7.1.1 Tamil Nadu has been experiencing rapid urbanization. Urbanization presents a structural challenge for infrastructure provision in so far as the rapid concentration of population and economic activity tends to exceed the absorptive capacity of existing planning and financing systems.

7.1.2 The expansion of urban economies generates simultaneous demand for transport networks, housing, water and sanitation systems, energy supply, and digital connectivity, requiring coordinated, capital-intensive investments. However, fiscal constraints and market rigidities impede timely infrastructure delivery. The problem is compounded by uncertainty surrounding migration flows and environmental risk, which complicates demand forecasting and investment prioritisation.

7.1.3 Infrastructure remains a core driver of Tamil Nadu’s economic growth, supporting productivity, mobility, urbanisation, and service delivery. The State continues to prioritise capital investment to strengthen sectoral infrastructure. Capital expenditure for 2025- 26 is projected at Rs. 57,231 crore, a 22.4% increase over 2024-25, covering transport, energy, roads and bridges, urban development, water supply, water bodies, and social infrastructure.

7.1.4 With expanding infrastructure networks, the focus is shifting from individual assets to integrated systems. Rapid urban growth, rising mobility demand, climate-risks, and service expectations require resilient, efficient, and adaptive infrastructure. Digital tools, data systems, and coordinated planning are increasingly critical for design, implementation, and maintenance.

This chapter reviews 2025-26 infrastructure performance, highlighting capital expenditure, key initiatives, and implementation progress.

§ 7.1.aI. Urban Infrastructure

§ 7.2Industrial & Economic Corridors

7.2.1 Tamil Nadu is the only State in India with all its districts covered under industrial corridor projects. Tamil Nadu Industrial Development Corporation Ltd. (TIDCO) is the nodal agency for the development of the Chennai–Bengaluru Industrial Corridor, Chennai–Kanyakumari Industrial Corridor, Kochi–Coimbatore–Bengaluru Industrial Corridor and the Defence Industrial Corridor in the State. As the designated nodal agency, TIDCO coordinates industrial and infrastructure development activities across these corridors with various Government agencies.

§ 7.3Road Based Public Transport

7.3.1 Tamil Nadu prioritises transport infrastructure for economic development and social inclusion, emphasising sustainability, affordability and institutional coordination to build a future ready transport ecosystem.

7.3.2 State Transport Undertakings (STUs) provide road-based public transport within Tamil Nadu and to neighbouring states. In Chennai, services are operated by the Metropolitan Transport Corporation (MTC), while six regional transport corporations manage inter district and municipal services. SETC (State Express Transport Corporation) is a specialized corporation within the Tamil Nadu STU system that exclusively focuses on long-distance, inter-city, and interstate travel (typically routes over 300 km).

7.3.3 Modernisation and greening of the public transport fleet are ongoing priorities. As of January 2026, MTC has put 780 new buses on road. MTC operates 255 electric buses. By February 2026, the target is 625 electric buses across five depots, featuring cameras, panic buttons, and USB charging. MTC plans to strengthen first and last mile connectivity to Metro stations, operating small buses on 25+ routes. Feeder services have been expanded via the mini-bus scheme, covering approximately 2,000 routes. Digital payment facilities were introduced across multiple districts in 2025-26, enabling cashless ticketing and improving commuter convenience.7.3.4 In November 2025, MTC launched the “Bus First” campaign to promote bus travel in Chennai, aiming to reduce congestion and pollution. The campaign includes a mobile bus exhibition across the city.

7.3.4 In November 2025, MTC launched the “Bus First” campaign to promote bus travel in Chennai, aiming to reduce congestion and pollution. The campaign includes a mobile bus exhibition across the city.

7.3.5 As part of its modernisation programme, the Metropolitan Transport Corporation has computerised bus scheduling at depots, enabled real-time data relay through the mobile application, and created commuter-facing infrastructure by installing digital display boards at key bus stops to provide real-time arrival and departure information. In parallel, GPS devices have been installed in phases across the entire fleet following the implementation of intelligent transport software. The commissioning of a modern Command and Control Centre has enabled commuters to track buses in real time through the Chennai Bus mobile application.

7.3.6 The World Bank report Chennai’s Urban Mobility Transformation commends MTC for operational and service delivery reforms. Under the Chennai City Partnership, MTC aims for financial sustainability by improving fleet utilisation to 87%, deploying 1,000 electric buses under the GCC model, and modernising 3,833 buses with enhanced multimodal integration.

§ 7.4Expressways

7.4.1 The 10.1 km G.D. Naidu flyover in Coimbatore was inaugurated in October 2025. The flyover was constructed over a period of five years at a cost of ₹1,791.23 crore. The project comprises a four-lane main carriageway and a six-lane expanded road at ground level, along with eight up and down ramps located at four points. Being the longest flyover in South India, the structure incorporates features such as sinus plate expansion joints, rainwater harvesting systems in every span to enhance groundwater recharge, drip irrigation on the flyover, sprinkler irrigation at ground level, and energy efficient lighting.

7.4.2 Chennai - Bengaluru expressway project is expected to be completed this year.

7.4.3 The Central Government has approved a realignment of the Chennai–Surat Expressway under the Bharatmala Pariyojana, reducing its planned length from about 1,271 km to nearly 900 km, with the corridor now proposed to end at Nashik rather than Surat. This modification has been attributed to land acquisition constraints and delays in securing environmental clearances in the Nashik–Surat stretch. Notwithstanding the shorter alignment, the six-lane, access-controlled expressway continues to be envisaged as a key corridor for enhancing high-speed connectivity between southern and central India.

7.4.4 The Chittoor–Thatchur Expressway (NH-716B) is a 116.1 km, six-lane access-controlled greenfield corridor linking Chittoor in Andhra Pradesh with Thatchur in Tamil Nadu and connecting to the Chennai Peripheral Ring Road. Developed at a cost of ₹3,998 crore under Bharatmala Pariyojana Phase I, the project is intended to provide direct, congestion-free access to the Kamarajar and Kattupalli ports. As of early 2026, around 80% of construction has been completed, with most stretches nearing readiness for traffic. The expressway is expected to be fully operational by December 2026, with select sections likely to open earlier.

