gunjuru Village: 165 numbers of 1 BHK flats
1. Dr. K. Shivarama Karanth Layout
Dr. K. Shivarama Karanth Layout is being developed in 17 villages of Bangalore North Taluk. The works include formation of sites, construction of roadside drains, laying of drinking water pipelines, underground drainage system (manholes and pipelines), LT/UT cables, feeder pillar boxes, transformers, streetlights, stormwater drains and culverts, road construction, asphalting, and bridges and it is planned to form around 40000 sites. By incurring an expenditure of Rs. 2556.83 crores, 595.79 km of roadside drains have been constructed and 33000 sites have been formed. 31032 sites have been provided with drinking water and sewerage connection, 25.83 km of major stormwater drains and 9468 manholes construction completed 159.46 km of fencing provided for parks and CA sites, GLSRs and trunk water pipelines installed, Underground drainage and STP works are in progress.
2. Nadaprabhu Kempegowda Layout
The Nadaprabhu Kempegowda Layout is being developed in 4 villages of Yeshwanthpur Hobli (Bangalore North Taluk) and 8 villages of Kengeri Hobli. A total of Rs.3,811.00 crores has been spent on the layout development works. Out of 3,969 acres notified for land acquisition, 2,963 acres 15 guntas have been handed over to the Engineering Department, 970 acres 29 guntas are yet to be fully acquired and transferred. Out of the total notified land, 2,771 acres 23 guntas are free from legal disputes and ownership claims and development works are in progress on this land, and about 30,843 sites of various dimensions (including corner and intermediate sites) have been formed. It is planned to develop 409 parks and playgrounds, 178 CA sites in the said project.
3. Arkavathi Layout
In an extent of 567 acres 04 guntas of land, total of 8,286 intermediate sites of various dimensions have been formed and allotted to the general public. Asphalting of roads is in progress. Water supply and underground drainage works are being executed by the Bangalore Water Supply and Sewerage Board and 80% of the work is completed. 90% of the electrical works is completed.
§ 5.12.2Development of Lakes
The following lakes which are under the jurisdiction of the Bangalore Development Authority have been taken up for the Development: 1. Bellandur Lake: To take up the overall development and rejuvenation of the lake, an amount of Rs.100.30 crores has been earmarked and 73% of desilting work is completed and remaining work is in progress. The Expenditure incurred up to December 2025 is Rs.118.09 crores. Additional bill has been raised for a sum of Rs.17.79 crores. 2. Varthur Lake: To take up the overall development and rejuvenation of the lake, amounting to Rs.53.81 crores. Desilting and development works is completed. Expenditure incurred so far is Rs.53.73 crores (including GST). 3. Kommaghatta Lake: In order to avoid the polluted water entering into the lake, diversion canal work has been taken up amounting to Rs.2.00 crores and the work is completed. 4. Chikkabanavara Lake: The overall developmental work of Chikkabanavara Lake was taken up amounting to Rs.15.58 crores and the work is completed.
§ 5.12.3Hebbal Flyover Works
At Hebbal junction, widening of the existing flyover from Kempegowda International Airport towards Bangalore city, approach road from K.R.Puram ramp towards Baptist Hospital, construction of two separate carriageways from Esteem Mall to Baptist Hospital is completed and made open for the public use. Construction of new flyover from KR Puram side towards Kempegowda International Airport work is to be taken up.
§ 5.12.4Underpass near Sri Kanteerava Studio
The underpass work near Sri Kanteerava Studio, which had been stalled for several years, has been resumed. Land acquisition is in progress, buildings are being demolished for road widening, service roads have been formed, and underpass construction is in progress.
§ 5.12.5New Projects Planned by the Bangalore Development Authority
1) Konadasapura Phase–1 Housing Scheme: In Konadasapura survey Nos. 20, 21, 22 & 23, Bidarahalli Hobli, Bangalore East Taluk, it is proposed to construct 480 units of 1 BHK, 1,448 units of 3 BHK, to the total of 1,928 flats by providing all the basic infrastructures at an estimated cost of Rs.713.56 crores and the work is in progress. 2) Konadasapura Phase–3 Housing Scheme: In Konadasapura survey Nos. 19 & 20, Bidarahalli Hobli, Bangalore East Taluk, it is proposed to construct 336 units of 2 BHK, 112 units of 3 BHK, 84 units of 3.5 BHK, to the total of 532 flats by providing all the basic infrastructures at an estimated cost of Rs.374.79 crores and the work is in progress. 3) Commercial Building – Konadasapura Phase–3: In Konadasapura survey no.19 and 20, Bidarahalli Hobli, Bangalore East Taluk, it is proposed to construct cinema theatre, food court, entertainment centre and other facilities at an estimated cost of Rs.42.42 crores and the work is in progress. 4) Valagerahalli Phase–7 Housing Scheme: In Valagerahalli Survey Nos. 100 & 102/1, it is proposed to take up 100 units of 2 BHK, 100 units of 2.5 BHK to the total of 200 flats at an estimated cost of Rs.88.60 crores and the work is in progress. 5) Kalathammanahalli Housing Scheme: In Kalathammanahalli village of Surey No.8/2, Hesarghatta hobli, Bangalore North taluk, and Byalkere village Surey No.46, 47/1, 47/2, 47/3, 47/4 and 48 located in Dr.K. Shivarama Karanth Layout, it is proposed to construct 264 units of 3 BHK, 132 units of 4 BHK a total of 396 flats and the work is taken up at an estimated cost of Rs.552.90 crores and the work is in progress. 6) Kenchanapura Housing Scheme: In Kenchanapura village Surey No.73, 76 and 2 located in Nadaprabhu Kempegowda Layout, it is proposed to construct 210 units of 2 BHK, 153 units of 3 BHK a total of 363 flats at an estimated cost of Rs.328.00 crores and the work is in progress. 7) Doddathoguru Housing Scheme: In Doddathoguru village Surey No.104, Electronic city, Bangalore south taluk, it is proposed to construct 416 units of 3 BHK, 416 units of 4 BHK total of 832 flats at an estimated cost of Rs. 1,119.41 crores. The work is in progress.
§ 5.12.6Bangalore Business Corridor – Part 1 (PRR)
Due to extreme congestion of population and vehicles in the central areas of the city, the Bangalore Development Authority (BDA) had planned the Outer Ring Road (ORR) project with the objective of easing traffic movement within the city. The proposed Peripheral Ring Road (PRR) road will start from Tumakuru Road and connect Ballary Road, Old Madras Road, Sarjapur Road, and Hosur Road. It is planned to construct a road of approximately 73.04 km in length, providing connectivity to the already constructed NICE Road. To promote commercial activities, it is proposed to develop plots for commercial purposes on one side of the road. For this purpose, about 2,565 acres of land will be acquired. The Peripheral Ring Road will connect five major National Highways, enabling city residents to travel quickly from one direction to another by bypassing city congestion through the outer periphery. It will also facilitate smooth and convenient access to the international airport. In this context, even though the project has been delayed, it is essential to take it up on a priority basis. The estimated cost for land acquisition for this project is Rs.21,000 crores, and the construction cost is estimated at Rs.6,000 crores, bringing the total project cost to Rs.27,000 crores. To implement the project, it has been decided to obtain the required Rs.27,000 crores as a loan from HUDCO, for which the State Government will provide a guarantee.
§ 5.12.7Bangalore Business Corridor – Part 2 (PRR)
Peripheral Ring Road – Phase 2 has been planned as a 6-lane road with a width of 100 meters and a total length of 52.38 km. It will start from Hosur Road and provide connectivity to Bannerghatta Road, Kanakapura Road, Mysuru Road, Magadi Road, and Tumakuru Road. Out of this, a 10.77 km stretch connecting Mysuru Road and Magadi Road has already been taken up under the Nadaprabhu Kempegowda Layout Development Project. The preparation of the Detailed Project Report (DPR) for the remaining 41.61 km is currently in progress.