7.4.5 The Tamil Nadu State Highways Authority has proposed a 14.2 km four lane elevated corridor between Thiruvanmiyur and Uthandi along the East Coast Road at an estimated cost of ₹2,100 crore. International tenders have been floated for the toll-based corridor, which is designed to cover 13 major congested junctions and reduce travel time on the stretch from about one hour to 15 to 20 minutes, while also providing an alternate route to ease traffic pressure on the OMR.

7.4.6 The double-decker elevated corridor between Maduravoyal and Chennai Port is under construction and is expected to be completed in the first half of 2027. The project aims to ease traffic congestion along a key urban freight and commuter corridor in Chennai.

§ 7.5Electric Vehicle Infrastructure

7.5.1 Tamil Nadu is India’s fastest-growing EV manufacturing hub. Global players such as Ola Electric, Ather Energy, BYD, TVS, Vinfast, Ampere, and several battery companies have set up factories in the state.

7.5.2 According to India Electric Mobility Index (IEMI) by Niti Aayog, Tamil Nadu ranks second in EV Research and Innovation Status while ranking 12th in Charging Infrastructure and readiness and 14th in Tranport Electrification Progress.

7.5.3 Tamil Nadu has revised its Electric Vehicle Subsidy Policy this year, bringing major updates. The policy provides subsidies of up to ₹10,000 for electric scooters and ₹20,000 for highperformance electric motorcycles, along with road tax and registration fee exemptions for electric cars, special incentives for women, students, and delivery workers, a fiveyear interest subsidy on commercial EV loans, and additional support for fleet operators such as taxis and logistics services. In 2024-25 Tamil Nadu ranked fourth in number of electronic vehicles registrations with 61,344 vehicle registrations, next only to Maharashtra (1,45,576), Uttar Pradesh (1,02,197) and Karnataka (85,765) .

Figure 7.1Electric Vehicle Registrations in 2024-25
Number of electric vehicles
040,00080,0001,20,0001,60,000
MaharashtraUttar PradeshKarnatakaTamil NaduMadhya PradeshRajasthanKeralamGujaratOdishaBiharChhattisgarhAndhra PradeshPunjabWest BengalHaryanaJharkhandUttarakhand
The numbers
Electric vehicles registered, 2024-25
Maharashtra1,45,576
Uttar Pradesh1,02,197
Karnataka85,765
Tamil Nadu61,344
Madhya Pradesh58,518
Rajasthan51,166
Keralam40,977
Gujarat37,678
Odisha31,571
Bihar23,727
Chhattisgarh23,580
Andhra Pradesh23,302
Punjab19,675
West Bengal18,584
Haryana16,115
Jharkhand7,929
Uttarakhand6,199

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Source: Parivahan Portal · Survey, p. 156

7.5.4 Greater Chennai Corporation has launched a major initiative to promote clean mobility by installing electric vehicle (EV) charging stations in prominent public spaces. Implemented in partnership with Tamil Nadu Green Energy Corporation Limited and Relux Electric Private Limited, the first phase will establish 9 stations in high-footfall areas, each accommodating 2 cars and 3 two-wheelers simultaneously, with fast charging facilities for four wheelers. This marks the start of a broader State plan to deploy 500 EV charging stations across Tamil Nadu, prioritising accessible public locations to encourage widespread EV adoption.

§ 7.6Vehicle Registrations

7.6.1 According to Vahan Portal, till 2025, Tamil Nadu recorded 3.51 crore new vehicle registrations, underscoring strong demand from rising incomes, urbanisation, and increased goods movement. The State also processed 1.01 crore service transactions during the year. Revenue collection reached Rs. 10,679 crore in 2025, highlighting the transport sector’s significant fiscal contribution. Registrations, transactions, permits and revenue were concentrated in major hubs such as Chennai (West, South and Central), Tambaram, Poonamallee, Coimbatore (North and South) and Salem, driven by industrial activity and high population density.

§ 7.7Railways and Metrorail

7.7.1 Tamil Nadu’s railway sector is expanding rapidly, driven by rising passenger demand, investment in new lines and doubling projects, improved suburban connectivity, and modern logistics services. The Southern Railway zone, headquartered in Chennai, oversees extensive operations with nearly 1,000 trains running daily from Chennai, including over 170 passenger services.

7.7.2 Southern Railway carried 57.9 crore originating passengers during 2025-26, registering a 6.2% increase over the previous year, while maintaining 92% punctuality. During the year, 3,570 special train trips were operated in addition to regular services. The Southern Railway revenue had a steady growth during 2025-26 (9 months up to December), with gross earnings of Rs. 9,846 crore, an increase of 7.5% over the corresponding period of the previous year.

7.7.3 Chennai Division spans 699 kms with 157 stations (117 km and 15 stations in AP). Freight handled is about 14.868 million tons annually. The division operates 837 trains daily, including EMUs, serving 1.2 million passengers, with 213 suburban trains catering to commuters. The Chennai Division has launched a dedicated Parcel Cargo Express Train connecting Royapuram and Patel Nagar (Delhi) under a six-year contract with Rail Transport Corporation of India. Initially planned for two round trips per month, the service now operated twice weekly (Wednesdays and Sundays), covering 2,195 km carrying auto components, leather goods, handloom products, tyres and courier consignments.

7.7.4 Southern Railway has also launched a first of its kind coast to coast parcel express service linking Tamil Nadu and Kerala. Operating Royapuram and Mangaluru Central, it uses ten highcapacity parcel vans and two luggage-cum brake vans to transport white goods, perishables, consumer products, and industrial materials. The service offers faster, costeffective and eco-friendly alternatives to road logistics.