§ 5.12.8Proposed New Layouts
1) Nadaprabhu Kempegowda Layout further extension: To ensure continuity of infrastructure in the Nadaprabhu Kempegowda Layout, it is proposed to form an extended Nadaprabhu Kempegowda Layout by including the surrounding 21 villages and the remaining lands located between them. 2) Dr. K. Shivarama Karanth Layout further extension: To ensure continuity of infrastructure in the Dr. K. Shivarama Karanth Layout, it is proposed to form an extended Dr. K. Shivarama Karanth Layout by including the surrounding 11 villages, along with the villages adjacent to PRR-1 (BBC-01) and the neighboring lands. 3) Bangalore Business Corridor (BBC) -01 (PRR): In view of the rapid urban growth along the corridor, it is proposed to develop 5 new layouts. 4) Bangalore Business Corridor (BBC)-02 (PRR): In view of the rapid urban growth along the corridor, it is proposed to develop 6 new layouts.
§ 5.13Urban Development Authorities and Town and Country Planning Commission
§ 5.13.1Vision and Mission
- Vision: To promote balanced regional development across the state, ensure sustainable urbanization and provide better quality of life to citizens.
- Objective: To prepare and implement Master Plans of cities/towns under the Karnataka Town and Country Planning Act, 1961.
- Providing advice and technical assistance to Local Planning Authorities and Government Departments on matters relating to planning, development and utilization of rural and urban land.
- Preparation of town expansion plans, development/improvement plans, rehabilitation plans etc. for project implementation.
§ 5.13.2Projects and Activities
- Preparation and Implementation of Master Plans: Preparation of Master Plans for various cities and towns (eg: through Divisional Offices in Belagavi, Kalaburagi, Mysore).
- Change of Land Use: Receiving applications from land owners who wish to develop land for a different zone/purpose other than the zones identified in the approved master plan and granting permission as per rules.
- Approval of design plans: Approving design plans of private land owners, institutions and government agencies.
- Training Programmes: Providing training to newly recruited officers and staff (eg on AMRUT scheme etc.).
§ 5.14Municipal Finance and Ulbs in Karnataka
§ 5.14.1Directorate of Municipal Administration (DMA)
The Directorate of Municipal Administration act as a nodal agency to control and monitor administrative, developmental and financial activities of the urban local bodies and act as an interface in compilation and dissemination of information from local bodies to Government. In accordance with the powers conferred upon by the Karnataka municipalities Act, 1964, the Directorate of Municipal Administration oversees the administration of 13 City Corporations, 64 City Municipal Councils (CMCs), 120 Town Municipal Councils (TMCs), 120 Town Panchayats (TPs) and 04 Notified Area Committees. The DMA monitors these urban local bodies through a network of District Urban Development cells (DUDCs) headed by a Project Director which reports to the Deputy Commissioner of the said district. The Directorate is responsible for ensuring that the urban local bodies deliver the obligatory functions such as lighting of street, providing water and cleaning of public places and also discretionary and special functions.
§ 5.14.2Role & Responsibilities
- Nodal Agency for regulating day to day governance of 317 ULBs including Corporations in the State (except BBMP).
- Supervising administration in Corporations & ULBs as mandated in Corporations Act, Municipal Acts and its interpretation.
- Facilitating implementation and monitoring of schemes of State and Central Government.
- Formulating recruitment and service rules for corporations, municipal employees and officers.
- Regulating service delivery in Corporations & ULBs.
- The Directorate of Municipal Administration is the Nodal Agency to monitor the Administrative, Developmental and Financial Activities of the Corporations & ULBs coming under its jurisdiction.
§ 5.14.3Chief Minister Amrutha Nagarothana (Municipality) Phase-4
The Chief Minister’s Amrutha Nagarothana (Municipality) Phase-4 scheme is being implemented in 302 Urban Local Bodies with a total allocation of Rs.3,885.00 crores. Under this scheme, priority has been given to basic infrastructure works such as road improvement, roadside drains, footpaths and traffic management, drinking water supply, storm water drains, construction and improvement of office buildings, community and public toilets, and development of modern bus stands and market complexes. Budgetary amount of Rs. 500.00 crores allocated for the year 2025-26. An expenditure of Rs.590.40 crores has been incurred including opening balance Rs.208.27 crores against the released amount of Rs.500.00 crores up to the end of December 2025.
§ 5.14.415th Finance Commission Grants
During the Current year an amount of Rs.887.00 crores has been allocated under 15th Finance Commission Grants for the implementation of approved works in all the ULB’s.