§ 7.8Chennai Metro Rail Phase II

7.8.1 Chennai Metro Rail Phase II is India’s largest ongoing metro rail project, spanning 118.9 km at an estimated cost of Rs. 63,246 crore. It comprises three corridors: Madhavaram-SIPCOT (45.8 km), Lighthouse-Poonamallee Bypass (26.1 km), and Madhavaram-Sholinganallur (47 km), with a total of 128 stations.

7.8.2 Metro usage continue to grow, with 93.27 lakh passengers in October 2025 and 9.32 crore passengers in the financial year up to October. As on February 01, 2026, stationwise passenger flow on Metro Line 02 shows a clear concentration of ridership at major interchange and terminal stations, with Chennai Airport recording the highest passenger volume.

7.8.3 Chennai Metro Rail Limited is revising the commissioning plan for Corridor 5 under Phase II following the completion of trial runs on the Vadapalani to Poonamallee depot section, which is proposed to enter commercial service by February. Corridor 5, also known as the Red Line, is a 47 km corridor connecting Madhavaram and Sholinganallur.

§ 7.9Merger of MRTS with Chennai Metro Rail Limited

7.9.1 In 2025, a major institutional reform was approved with the transfer and merger of the Chennai Mass Rapid Transit System (MRTS) with Chennai Metro Rail Limited (CMRL). The MRTS operates 20 km corridor from Chennai Beach to Velachery, along with a 5 km extension to St. Thomas Mount, carrying about one lakh passengers daily. The transfer covers all MRTS assets, including tracks, bridges, signaling and electrification systems, land and buildings. State-funded assets are being transferred directly to the Government of Tamil Nadu and CMRL, while Southern Railway land will be leased to the State.

§ 7.10Civil Aviation

7.10.1 Tamil Nadu’s airport network is relatively well distributed regionally, with major facilities spread across the north, west, centre, and south of the State rather than being concentrated in a single corridor.

7.10.2 Tamil Nadu plays a key role in India’s aviation network, with four international airports (Chennai, Trichy, Coimbatore, Madurai) and two domestic airports (Salem and Tuticorin), providing strong regional and international connectivity. These airports support industrial exports and passenger mobility, positioning the State as a major aviation hub in southern India.

7.10.3 To support airport expansion and modernisation, land valued at Rs. 2,938 crore has been acquired and handed over to the Airports Authority of India (AAI) for ongoing projects at Chennai, Coimbatore, Madurai, Tiruchirappalli, and Thoothukudi airports. Additional land acquisition worth Rs. 350 crore is underway for Salem Airport. Work on the proposed Greenfield Airport at Parandur, near Chennai, has been fast-tracked and a new airport has been proposed at Rameswaram – where AAI has begun the pre-feasibility study and two sites have been shortlisted (Uchipulli and Keelakarai).

Table 7.1Aircraft movements & passengers across Tamil Nadu: International and Domestic
Dec2025Dec 2024% change
Intl aircraft movementsIntl PassengersIntl aircraft movementsIntl PassengersIntl aircraft movementsIntl Passengers
Chennai3,6685,45,7013,3975,32,0128.00%2.60%
Coimbatore14923,77120629,725-27.70%-20.00%
Trichy7971,23,1348511,24,109-6.30%-0.80%
Madurai14020,54616523,269-15.20%-11.70%
Dec2025Dec 2024% change
Domestic aircraft movementsDomestic PassengersDomestic movementsDomestic PassengersDomestic movementsDomestic Passengers
Chennai9,04413,64,72710,68315,28,623-15.30%-10.70%
Coimbatore1,5522,40,6891,8412,61,141-15.70%-7.80%
Trichy70962,92169447,0652.20%33.70%
Madurai82496,2211,0841,07,191-24%-10.20%
Tuticorin31020,29630618,9171.30%7.30%
Salem1829,09519410,622-6.20%-14.40%
Source: Airports Authority of India. Note: Data pertains to international and domestic aircraft movements and passengers handled up to September of each year. · Survey, p. 160

7.10.4 Chennai International Airport’s Phase II expansion, costing Rs. 1,207 crore, is scheduled for completion and includes a new 86,135 sq. m terminal with upgraded passenger processing systems. Phase I, covering 1.49 lakh sq. m at a cost of Rs. 1,260 crore, was commissioned in April 2023. Upon completion of both phases, the airport will operate four integrated terminals with a capacity of over 3.5 crore passengers annually and more than 500 aircraft movements per day.

7.10.5 At Tiruchirappalli International Airport, nearly 90 % of land acquisition has been completed for extending the runway from 8,136 ft to 12,500 ft. Thoothukudi Airport has completed a major upgrade, including extension of the runway to 3,115 metres, introduction of nightlanding facilities and commissioning of a 17,340 sq. m Chettinad-style terminal with 21 check-in counters, 3 aerobridges and an increase in passenger handling capacity from 156 to 1,400 passengers per hour. At Coimbatore International Airport, AAI is developing a 75,000 sq. m terminal, expanding aircraft bays and taxiways, and proposing a runway extension to 3,800 metres.

7.10.6 The Tamil Nadu government has suffered a setback in its plans to establish an airport in Hosur, as the Ministry of Defence has once again denied airspace clearance citing operational requirements of Hindustan Aeronautics Limited, which controls the region’s airspace. The State had earlier sought relaxation in June last year and later submitted a detailed technical justification in November, but the request was rejected without discussions. Meanwhile, the Ministry of Civil Aviation has sought an impact study to assess whether the proposed airport would affect passenger traffic at Bengaluru or Salem airports, to be conducted by TIDCO.

7.10.7 Based purely on connectivity gaps and economic geography, priority should be given to developing new airports in the east coast delta region (Nagapattinam-Mayiladuthurai- Karaikal) and the far south-west belt (Tenkasi-Sankarankovil-Western Ghats edge). While these regions may not generate immediate international traffic, they present strong potential for regional airports to support balanced development and improve accessibility.

7.10.8 Bengaluru Airport continues to exceed Chennai International Airport’s international passenger traffic in South India, handling 694,550 passengers in December 2025.