§ 5.14.5State Finance Commission United (Other Devolution)
Under S.F.C. untied Scheme, provision has been made for development of basic infrastructure projects, such as drinking water projects, vegetable, meat, poultry and fish market, construction of public toilets, cemetery development, construction of internal roads and drains in the urban local bodies of the state. As per the SFC untied guidelines under the sub components various welfare schemes are undertaken, 24.10% amount is reserved for SC/ST welfare, 7.25% amount is reserved for Other urban poor welfare and 5% amount is reserved for disabled welfare in which, Individual and Community development programs are implementing in Urban Local bodies. During the current year an amount of Rs.137.57 crores has been allocated under State Finance Commission Grants, of which Rs. 52.01 crores has been released and Rs. 20.13 crores expenditure has been incurred for 1377 completed works against the approved works of 4069. The other works are under different stages of implementation.
§ 5.14.6SFC Drinking Water
Under S.F.C. drinking water scheme, works like deepening/cleaning of tube wells, Hydro factoring, repair/ replacement of water supply pipes, drilling of new tube wells and installation of pump motor, drinking water supply etc. are undertaken. During the current year an amount of Rs.20.00 crores has been allocated under State Finance Commission Grants (Drinking Water), of which Rs. 10.00 crores has been released and Rs. 5.78 crores expenditure has been incurred for 232 completed works against the approved works of 503. The other works are under different stages of implementation.
§ 5.14.7SFC Special Grants
Government allocates SFC Special grants as per discretion of Honorable Chief Minister to undertake various development works in Urban Local Bodies. An amount of Rs.150.00 crores has been allocated during 2025-26 under State Finance Commission Grants (Special Grants), of which Rs. 150.00 crores has been released and the same has been fully utilized by completing 162 works upto the end of December 2025 against the approved works of 962. The other works are under different stages of implementation.
§ 5.15Pourakarmika Gruha Bhagya Yojane
Pourakarmika Gruha Bhagya Yojana is a priority housing scheme for providing housing facility to the permanent eligible Pourakarmikas, Loaders, UGD Helpers, Cleaners and sanitary supervisors who work in unhygienic and hazardous environment in the Urban local bodies of the state. During the current year an amount of Rs.10.00 crores has been allocated, of which Rs. 5.00 crores has been released and the same has been fully utilized upto the end of December 2025. 5389 houses have been completed since inspection of the scheme against 6119 total approved beneficiaries under this scheme.
§ 5.16Indira Canteens Scheme
With an objective to provide sufficient quantity of balanced diet for urban poor people living in cities, who are deprived of socio-economic status, Government has started 173 Indira Canteens in District and Taluka headquarter of Urban Local Bodies and the start of the remaining 13 canteens are in progress across the state.
§ 5.17Urban Housing
Housing is a basic and very important need for every citizen. Housing not only provides social security to human beings but it also provides status in the society. Housing is one of the important and most basic needs of the people. Housing has evolved as a prime component over the period of time not only in providing shelter but also for providing employment opportunities and in development of localities. To meet the growing demand for housing, the State Government has been pro-active in its housing policies. Housing for the poor and down-trodden assumes greater importance both in Rural and Urban areas in the State. Every successive Government has given greater attention to the problem of housing scarcity and increased the budgetary allocation year after year. Karnataka Housing Board (KHB) caters to housing needs of low income, middle income and high-income groups. The Karnataka Slum Development Board (KSDB) is responsible for improvement of slums and resettlement of slum dwellers.
§ 5.17.1Rajiv Gandhi Housing Corporation Limited
With an objective to implement all the State and Central Government sponsored housing schemes for economically and socially weaker sections of the Society both in rural and urban areas. Rajiv Gandhi Housing Corporation Limited has been established. The main objectives are:
- To provide houses to the Socially and Economically Weaker sections of the society.
- Speedy implementation of schemes.
- Transparency in implementation.
- Smooth flow of funds to ensure that the funds reach the ultimate beneficiaries in time.
- To encourage cost effective technology in construction through District Nirmithi Kendras.
- Strengthening of Nirmithi Kendras.