§ 7.11Ports

7.11.1 Tamil Nadu’s port sector continued to expand steadily, supported by improvements in cargo handling, hinterland connectivity and logistics infrastructure. Chennai Port Authority and Kamarajar Port Limited together handled 103.37 million metric tonnes (MMT) of cargo, in FY 2024-25, registering a combined year-on-year growth of 6.7 %. Chennai Port handled 54.96 MMT, recording a 6.5 % increase, while Kamarajar Port handled 48.41 MMT, continuing its positive growth momentum.

7.11.2 V.O. Chidambaranar Port Authority has entered into a joint venture with the Government of Tamil Nadu to develop a large shipbuilding and heavy industries cluster at Tuticorin, marking a significant step towards strengthening India’s domestic maritime manufacturing capabilities.The port authority announced that a special purpose vehicle titled National Shipbuilding and Heavy Industries Park, Tamil Nadu has been incorporated as a 50:50 partnership between VOCPA and the State Industries Promotion Corporation of Tamil Nadu. The proposed cluster will focus on the development of commercial shipbuilding and ship repair facilities, along with allied heavy industries, with the objective of enhancing domestic capacity and reducing dependence on overseas shipyards.

Table 7.2Details of Ports in Tamil Nadu
Port TypePort NameLocationKey Features & Activities
Major PortsChennai PortChennaiSecond largest Indian port, major container and cargo hub; handles textiles, leather, industrial goods
Kamarajar Port (Ennore Port)Near ChennaiCorporatized port, bulk cargo including coal, petroleum; thermal power imports
Tuticorin Port (VOC Port)ThoothukudiFourth largest container terminal, exports salt, fertilizer, coal; significant regional trade
Non-Major PortsCuddalore PortCuddaloreMainly handles coal, petroleum products
Nagapattinam PortNagapattinamFishing harbor and minor cargo handling
Porto Novo PortParangipettaiMinor port for regional trade
Thoothukudi Fishing HarbourThoothukudiFishing harbor
Other Small/ Intermediate PortsVarious coastal locationsHandling local cargo, fisheries, and small trade
Survey, p. 162

7.11.3 The financial performance of Tamil Nadu’s major ports remained strong in 2024-25, with combined operational income exceeding Rs. 2,200 crore. Chennai Port recorded revenues of Rs. 1,094.34 crore, while Kamarajar Port generated Rs. 1,138.42 crore. Kamarajar Port also achieved a record Profit After Tax of Rs. 539.33 crore, crossing the Rs. 500 crore mark for the first time, supported by higher capacity utilisation, improved efficiency and sustained demand from energy and bulk cargo segments.

7.11.4 A major initiative is the Multi-Modal Logistics Park at Mappedu in Tiruvallur district, being developed over 184.27 acres at a cost of Rs. 1,424 crore. The project will provide integrated freight handling, warehousing, value-added services and road-rail connectivity. Phase 1 is expected to reduce logistics costs for industrial clusters in Chennai, Sriperumbudur, Oragadam and Tiruvallur, while strengthening export competitiveness through Chennai and Kamarajar ports.

7.11.5 Overall, the maritime sector’s performance in 2024–25 reflects sustained investment in port efficiency, rising industrial output and strengthening of logistics network. With ongoing port expansions, the upcoming Mappedu Multi-Modal Logistics Park and improvements in operational capacity, Tamil Nadu is well positioned to consolidate its role as a leading gateways for India’s international trade.

Table 7.3Major Port-wise Monthly Cargo handled
Name of PortsDecember 2024December 2025Percentage change in Dec 2025 over Dec 2024
Cargo handled (Provisional)Cargo handled (Advanced estimates)Percent Share
KamarajarOverseas23,57,58224,67,1043.924.65
Coastal18,38,72718,50,6069.950.65
Total41,96,30943,17,7105.32.89
ChennaiOverseas48,16,47346,38,9587.38-3.69
Coastal5,09,6674,59,2332.47-9.9
Total53,26,14050,98,1916.26-4.28
VOCOverseas19,38,95928,98,8734.6149.51
Coastal8,83,6477,56,8754.07-14.35
Total28,22,60636,55,7484.4929.52
Source: Sagar Unnati Dashboard, Ministry of Ports, Shipping and Waterways · Survey, p. 163

7.11.6 The average vessel turnaround time at India’s major port is 49.69 hours. Chennai Port recorded an average turnaround time of 38-39 hours during April-October 2025, showing improvement over previous years due to digital tracking systems and berth expansion.

Figure 7.2Average Turnaround Time of Major Ports in India
Hours
0255075100
OverallHaldia DockKolkata DockParadip PortVisakhapatnamKamarajar PortChennai PortV.O. ChidambaranarCochin PortNew MangaloreMormugao PortJawaharlal NehruMumbai PortDeendayal Port

The three Tamil Nadu ports are shown in dark brown.

The numbers
Average turnaround time, 2025-26, hours
Overall49.32
Haldia Dock45.15
Kolkata Dock80.84
Paradip Port46.53
Visakhapatnam67.07
Kamarajar Port44.34
Chennai Port45.64
V.O. Chidambaranar60.48
Cochin Port32.64
New Mangalore41.66
Mormugao Port66.78
Jawaharlal Nehru27.40
Mumbai Port65.87
Deendayal Port58.85

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Source: Data from Sagar Unnati Dashboard, Ministry of Ports, Shipping and Waterways · Survey, p. 163

7.11.7 Vessel Turnaround time at Chennai Port has improved significantly from 2.5-3 days historically to 38.34 hours during April-October 2025. Under the Maritime India Vision 2030, the port targets turnover around time of under 20 hours. Container handling productivity averages 20-25 crane moves/hour, compared to 40-45 moves in Singapore. The commissioning of the Second Container Terminal has increased Chenai Port’s container handling capacity to 2.2 million TEUs.

7.11.8 In terms of global efficiency rankings, Chennai ranks 80th, while Kamarajar Port ranks 47th, with an average vessel turnaround time of 35.90 hours.