Karnataka Government is implementing many schemes like “Vajpayee Urban Housing Scheme”, Dr.B.R. Ambedkar Nivasa Yojane, Pradhan Mantri Awas Yojana- Housing for All (PMAY –U), Devraj Urs Housing Scheme etc,. to caters to need of urban poor and distribution of sites to site less persons through Vajpayee Urban Site Scheme in urban areas for EWS site-less families in the state. These schemes are implemented through Rajiv Gandhi Housing Corporation Limited. Totally 52,45,881 houses have been constructed under various housing schemes and 2,52,528 sites have been distributed from 2000-01 to 2025-26 up to end of December-2025.
§ 5.17.2Dr.B.R. Ambedkar Nivasa Yojane
The main objective of this scheme is to provide housing facility to the houseless families of Schedule Caste and Schedule Tribes. The scheme is being implemented in both Rural and Urban areas. Under this scheme Rs.2.00 lakh subsidy is being provided in rural and urban areas. The income limit of the beneficiary is Rs. 1,20,000/- in Rural and Rs.2,00,000/-in urban areas. During last 3 years 94,652 houses have been completed as against the target of 1,20,000 houses in Rural area and 10,199 houses have been completed as against the target of 15,000 houses in Urban area. For the year 2025-26 as against the target of 16,500, 9,705 houses in Rural & 730 houses in Urban have been completed at the end of December-2025 and remaining houses are under progress. District-wise details of the houses constructed are provided in the Appendix 5.1.
§ 5.17.3Pradhan Mantri Awas Yojana- Housing for All (PMAY –U)
Under PMAY-HFA, a family can avail housing under any of the following verticals under this mission: 1. In-situ Slum Redevelopment using land as Resource 2. Credit-Linked Subsidy Scheme 3. Affordable Housing in Partnership (AHP) 4. Beneficiary-led individual house construction or enhancement All ULBs would be covered under this Mission. It is proposed to dovetail existing housing schemes of GoK with HFA. The economic parameter of family is defined by GoK is as follows:
- BPL Household - up to Rs. 87,600/-
- EWS Household - Rs. 87,600/- to 3,00,000/-
Under the Pradhan Mantri Awas Yojana, approval has been accorded for the construction of a total of 4,44,744 houses in various cities at an estimated cost of Rs.27,087 crore. Of this, the Central Government’s share amounts to Rs.6,671 crores, the State Government’s contribution is Rs.6,246 crores, the beneficiaries’ contribution is Rs.11,981 crores, and the share of Urban Local Bodies is Rs.2,188.65 crores. As against the 4,44,744 target 2,60,163 houses have been completed and 1,10,920 houses are under various stages of construction and an amount of Rs. 9098.98 (GoI Rs. 4859.95 + GoK, Rs. 4239.03) crores has been spent up to the end of December-2025.
§ 5.17.4Vajpayee Urban Housing Scheme
Vajpayee Urban Housing Scheme is implemented to provide housing facilities to the economically and socially backward homeless people in urban areas. The annual income limit of the beneficiaries under this scheme is fixed at Rs. 2,00,000/-. The selection of beneficiaries will be done through the Urban Local Bodies from the list of Houseless List. The Government is providing subsidy amount of Rs. 1.20 lakhs per house. During the last three financial years, total of 20,090 houses have been constructed as against the total target of 25,000 houses. A target of 2,500 houses has been given for the year 2025-26, against which 1,315 houses have been constructed till the end of December 2025. The details of the houses constructed district-wise are given in the Annexure 5.2.
§ 5.17.5Devaraj Urs Housing Scheme
This scheme is introduced with an objective to provide houses to special category i.e. People living on footpath/living in public places, physically handicapped, leprosy cured, HIV affected, Transgender, Sex workers, Devadasis, Widows, Freed bonded labourers, Scavengers, Exploited- including “women/girls who have been subjected to acid attacks”, People affected in communal riots & during strikes, Nomadic Tribes, Special occupation groups. The selection of beneficiaries is done by the District Committee headed by the Deputy Commissioner. Under this scheme the unit cost per house is Rs.1.20lakhs for General category and Rs.1.50 lakhs for SC/ST beneficiaries. During the last three years, 24,495 houses have been constructed in rural areas against the target of 25,520 houses and 1,387 houses in urban areas against the target of 3,480 houses. For the year 2025-26, a target of 4,000 houses has been given in rural areas, against which 1,995 houses have been constructed and 38 houses have been constructed against the target of 100 houses in urban areas by the end of December 2025. The district-wise break-up is given in the Appendix 5.3.
§ 5.17.6Infrastructure facility
The Government is providing up to Rs.40.00 lakhs per acre for providing basic amenities like Drainage, Road, Drinking Water, Electricity etc., for newly developed layouts. During current year, Rs.61.28 crores have been spent up to the end of December-2025.
§ 5.17.7House Site
The Government is implementing the Rural House Site Scheme in rural areas and Vajpayee Urban Site Scheme in urban areas for EWS site-less families in the state. In rural areas 30 X 40 and in urban areas 20X 30 sites are provided at free of cost. In rural areas beneficiaries are selected through gram sabha and in urban areas through Ashraya committee. From 2004-05 to 2024-25, a total 2,48,373 sites have been distributed (1,37,179 sites in rural areas, 1,11,194 sites in urban areas). For the year 2025-26, it is targeted to distribute 10,000 sites, 3,570 sites in rural areas and 585 sites in urban areas totaling 4155 sites have been distributed up to the end of December-2025.
§ 5.17.8“1 Lakh Multi Storey Bengaluru Housing Programme”
The “1 Lakh Multi Storey Bengaluru Housing Programme” has been formulated based on a Self-Sustaining model for construction of “1 Lakh multi-Storey Houses” in and around Bengaluru for the EWS and other eligible poor on the Government land provided by Revenue Department by mobilizing the funds under State Schemes viz., Dr. Ambedkar Nivas Yojana and Vajpayee Urban Housing etc., in convergence with the “Pradhan Manthri Awas Yojana (Urban) -Housing for all (HFA)” scheme of the Government of India along with beneficiary contribution and cross-subsidy by leveraging suitable Government lands wherever possible under PPP model.
§ 5.17.9Highlights of Housing Schemes
The Government sponsored Economically Weaker Section (EWS) housing schemes helps the society directly and also indirectly.
- EWS housing improves the quality of living standards of poor beneficiary.
- Under various Government Sponsored EWS housing Schemes Rs.2273 lakhs direct and Rs.1136 lakhs indirect employments have been generated so far.
- This reduces the housing stock in the country in massive scale.
- Indirectly it is one of the basis for country’s economic development.
§ 5.17.10Challenges
- The Govt. of Karnataka has fixed Unit cost of Rs.2.00 Lakhs in Rural & Urban areas for SC/ST beneficiaries. While compare to General/Minority beneficiaries unit cost of Rs.1.20 Lakhs is been fixed. There is a requirement of enhancement of unit cost of all beneficiaries.
- In case of distribution of site to site less families, due to drastic increase in the land cost and nonavailability of Government lands in both rural and urban areas, a lot needs to done as compared to the total demand.
- There is no proportionate increase in subsidy as compared to increase in construction cost.
§ 5.17.11New initiatives
- Establishment of “Spandana” – Call Center.
- Developed the new website to ensure the transparency in the implementation and beneficiary-wise information made available to the public in the Company’s website http://ashraya.karnataka.gov.in.
- Letters and Files are maintained in E-office.
- Usage of ‘Vasathi Vigil’ mobile app used under Housing Schemes.
- According to GPS based physical progress the fund will be released through Aadhar based account.
- Aadhar linking, Ration card & caste and Income certificate are made mandatory to avoid bogus/ duplication.
- The documents of various department are verified through web service.
- The beneficiary list is approved through online using Digital Signature.
- The SMS is sent to the Implementing Officers and beneficiaries at every stage i.e. after approval of the list, Opening of bank account, release of funds etc.
- Using Fast Tract Technology in Housing Projects.
- Under CM One Lakh Housing Scheme, online applications are received.
§ 5.18The Karnataka Slum Development Board
The Karnataka Slum Development Board was constituted in July 1975 as per Karnataka Slum Areas (Improvement and Clearance) Act, 1973 for the welfare and development of slums. This was re-designated as Karnataka Slum Development Board during 2010. The main objective of the Board is to provide basic amenities to the slum dwellers and to provide shelter to the needy beneficiaries in the slums. As per the survey conducted by Board, there are 3025 slum areas in state as at the end December 2025, of which 435 slum areas are in Bengaluru City only. Totally 2866 slums are notified in the State under the Karnataka Slum Areas (Improvement and Clearance) Act 1973 and 159 are non-notified slums.