§ 7.12Digital Infrastructure: TANFINET

7.12.1 The BharatNet project is being implemented in the State by TANFINET with the support of the Union Government. The project envisages providing Optical Fibre Cable (OFC) connectivity to 12,525 Gram Panchayats. Connectivity has been extended to around 11,800 villages, with the entire network completed in approximately 10,000 villages. The Chief Minister, while addressing the Gram Sabha meetings held on October 11, utilised the BharatNet-TANFINET.

§ 7.13Urban water supply

7.13.1 In Chennai, 50 free smart water ATMs were launched in June. Equipped with IoT based technology, the water dispensing units worth ₹6.04 crore have been set up at public places including bus stands, government hospitals, commercial spaces and near educational institutions.

7.13.2 Under Jal Jeevan Mission-aligned schemes, 1,11,45,898 rural households have been provided with drinking water pipeline connections, with 13,80,767 more in progress. The status of drinking water supply in corporations and municipalities is detailed below.

Table 7.4Status Of Drinking Water Supply in Corporations and Municipalities
Urban Local BodiesLitres Per Capacita Daily (LPCD)No. of ULBs
CorporationsAbove 1357
110-1347
70-1099
Below 701
MunicipalitiesAbove 1359
110-13418
70-10998
Below 7012
Total161
Source: Municipal Administration and Water Supply Department Policy Note 25-26 · Survey, p. 165

§ 7.14Rejuvenation of Water Bodies

7.14.1 The details of water bodies located in the corporations and municipalities as per the State level Survey are given below:

Table 7.5Water Bodies Located in The Corporations And Municipalities
SI. NoUrban Local BodiesNo. of Water Bodies
1Corporations603
2Municipalities1,874
Total2,477
Source: Municipal Administration and Water Supply Department Policy Note 25-26 · Survey, p. 165

7.14.2 Mamallan Drinking Water Reservoir Project: Given the limited scope for developing additional surface water sources in Chennai and much of Tamil Nadu, the State Government has proposed the ₹342.6-crore Mamallan Drinking Water Reservoir Project to augment Chennai’s water supply. The proposed reservoir, located near Mamallapuram in Chengalpattu district, is designed to harness surplus flows from the Manamathy group of tanks and the Kovalam sub-basin.

§ 7.15Artificial Groundwater recharge Programme

7.13.1 According to the Tamil Nadu Groundwater Resource Assessment 2024, 392 out of 1,202 firkas are classified as over-exploited, with groundwater extraction exceeding 100 % of annual recharge, marginally lower than 395 firkas in 2023. Districts with high extraction rates, including Ranipet, Vellore, Tirupattur, Salem, Dharmapuri and Villupuram, have been prioritised. The Water Resources Department (WRD) has approved a large-scale project for the installation of artificial recharge shafts to enhance groundwater percolation and stabilise the water table in over-exploited and critical blocks across the State. Under the project, about 576 recharge shafts will be installed in 23 districts. These structures are expected to minimise evaporation losses and accelerate recharge compared to natural processes. The impact of each recharge shaft is expected to extend over a radius of 500 metres to 1 kilometre.

§ 7.16Streetlights

7.16.1 A total of 9.5 lakh streetlights are maintained across 24 corporations (excluding Greater Chennai Corporation) and 137 municipalities. Additional streetlights are being provided to meet the standard of one streetlight every 30 metres. Considering the LUX values, wattage, safe installation, maintenance and environmental safety, energy efficient LED streetlights are being installed in ULBs to reduce energy consumption by 40%.

7.16.2 A total of 32,364 km of roads are maintained in corporations and municipalities. Funds under various schemes are allotted for priority restoration of roads older than 5 years. Details of urban roads are given in the following table:

Table 7.6Details of Urban Roads
SI.NoClassification of roadsTotal Length (in km)Percentage
1Cement Concrete Roads7,04322
2BT Roads20,58164
3WMM Roads2071
4Earthen Roads2,4717
5Paver Blocks and other roads2,0626
Total32,364100
Source: Municipal Administration and Water Supply Department Policy Note 25-26 · Survey, p. 166

7.16.3 During the period 2021-22 to 2024-25, 65,184 roads works covering 11,177.23 km were undertaken under Kalaignar Nagarpura Mempattu Thittam, Capital Grant Fund, Tamil Nadu Sustainable Urban Development Project and State Finance Commission Grants.

§ 7.17Bus Stands

7.17.1 A total of 184 bus stands are being maintained across various corporations and municipalities, as given in Table below: and annual income respectively.

Table 7.7Bus Stands Across Various Municipalities and Corporations
GradeNumber of Bus Stands
CorporationsMunicipalitiesTotal
A211435
B114253
C56368
D62228
Total 43141184
Source : Municipal Administration and Water Supply Department Policy Note 25-26 Note: The corporations and municipalities are classified into different grades based on population · Survey, p. 167

7.17.2 Panjappur Integrated Bus Terminus, Tamil Nadu’s first and largest fully air-conditioned bus terminus, was inaugurated in 2025 and is now operational for both mofussil and city buses. Additionally, between 2022-25, 18 new bus stands (Rs. 176.27 crore) and 45 upgrades (Rs. 146.53 crore) were sanctioned under Kalaignar Nagarpura Mempattu Thittam, Capital Grant Fund and Operation and Maintenance Deficit Grant Fund.

§ 7.18Parks

7.18.1 During the period 2021-22 to 2024-25, 466 parks were improved under Kalaignar Nagarpura Mempattu Thittam, Namakku Naame Thittam, Capital Grant Fund, 15th Finance Commission Grants and AMRUT 2.0 at a total cost of Rs. 182.13 crore.

§ 7.18.aII. Rural Infrastructure

§ 7.19Basic Infrastructure

7.19.1 Tamil Nadu has long prioritized rural development, aiming to provide rural residents with infrastructure and amenities comparable to urban areas. Recent initiatives cover roads, drinking water, housing, governance, sanitation, social equality, and employment, positioning the State as a leader in rural transformation. For rural development, the state had allocated Rs. 13,131.8 crore for 2025-26 (BE), which is 15% more than the actual expenditure for 2024-25, Rs. 11,403 (and Rs. 8,922 crore in 2023-24).

7.19.2 To strengthen local governance, administrative sanction limits have been raised: Village Panchayats from Rs.2 lakh to Rs.5 lakh, Block Panchayats from Rs.10 lakh to Rs.20 lakh, and District Panchayats from Rs.20 lakh to Rs.50 lakh. This empowers local bodies, reduces delays, and supports participatory planning.

7.19.3 A total of 600 Village Secretariats have been established to coordinate public service delivery. Special grants of Rs.69 crore have been provided to 690 panchayats near urban areas, and Rs.30 crore to 278 hilly panchayats to improve infrastructure and service delivery.

7.19.4 Anaithu Grama Anna Marumalarchi Thittam (AGAMT), inducted in 2006, aims to improve the overall basic infrastructure facilities in all village panchayats in a phased manner. It was relaunched in 2021-22 as AGAMT-II. Rejuvenation of ponds, upgrading streets and lanes, installing streetlights, ensuring livelihood and marketing facilities, among others, are undertaken under this initiative. The second phase of the Anaithu Grama Anna Marumalarchi Thittam was sanctioned Rs. 1,087 crore during 2025-26 to be implemented in 2,329 village panchayats – aiming to allocate a minimum of 30% funds for SC/ST habitation areas. The Revival of Rural Libraries Scheme renovated 7,924 libraries at Rs.176.02 crore, supporting literacy, education, and community access to knowledge, especially for students and women.

§ 7.20Rejuvenation of Minor Irrigation Tanks

7.20.1 Water management has been strengthened through revitalization of minor irrigation tanks. Of the 5,000 tanks targeted for 2024–25, 3,194 are being restored with State funding (Rs.213.07 crore) and 706 through NGOs and voluntary organisations (Rs.45.39 crore), improving irrigation, groundwater recharge, and climate resilience.

§ 7.21Rural Roads and Connectivity

7.21.1 Rural connectivity has expanded significantly. Under Mudalvarin Grama Saalaigal Membattu Thittam, 12,572 km of roads across 9,696 projects have been improved. Under the Pradhan Mantri Gram Sadak Yojana, 4,182 km of roads, 947 segments, and 83 bridges were undertaken. Under the NABARD Rural Infrastructure Development Fund 505 km of roads and 308 bridges have been completed..

§ 7.22Housing Infrastructure

7.22.1 Under Kalaignarin Kanavu Illam, 2 lakh concrete houses have been sanctioned (Rs.7,000 crore), with over 1 lakh houses completed. Hon’ble Chief Minister has announced the sanctioning of additional 1 lakh houses in the current year. Repairs to 1,48,634 rural houses were sanctioned (Rs.1,041.32 crore), with 1,03,177 completed. Reconstruction of pre-2000 houses under Mudhalamaicharin Veedugal Marukattumana Thittam is underway for 15,485 houses.

§ 7.23Sanitation and Drinking Water Supply

7.23.1 Since 2021, 3,38,357 Individual Household Latrines have been constructed. For households without space, 2,123 Community Sanitary Complexes (Rs.127.05 crore) and 6,684 Mini Community Sanitary Complexes near schools and public spaces (Rs.195.43 crore) have been established.

§ 7.23.aIII. Energy

§ 7.24Power Demand

7.24.1 Tamil Nadu’s energy sector is expanding to meet rising household, industrial, and service electrification demands. The State emphasizes reliable, high-quality power and leverages substantial renewable energy potential. It ranks third in India for total installed renewable capacity and second in wind power. The Government targets 50% of total energy consumption from renewables and a 70% reduction in carbon emissions by 2030, aiming for a resilient, low-carbon energy ecosystem.

7.24.2 Power demand continues to rise with industrial growth, urbanisation, and household electrification. Peak demand and daily energy consumption have increased year on year. To meet this, Tamil Nadu has expanded its electrical infrastructure—adding substations, HT and LT lines, and distribution transformer capacity. Initiatives such as the Mass Maintenance Programme and conversion of overhead lines to underground cables have improved service quality, reduced outages, and ensured voltage stability in low voltage and overloaded areas, strengthening the distribution network for reliable and uninterrupted power supply.

Figure 7.3Peak Demand (MW) (2019-20 to 2024-25)
  • Peak demand, MW
MW
05,00010,00015,00020,00025,000
2019-202020-212021-222022-232023-242024-25
The numbers
Peak demand, MW
2019-2016,151
2020-2116,481
2021-2217,196
2022-2318,053
2023-2419,409
2024-2520,830

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Survey, p. 170
Figure 7.4Maximum Consumption/MU (2019-20 to 2024-25)
  • Maximum daily consumption, million units
Million units
0100200300400500
2019-202020-212021-222022-232023-242024-25
The numbers
Maximum daily consumption, million units
2019-20369.940
2020-21362.073
2021-22375.699
2022-23388.078
2023-24426.439
2024-25454.320

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

Source: Energy Policy Note 25-26 · Survey, p. 171

7.24.3 Tamil Nadu Green Energy Corporation Ltd. (TNGECL) has received approval from the Tamil Nadu Electricity Regulatory Commission (TNERC) to procure 1,500 MWh of Battery Energy Storage Systems through tariff-based competitive bidding with e-reverse auction. The projects, equivalent to 375 MW with four-hour duration, will be set up at seven TANTRANSCO substations under the State component of the Union Ministry of Power’s Viability Gap Funding scheme on a Build-Own-Operate basis for 15 years.