§ 5.18.1Slum Improvement Scheme
Action Plans for basic infrastructure works such as roads, drains, sewerage, drinking water, street lights, community toilets, and community halls are prepared and executed by getting approval from the Competent Authority under Slum Improvement Scheme.
§ 5.18.2Housing Scheme
The Karnataka Slum Development Board has received approval for the construction of 1,80,253 Affordable Housing in Partnership (AHP) houses across various urban/town limits of the state. This is being implemented by converging State Government Housing Schemes (Dr. Ambedkar Niwas Yojana and Vajpayee Urban Housing Scheme) with the Centrally Sponsored Pradhan Mantri Awas Yojana (PMAY).
| Sl. No. | District | Constructed Houses | |
|---|---|---|---|
| Urban | Rural | ||
| 1 | Bagalkot | 88 | 267 |
| 2 | Ballari | 57 | 34 |
| 3 | Belagavi | 58 | 510 |
| 4 | Bengaluru Rural | 10 | 158 |
| 5 | Bengaluru South | 4 | 634 |
| 6 | Bengaluru Urban | 10 | 40 |
| 7 | Bidar | 11 | 197 |
| 8 | Chamarajanagar | 13 | 616 |
| 9 | Chikkaballapur | 11 | 182 |
| 10 | Chikkamagaluru | 10 | 90 |
| 11 | Chitradurga | 11 | 430 |
| 12 | Dakshina Kannada | 13 | 77 |
| 13 | Davanagere | 12 | 259 |
| 14 | Dharwada | 3 | 55 |
| 15 | Gadaga | 4 | 157 |
| 16 | Hassana | 6 | 209 |
| 17 | Haveri | 4 | 169 |
| 18 | Kalaburagi | 14 | 369 |
| 19 | Kodagu | 6 | 80 |
| 20 | Kolara | 15 | 224 |
| 21 | Koppala | 21 | 519 |
| 22 | Mandya | 7 | 143 |
| 23 | Mysuru | 26 | 1240 |
| 24 | Raichuru | 40 | 451 |
| 25 | Shivamogga | 19 | 173 |
| 26 | Tumakuru | 7 | 426 |
| 27 | Udupi | 17 | 77 |
| 28 | Utat raKannada | 8 | 150 |
| 29 | Vijayanagara | 18 | 404 |
| 30 | Vijayapura | 91 | 722 |
| 31 | Yadgiri | 116 | 643 |
| Total | 730 | 9705 |
| Sl. No. | District | EMPIC Target | Achievement |
|---|---|---|---|
| 1 | Bagalkot | 438 | 214 |
| 2 | Ballari | 45 | 34 |
| 3 | Belagavi | 242 | 144 |
| 4 | Bengaluru Rural | 19 | 9 |
| 5 | Bengaluru South | 18 | 7 |
| 6 | Bengaluru Urban | 5 | 16 |
| 7 | Bidar | 73 | 11 |
| 8 | Chamarajanagar | 20 | 21 |
| 9 | Chikkaballapur | 30 | 16 |
| 10 | Chikkamagaluru | 10 | 8 |
| 11 | Chitradurga | 24 | 17 |
| 12 | Dakshina Kannada | 32 | 34 |
| 13 | Davanagere | 42 | 43 |
| 14 | Dharwada | 59 | 7 |
| 15 | Gadaga | 64 | 23 |
| 16 | Hassana | 28 | 8 |
| 17 | Haveri | 74 | 29 |
| 18 | Kalaburagi | 93 | 16 |
| 19 | Kodagu | 12 | 7 |
| 20 | Kolara | 56 | 13 |
| 21 | Koppala | 47 | 27 |
| 22 | Mandya | 20 | 23 |
| 23 | Mysuru | 98 | 47 |
| 24 | Raichuru | 88 | 59 |
| 25 | Shivamogga | 49 | 39 |
| 26 | Tumakuru | 51 | 29 |
| 27 | Udupi | 14 | 16 |
| 28 | Utat ra Kannada | 70 | 58 |
| 29 | Vijayanagara | 45 | 22 |
| 30 | Vijayapura | 442 | 186 |
| 31 | Yadgiri | 192 | 132 |
| Total | 2500 | 1315 |