Table 7.8Installed Capacity of Tamil Nadu’s Grid as on 01.04.2025
SI NoCategoryCapacity in MW
IConventional Energy Sources
1Thermal5,120.00
2Gas408.20
3Central Generating Stations (CGS)6,953.00
4Power Purchases4,092.50
Independent Power Projects (IPP)1,105.50
Long Term Open Access (LTOA)2,835.00
Medium Term Open Access (MTOA)152.00
5CPP/Third party generators** (Approved open access quantum)140.17
Total Conventional16,713.87
IIRenewable Energy Sources
1Hydro2,323.90
Non-Irrigation1,032.65
Pumped Storage400.00
Irrigation891.25
2Wind**9,331.37
3Solar*** (STU connected - 9,006.27 MW, Roof Top -1,003.346 MW)10,009.61
LTOA (through PSA with SECI)500.00
4Bio-mass - combustion206.79
5Co-Generation (Bagasse)684.40
Total Renewables23,056.07
Grand Total39,769.94
# includes North Chennai Stage III 1*800 MW $ 50 MW Power Supply Agreement has expired on 09.04.2025 * : Open access quantum approved to the Fossil Fuel based Captive/Third party generators for wheeling power through TANTRASCO network to the EHT/HT consumers of TNPDCL ** : Excluding 2,030.49 MW of wind connected to CTU *** : Excluding 150 MW of solar connected to CTU
Source: Energy Policy Note 25-26. · Survey, p. 172

7.24.4 TNERC has also approved tenders for a 30 MW grid-connected solar photovoltaic project with a 30 MW / 90 MWh battery energy storage system in Karur and Thiruvarur districts, to be implemented in two blocks of 15 MW / 45 MWh each under the Build-Own-Operate model for 25 years. In addition, approval has been accorded for a 34.75 MW hybrid renewable energy project comprising 18.75 MW of wind and 16 MW of solar capacity at wind farm sites in Kayathar, Puliankulam and Muppandal.¹

§ 7.25Renewable Energy Status in Tamil Nadu

7.25.1 Over the years, Tamil Nadu has been able to make remarkable progress in the energy sector, emerging as one of the leading states contributing significantly to the expansion of renewable energy generation, as well as installed capacity in the country. As of 31st March 2025, the total installed capacity of the state stands at 25241.36 MW, placing it third among the states in the country after Gujarat and Rajasthan (see Figure 9.4). According to the Renewable Energy Statistics 2023-2024, the installation of Renewable Energy (RE) capacity exceeded that of the non-RE sector in Tamil Nadu as early as 2020- 21. The contribution of RE to the state’s total installed capacity significantly increased from 44.7% in 2017-18 to 55.49% by 2023-2024. Over the past decade, the renewable energy sector has experienced a remarkable transformation, with solar power assuming a central role overall with an increase in installations from 156.83 MW to 8,211.38 MW, marking an expansion of 5,135.85% and a Compound Annual Growth Rate (CAGR) of 55.24% between 2014 -15 and 2023 - 24. Wind energy also constitutes a major share of total renewable energy capacity in Tamil Nadu, with 11739.91 MW generated from wind power, making the state one of the largest contributors to wind power in the country. Table 9.2 below shows the renewable energy installed capacity in the state as of 30.11.2025.

7.25.2 Tamil Nadu stands as a leader in India’s energy transition, with an increasing renewable energy capacity, which stands at 25,241 MW as of late 2025. Yet, a significant disparity exists between potential power generation and actual generation. While renewable energy constitutes a major part of the state’s total installed capacity, they typically contribute only 25% to 27% of the total electricity consumed annually. This gap is primarily driven by the Capacity Utilization Factor (CUF). Unlike thermal power plants, which provide steady baseload power, solar and wind energy sources are intermittent, with solar energy supply being constrained by daylight and wind energy being susceptible to high seasonality. Furthermore, the state faces infrastructure bottlenecks where the existing grid cannot always transport surges of power from southern districts to northern industrial hubs. Since large-scale battery storage is still in its early stages of development, the state must maintain coal and nuclear plants to ensure a stable power supply. Additionally, the system often prioritizes stable power sources to prevent blackouts.

Figure 7.5Renewable Energy Capacity: Over the Years in TN (top) and Across Top Five States (bottom)
  • Renewable capacity installed in Tamil Nadu, GW
GW
051015202530
2020-212021-222022-232023-242024-25
The numbers
Renewable capacity installed in Tamil Nadu, GW
2020-2117.48
2021-2218.28
2022-2320.10
2023-2422.16
2024-2525.24

Numbers printed on the Survey’s chart are given as printed. Values marked ≈ are measured from the drawing and are close, not exact.

  • Small hydro
  • Wind
  • Bio-power
  • Solar
  • Large hydro
  • Total
GW
010203040
Gujarat 2024Gujarat 2025Karnataka 2024Karnataka 2025Maharashtra 2024Maharashtra 2025Rajasthan 2024Rajasthan 2025Tamil Nadu 2024Tamil Nadu 2025

Tamil Nadu’s figures as of 30 November 2025 are printed in Table 7.9: wind 12.01 GW, solar 11.52, bio-power 1.05, large hydro 2.18, small hydro 0.12, total 26.88.

The numbers
Small hydroWindBio-powerSolarLarge hydroTotal
Gujarat 2024≈ 0.1≈ 11.8≈ 0.1≈ 13.5≈ 2.0≈ 27.5
Gujarat 2025≈ 0.1≈ 12.7≈ 0.1≈ 18.6≈ 2.0≈ 33.4
Karnataka 2024≈ 1.3≈ 6.0≈ 1.9≈ 8.6≈ 3.7≈ 21.5
Karnataka 2025≈ 1.3≈ 7.3≈ 1.9≈ 9.7≈ 3.7≈ 23.9
Maharashtra 2024≈ 0.4≈ 5.2≈ 2.6≈ 6.3≈ 3.0≈ 17.5
Maharashtra 2025≈ 0.4≈ 5.3≈ 2.9≈ 10.7≈ 3.0≈ 22.4
Rajasthan 2024≈ 0.0≈ 5.2≈ 0.1≈ 21.4≈ 0.4≈ 27.2
Rajasthan 2025≈ 0.0≈ 5.2≈ 0.1≈ 28.4≈ 0.4≈ 34.1
Tamil Nadu 2024≈ 0.1≈ 10.6≈ 1.0≈ 8.2≈ 2.2≈ 22.1
Tamil Nadu 2025≈ 0.1≈ 11.7≈ 1.0≈ 10.2≈ 2.2≈ 25.3

This panel prints no numbers; read from the drawing, close, not exact.

Survey, p. 174
Table 7.9Composition of Renewable Energy Capacity in TN – 2025 as of 30.11.2025
SourceCapacity in MW
Wind Power12,014.34
Total Solar Power11,516.39
Total Bio Power1,046.62
Large Hydro Power2,178.2
Small Hydro Power123.05
Total RE Installed Capacity26,878.60
Source: Ministry of New and Renewable Energy, State-wise (Location based) installed capacity of Renewable Power as on 30.11.2025. · Survey, p. 175

§ 7.25.aWind Energy

7.25.3 Wind energy forms the backbone of Tamil Nadu’s renewable portfolio, with an installed capacity of 12014.34 MW and an estimated onshore potential of 95 GW. Annual generation is around 13,000 million units, meeting nearly 10% of the State’s consumption. The State recorded its highest wind generation peak of 5,899 MW on 30 July 2024.

7.25.4 Tamil Nadu leads India in wind repowering, being the first State with a structured programme. One hundred older turbines have been repowered to 27.67 MW, and a total of 2,113 turbines (1,514.77 MW) will benefit from the 2024 Repowering, Refurbishment, and Life Extension Policy, expected to boost generation by 25%. The Muppandal Wind Farm remains one of the world’s largest onshore wind farms, highlighting the State’s longterm leadership in wind power.

§ 7.25.bOffshore Wind

7.25.5 Tamil Nadu has one of the world’s strongest offshore wind zones, with an estimated 35 GW potential between Kanyakumari and Nagapattinam. The State has approved procurement of 2,000 MW at Rs.4/unit, with the first 500 MW (3 MW turbines) under implementation. Offshore wind is expected to become a key component of the State’s long-term energy mix as grid integration and transmission capacity expand.

§ 7.25.cSolar Power

7.25.6 Tamil Nadu ranks fourth in India for solar capacity, with 10,159.61 MW installed (rooftop and grid-connected) as of March 2025. The State recorded its highest solar peak of 6,579 MW on 16 February 2025 and generated 13,216 million units between April 2024 and February 2025. Rooftop solar continues to expand under net-metering frameworks, supported by Rs.28.40 crore in incentives, though production remains limited to daylight hours.

§ 7.25.dBattery Energy Storage Systems (BESS)

7.25.7 BESS enables time-shifting of solar generation, reducing dependence on thermal power. Two projects with combined investment of Rs.200 crore are expected to deliver a levellized tariff of Rs.6.49/unit, saving Rs.90 crore over 25 years. TNGECL plans 1,000 MWh under viability gap funding and an additional 4,000 MWh over the medium term. Storage is critical for grid stability, peak load management, and extending solar availability beyond daylight.

§ 7.25.eHydro Power and Pumped Storage

7.25.8 Hydro supports reliability during peak demand and variable renewable output. In 2024–25, hydro generation target of 4,329 million units was surpassed by January. Key assets were restored or uprated: Kadamparai pumped storage, Kodayar II (40 MW), Moyar (12→14 MW), Kundah II, and mini powerhouses (256.61 million units). For 2025–26, hydro generation target is 4,497 million units, with ongoing upgrades including penstock replacement and automated trash rack cleaning.

§ 7.25.fThermal and Hydro Additions Under Execution

7.25.9 Thermal projects totaling 2,640 MW and hydro projects of 520 MW are underway to provide baseload support, complementing renewable generation and ensuring supply adequacy in 2025–26.

§ 7.25.gCoal Handling and Shipping Operations

7.25.10 Coal for thermal plants is transported from Paradip, Gangavaram, Dhamra, Vizag, and Gopalpur to Ennore, Tuticorin, and Karaikal. In 2023–24, 19 million tonnes were moved efficiently by sea, achieving a single-voyage record of 92,500 tonnes. Strategic vessel replacement and shifting bunkering operations saved Rs.63.86 crore. A web-based system monitors vessel movement, coal quantities, and payments, with further upgrades planned.

§ 7.25.hGreen Energy Corridor

7.25.11 The Green Energy Corridor enables renewable power evacuation to load centres. Phase I was supported by Rs.529.31 crore from the National Clean Energy Fund and Rs.573.26 crore from KfW. Phase II, funded by Rs.237.52 crore (Union grant), Rs. 473.12 crore (KfW loan), and Rs.296 crore TANTRANSCO equity, will establish extra high-tension lines and substations to strengthen intrastate renewable transmission, reduce curtailment, and support the 50% renewable consumption target by 2030.

§ 7.26Conclusions

7.26.1 Tamil Nadu’s infrastructure trajectory in 2025–26 reflects a shift from asset creation to systems-based development centred on scale, sustainability, and integration. Rising capital expenditure is strengthening transport, urban services, logistics, energy, and rural connectivity through digital platforms, institutional reforms, and climate-responsive design, signalling a transition toward resilient infrastructure. A people-centric mobility strategy—marked by electric buses, metro expansion, multimodal integration, and Chennai’s Comprehensive Mobility Plan and One Mobility App—advances clean and inclusive transport, while rail scaling, MRTS–CMRL integration, logistics parks, port growth, and airport expansion reinforce the State’s trade and connectivity role. Urban investments in water, sanitation, flood mitigation, and climate-adaptive design, alongside rural road upgrades, tank revitalisation, housing, and local governance programmes, promote liveability and spatial inclusion. Energy initiatives—anchored in wind and solar leadership, storage, offshore development, pumped hydro, and transmission upgrades— support the transition to a reliable, renewable-heavy grid. Collectively, these efforts constitute a coherent model linking economic expansion with environmental responsibility, though outcomes will hinge on coordination, fiscal discipline, regulatory efficiency, and implementation capacity; if addressed, Tamil Nadu is positioned to consolidate its status as one of India’s most advanced and resilient infrastructure economies.